Notices
992 2019-Present The Forum for the Non-Turbo 911
Sponsored by:
Sponsored by:

Official waiting room for those with a new 992 on order --- come on in !!

Thread Tools
 
Search this Thread
 
Old 07-10-2020, 11:55 AM
  #1936  
OK911
Rennlist Member
 
OK911's Avatar
 
Join Date: Jul 2017
Posts: 59
Received 111 Likes on 28 Posts
Default Change Freeze Point Reached

Reached my lock date today. Projected delivery date is 10/23. It going to be a long 3.5 months! Build code is: PM8QA874
The following 4 users liked this post by OK911:
Dan Nagy (07-10-2020), doug992 (07-12-2020), Drizz (07-10-2020), Metalblond (07-11-2020)
Old 07-10-2020, 01:25 PM
  #1937  
hal2626
AutoX
 
hal2626's Avatar
 
Join Date: May 2020
Posts: 12
Likes: 0
Received 2 Likes on 2 Posts
Default

What a great deal. Congrats! May I ask where you ordered it and your SA's name. I'm thinking of ordering a 2021 992 S and I have been looking for hours every day. I'm ready to pull the trigger. Thanks! Hal hal26@gvtc.com
Old 07-11-2020, 08:05 PM
  #1938  
melbay
Advanced
 
melbay's Avatar
 
Join Date: Aug 2014
Location: PA
Posts: 96
Likes: 0
Received 30 Likes on 19 Posts
Default

Had a V070 code on May23 . Still no V200 as of today.Have a commission number. Does something seem a little funny?
Old 07-11-2020, 08:26 PM
  #1939  
inastrangeland
Burning Brakes
 
inastrangeland's Avatar
 
Join Date: Dec 2015
Location: Colorado
Posts: 1,025
Received 703 Likes on 352 Posts
Default

Originally Posted by melbay
Had a V070 code on May23 . Still no V200 as of today.Have a commission number. Does something seem a little funny?
what is your allocation month? Ask for a printout of your tracking information. That will have all your dates.
Old 07-11-2020, 08:30 PM
  #1940  
inastrangeland
Burning Brakes
 
inastrangeland's Avatar
 
Join Date: Dec 2015
Location: Colorado
Posts: 1,025
Received 703 Likes on 352 Posts
Default

Originally Posted by OK911
Reached my lock date today. Projected delivery date is 10/23. It going to be a long 3.5 months! Build code is: PM8QA874
you must have a September production date. Just missed July.
Old 07-11-2020, 09:39 PM
  #1941  
OK911
Rennlist Member
 
OK911's Avatar
 
Join Date: Jul 2017
Posts: 59
Received 111 Likes on 28 Posts
Default

Originally Posted by inastrangeland
you must have a September production date. Just missed July.
Yes. 9/4 according to TYD.
Old 07-11-2020, 11:13 PM
  #1942  
Vintage72
Burning Brakes
 
Vintage72's Avatar
 
Join Date: Nov 2015
Location: Austin
Posts: 1,170
Received 400 Likes on 199 Posts
Default

Originally Posted by OK911
Yes. 9/4 according to TYD.
Me too, locked yesterday, production scheduled 7/24, production start date is 9/4, dealer delivery in late October. I just missed a late July build!!!! That is okay, it will be even sweeter when it arrives in October.
The following users liked this post:
Metalblond (07-12-2020)
Old 07-11-2020, 11:22 PM
  #1943  
markchristenson
Three Wheelin'
 
markchristenson's Avatar
 
Join Date: May 2006
Location: Texas
Posts: 1,262
Received 640 Likes on 392 Posts
Default

Originally Posted by inastrangeland
what is your allocation month? Ask for a printout of your tracking information. That will have all your dates.
This.
Old 07-12-2020, 09:05 AM
  #1944  
Master Deep
Rennlist Member
 
Master Deep's Avatar
 
Join Date: Oct 2004
Location: Sarasota, FL
Posts: 1,282
Received 751 Likes on 425 Posts
Default

Looking for advice on when to order. I want a Mid-December to January delivery with PEC Atlanta. My birthday is 12/28 and I wanted to enjoy some of the top down weather. I live in Sarasota, FL, right near Suncoast.

Any recommendations on when I should order by for a loaded C2S Cab?
Old 07-12-2020, 09:31 AM
  #1945  
Metalblond
Pro
 
Metalblond's Avatar
 
Join Date: Mar 2020
Location: Boston, MA
Posts: 675
Received 463 Likes on 254 Posts
Default

Originally Posted by Master Deep
Looking for advice on when to order. I want a Mid-December to January delivery with PEC Atlanta. My birthday is 12/28 and I wanted to enjoy some of the top down weather. I live in Sarasota, FL, right near Suncoast.

Any recommendations on when I should order by for a loaded C2S Cab?
I think your best bet is ask your dealer and see when they have an allocation that is closest to the dates that you want. Good luck!
The following 5 users liked this post by Metalblond:
brucewinter (07-12-2020), Dan Nagy (07-12-2020), doug992 (07-12-2020), Master Deep (07-12-2020), Todd C (07-12-2020)
Old 07-12-2020, 11:56 AM
  #1946  
Master Deep
Rennlist Member
 
Master Deep's Avatar
 
Join Date: Oct 2004
Location: Sarasota, FL
Posts: 1,282
Received 751 Likes on 425 Posts
Default

Originally Posted by Metalblond
I think your best bet is ask your dealer and see when they have an allocation that is closest to the dates that you want. Good luck!
Thank You! Planning to start talking to dealers within the next month. Can’t wait to join this thread with a build slot!
Old 07-12-2020, 12:04 PM
  #1947  
Vintage72
Burning Brakes
 
Vintage72's Avatar
 
Join Date: Nov 2015
Location: Austin
Posts: 1,170
Received 400 Likes on 199 Posts
Default

Do not wait too long. Dealers receive their allocations 3 times per year from Porsche. So, the specific allocation you need is probably already in the dealer's hands or they will need to reserve/obtain one for you, and not many allocations are available right now due to solid demand and Covid shut down, etc. From my allocation/order/anticipated delivery by Porsche, the process takes about 4 months start to finish (numerous factors affect this - your location, August break, timing of order lock, etc.).

Good luck and I cannot wait to see your final build.
The following 2 users liked this post by Vintage72:
Master Deep (07-13-2020), Metalblond (07-12-2020)
Old 07-12-2020, 12:16 PM
  #1948  
Dan Nagy
Rennlist Member
 
Dan Nagy's Avatar
 
Join Date: Sep 2016
Location: The Beach
Posts: 4,509
Received 2,217 Likes on 1,116 Posts
Default

Originally Posted by Vintage72
Do not wait too long. Dealers receive their allocations 3 times per year from Porsche. So, the specific allocation you need is probably already in the dealer's hands or they will need to reserve/obtain one for you, and not many allocations are available right now due to solid demand and Covid shut down, etc. From my allocation/order/anticipated delivery by Porsche, the process takes about 4 months start to finish (numerous factors affect this - your location, August break, timing of order lock, etc.).

Good luck and I cannot wait to see your final build.
I wouldn’t wait at all. According to my SA and others reported here, allocations are down for this year.
The following 2 users liked this post by Dan Nagy:
Master Deep (07-13-2020), Metalblond (07-12-2020)
Old 07-13-2020, 03:18 PM
  #1949  
Anthony992
Rennlist Member
 
Anthony992's Avatar
 
Join Date: Feb 2020
Posts: 202
Received 144 Likes on 64 Posts
Default

Just spoke to Porsche NA and my car ('21 C2S) is in production scheduled to be complete 7/17, on a ship 8/7, arrive U.S. 8/21, and arrive at the dealer 9/11. Assuming extra time at Port is due to the model year change over. Inching closer to the finish line!
Old 07-13-2020, 03:26 PM
  #1950  
inastrangeland
Burning Brakes
 
inastrangeland's Avatar
 
Join Date: Dec 2015
Location: Colorado
Posts: 1,025
Received 703 Likes on 352 Posts
Default

Originally Posted by Anthony992
Just spoke to Porsche NA and my car ('21 C2S) is in production scheduled to be complete 7/17, on a ship 8/7, arrive U.S. 8/21, and arrive at the dealer 9/11. Assuming extra time at Port is due to the model year change over. Inching closer to the finish line!
Yep same dates and probably same ship. What port is it landing in the US?


Quick Reply: Official waiting room for those with a new 992 on order --- come on in !!



All times are GMT -3. The time now is 04:14 PM.