Official waiting room for those with a new 992 on order --- come on in !!
#2177
5 months tomorrow and almost out of the waiting room. Dealer sent me these. Will take delivery Tuesday!
The following 3 users liked this post by Drizz:
#2178
Burning Brakes
super cool! loving the motorsport stripe with the black wheels.
#2179
#2180
Burning Brakes
The following 3 users liked this post by Vintage72:
#2181
Rennlist Member
The following users liked this post:
Todd C (07-26-2020)
#2183
Three Wheelin'
#2184
#2185
Rennlist Member
Looks like I’ll be joining u guys soon at emden... my car is v300 and in transport to emden. What ships are going to Houston? Looks like med highway is our only bet before the break?
#2186
Burning Brakes
Yep, Mediterranean Highway docks in Houston on 8/19, leaves Emden on 8/1. Ask me how I know. We are tracking it in the Glovis Star thread. Technically, the MH is in port but not docked yet. They have to get a tug to bring them to the dock. I'll post up it's current status in the other thread.
#2187
So from the day I finished production to the day I was loaded was 18 days, even though my 911 was sitting in Emden 7 days before the Swift Ace left port which was going to Houston, same port that the Goodwood will deliver my 911.
If your 911 finished today then I doubt it will make the MH which will leave Aug. 1.
#2188
Burning Brakes
Unfortunately, I think you will miss the MH. To give you an idea of transport and loading times, my 911 was completed and ready for transport on 7/4. It was in transit on 7/6, and it arrived in Emden on 7/8. The Swift Ace docked on 7/12 and left on 7/15 however my 911 didn't make the Swift Ace. Instead it was loaded onto the Goodwood which didn't arrive in Emden until the 7/21. My 911 was loaded on 7/22.
So from the day I finished production to the day I was loaded was 18 days, even though my 911 was sitting in Emden 7 days before the Swift Ace left port which was going to Houston, same port that the Goodwood will deliver my 911.
If your 911 finished today then I doubt it will make the MH which will leave Aug. 1.
So from the day I finished production to the day I was loaded was 18 days, even though my 911 was sitting in Emden 7 days before the Swift Ace left port which was going to Houston, same port that the Goodwood will deliver my 911.
If your 911 finished today then I doubt it will make the MH which will leave Aug. 1.
#2189
I'm sure it does but considering I was sitting in Emden from 7/8 to 7/22 and the Swift Ace came to port 7/13 and left 7/15 leaving a full week after I was already in port, doesn't bode well for somebody who is trying to catch a boat that leaves in 4 days and they aren't even in port yet.
#2190
My car got to Emden on the 22nd. Going to Jacksonville. TYD is showing that it leaves on a boat on 8/14. I’m hoping it’ll be on Mediterranean Highway on the 1st instead. It ended up being produced and sent out to Emden a week early. The 8/14 date was when it was originally supposed to exit production on the 24th. So it got to Emden a week early, but still showing 8/14 boat. Btw, from what I read at the shipping site, Emden shuts down on the 14th for holiday. So whatever the 14th boat is will be the last for a few weeks.