Does anyone know if allocations come with pre-determined dates? For example, @md4dna got his V200 allocation yesterday. It seems a little long (removing August for vacation shutdown) until he's V250 lock date. That seems long. Then a week to build and 2 months till delivery seems ok.
Now, if I get my V200 tomorrow as I'm hoping, will my dates automatically be after his, or did my dealer get an allocation with a pre-determined set of dates?
Now, if I get my V200 tomorrow as I'm hoping, will my dates automatically be after his, or did my dealer get an allocation with a pre-determined set of dates?
#782
Intermediate
Does anyone know if allocations come with pre-determined dates? For example, @md4dna got his V200 allocation yesterday. It seems a little long (removing August for vacation shutdown) until he's V250 lock date. That seems long. Then a week to build and 2 months till delivery seems ok.
Now, if I get my V200 tomorrow as I'm hoping, will my dates automatically be after his, or did my dealer get an allocation with a pre-determined set of dates?
Now, if I get my V200 tomorrow as I'm hoping, will my dates automatically be after his, or did my dealer get an allocation with a pre-determined set of dates?
The following users liked this post:
AdamIsAdam (07-18-2021)
#783
Race Car
Does anyone know if allocations come with pre-determined dates? For example, @md4dna got his V200 allocation yesterday. It seems a little long (removing August for vacation shutdown) until he's V250 lock date. That seems long. Then a week to build and 2 months till delivery seems ok.
Now, if I get my V200 tomorrow as I'm hoping, will my dates automatically be after his, or did my dealer get an allocation with a pre-determined set of dates?
Now, if I get my V200 tomorrow as I'm hoping, will my dates automatically be after his, or did my dealer get an allocation with a pre-determined set of dates?
Now if you happen to run into an allocation that has already been made, then it can be shorter. If you stumble into a dealership that already has a V200, it could be days until it locks. I had one where somebody bombed out of the build and I picked it up with two weeks until it locked. Start to delivery was two months.
The following users liked this post:
AdamIsAdam (07-18-2021)
The following users liked this post:
Porsche2014 (07-18-2021)
#785
Yes, the lock dates can vary, but if you are V70 and hoping to move to V200, you will likely have a long lock date.
Now if you happen to run into an allocation that has already been made, then it can be shorter. If you stumble into a dealership that already has a V200, it could be days until it locks. I had one where somebody bombed out of the build and I picked it up with two weeks until it locked. Start to delivery was two months.
Now if you happen to run into an allocation that has already been made, then it can be shorter. If you stumble into a dealership that already has a V200, it could be days until it locks. I had one where somebody bombed out of the build and I picked it up with two weeks until it locked. Start to delivery was two months.
#786
Race Car
Mine goes V250 next week and builds August 30. Yes, maybe not until after hiatus depending when in September yours will be built. Your build looks like you are done, though, so probably no worries for you.
The following users liked this post:
Spyder Bite (07-19-2021)
#787
Rennlist Member
Join Date: Sep 2011
Location: Long Island, NY; South Florida
Posts: 4,087
Received 4,067 Likes
on
1,762 Posts
It goes into body shop on 8/30? The cars seem to take 7 days to build. Does anyone know when exactly they close the factory? One would think they would not close down with cars partly completed.
#788
Race Car
V200 Delivery date determined 06/02/2021
First date is Planned Date, second is Expected Date
V250 Vehicle fixed 07/30/2021 07/23/2021
V260 Vehicle entry to body shop (CP 0.0) 07/30/2021 08/27/2021
V270 Vehicle exit production (CP 7.8) 08/27/2021 09/03/2021
V300 Vehicle completion (CP 8.0) 08/27/2021 09/03/2021
V331 Entry port Emden 09/03/2021 09/03/2021
V332 Exit port Emden 09/24/2021 09/24/2021
U004 Entry port Jacksonville 10/08/2021 10/15/2021
The following users liked this post:
Spyder Bite (07-19-2021)
#789
Glad I got up early. I got this amazing picture of the Siem Cicero as it entered Halifax Harbour!
#790
I live ~1 hour away from the port where my car will be offloaded so I am planning to go for a drive to watch it come into port. Not sure ill be able to get a view of it coming off the boat but ill take the telephoto lens with me and see if I can snap a sneak peek!
#791
Pro
Haha this is hilarious!
I live ~1 hour away from the port where my car will be offloaded so I am planning to go for a drive to watch it come into port. Not sure ill be able to get a view of it coming off the boat but ill take the telephoto lens with me and see if I can snap a sneak peek!
I live ~1 hour away from the port where my car will be offloaded so I am planning to go for a drive to watch it come into port. Not sure ill be able to get a view of it coming off the boat but ill take the telephoto lens with me and see if I can snap a sneak peek!
The following users liked this post:
Porsche2014 (07-19-2021)
#792
Rennlist Member
I can confirm that 2022 production has started before their August factory vacation begins on 7/31. My 2022 GT4 is scheduled to go in the body shop (V260) on 7/23 and is scheduled for completion (V300) on 7/30. Estimated arrival in Houston port is 9/10. Fortunately I seem to have caught the last possible completion day before vacation. Whew!
Last edited by StormRune; 07-19-2021 at 12:33 PM.
The following 3 users liked this post by StormRune:
#793
Haha this is hilarious!
I live ~1 hour away from the port where my car will be offloaded so I am planning to go for a drive to watch it come into port. Not sure ill be able to get a view of it coming off the boat but ill take the telephoto lens with me and see if I can snap a sneak peek!
I live ~1 hour away from the port where my car will be offloaded so I am planning to go for a drive to watch it come into port. Not sure ill be able to get a view of it coming off the boat but ill take the telephoto lens with me and see if I can snap a sneak peek!
The following 2 users liked this post by Porsche2014:
P-car-Vancouver (07-19-2021),
StormRune (07-19-2021)
#794
Rennlist Member
Cars that begin production at a certain point last week in July will be paused during Factory shutdown for about 3 weeks. This happened to my 981. It went to body shop just before shut down. Completed production 1 month later because of shutdown. One could get a build tracking update from SA a week after scheduled build date to see if it’s off to the port before shutdown. 3 week swing for delivery to east coast just based on production timeline… 1 week versus 1 month.
The following users liked this post:
StormRune (07-19-2021)
#795
Pro
I can confirm that 2022 production has started before their August factory vacation begins on 7/31. My 2022 GT4 is scheduled to go in the body shop (V260) on 7/23 and is scheduled for completion (V300) on 7/30. Estimated arrival in Houston port is 9/10. Fortunately I seem to have caught the last possible completion day before vacation. Whew!
The following users liked this post:
P-car-Vancouver (07-19-2021)