Official waiting room for those with a new 992 on order --- come on in !!
The following 4 users liked this post by OK911:
#1937
What a great deal. Congrats! May I ask where you ordered it and your SA's name. I'm thinking of ordering a 2021 992 S and I have been looking for hours every day. I'm ready to pull the trigger. Thanks! Hal hal26@gvtc.com
#1939
#1940
#1942
The following users liked this post:
Metalblond (07-12-2020)
#1944
Looking for advice on when to order. I want a Mid-December to January delivery with PEC Atlanta. My birthday is 12/28 and I wanted to enjoy some of the top down weather. I live in Sarasota, FL, right near Suncoast.
Any recommendations on when I should order by for a loaded C2S Cab?
Any recommendations on when I should order by for a loaded C2S Cab?
#1945
Looking for advice on when to order. I want a Mid-December to January delivery with PEC Atlanta. My birthday is 12/28 and I wanted to enjoy some of the top down weather. I live in Sarasota, FL, right near Suncoast.
Any recommendations on when I should order by for a loaded C2S Cab?
Any recommendations on when I should order by for a loaded C2S Cab?
The following 5 users liked this post by Metalblond:
brucewinter (07-12-2020),
Dan Nagy (07-12-2020),
doug992 (07-12-2020),
Master Deep (07-12-2020),
Todd C (07-12-2020)
#1946
#1947
Do not wait too long. Dealers receive their allocations 3 times per year from Porsche. So, the specific allocation you need is probably already in the dealer's hands or they will need to reserve/obtain one for you, and not many allocations are available right now due to solid demand and Covid shut down, etc. From my allocation/order/anticipated delivery by Porsche, the process takes about 4 months start to finish (numerous factors affect this - your location, August break, timing of order lock, etc.).
Good luck and I cannot wait to see your final build.
Good luck and I cannot wait to see your final build.
The following 2 users liked this post by Vintage72:
Master Deep (07-13-2020),
Metalblond (07-12-2020)
#1948
Do not wait too long. Dealers receive their allocations 3 times per year from Porsche. So, the specific allocation you need is probably already in the dealer's hands or they will need to reserve/obtain one for you, and not many allocations are available right now due to solid demand and Covid shut down, etc. From my allocation/order/anticipated delivery by Porsche, the process takes about 4 months start to finish (numerous factors affect this - your location, August break, timing of order lock, etc.).
Good luck and I cannot wait to see your final build.
Good luck and I cannot wait to see your final build.
The following 2 users liked this post by Dan Nagy:
Master Deep (07-13-2020),
Metalblond (07-12-2020)
#1949
Just spoke to Porsche NA and my car ('21 C2S) is in production scheduled to be complete 7/17, on a ship 8/7, arrive U.S. 8/21, and arrive at the dealer 9/11. Assuming extra time at Port is due to the model year change over. Inching closer to the finish line!
#1950
Yep same dates and probably same ship. What port is it landing in the US?