PCNA to delay GT3 Production?

Thread Tools
 
Search this Thread
 
Old 03-15-2018, 07:47 PM
  #151  
Larry Cable
Rennlist Member
 
Larry Cable's Avatar
 
Join Date: Oct 2002
Location: S.F Bay Area
Posts: 25,771
Received 3,594 Likes on 2,339 Posts
Default

Originally Posted by GT3
Unless you are already past your original dates, don't stress it too much. There is a good chance is can switch back and go into production by your original date (or close to it). This has happened with several builds this year and they still end up arriving close to the original date. Production timing is very volatile right now and keeps being reshuffled every few days on all GT cars due to PTS volume and special production models (like the Exc Series and new Turbo Saffron paint process), or so I hear...
well my (confirmed) ED date of 5/22 is cancelled as of now.
Old 03-18-2018, 10:13 AM
  #152  
TurboDogue
Racer
 
TurboDogue's Avatar
 
Join Date: Mar 2011
Location: Houston, TX
Posts: 260
Received 5 Likes on 4 Posts
Default

So followed up w my SA and I just went from V220 to V250 in one day with my delivery st dealer date going from 5/25 to 6/1. So slight push back but not much. Very pumped about this car! Feel fortunate. March build.

Last edited by TurboDogue; 03-18-2018 at 10:29 AM.
Old 03-18-2018, 01:16 PM
  #153  
FourT6and2
Drifting
 
FourT6and2's Avatar
 
Join Date: Jan 2018
Location: San Francisco
Posts: 2,800
Received 652 Likes on 376 Posts
Default

Originally Posted by TurboDogue
So followed up w my SA and I just went from V220 to V250 in one day with my delivery st dealer date going from 5/25 to 6/1. So slight push back but not much. Very pumped about this car! Feel fortunate. March build.
Interesting. I have an 4/6 build with 6/1 delivery last I checked. I wonder if it's moved...
Old 03-18-2018, 03:29 PM
  #154  
carrering
Rennlist Member
Thread Starter
 
carrering's Avatar
 
Join Date: Sep 2006
Location: Not Germany :(
Posts: 1,289
Received 32 Likes on 18 Posts
Default

I had entry body shop at 3/16 and exit production on 3/23 originally fyi.


Originally Posted by 0to60
I am still on schedule for a 03/23 entry and a 04/06 exit.It could go either way, I make it under the wire or I’m delayed. FWIW the planned and expected date for entry into bodyshop are the same dates 03/23, its the exit dates that changed from 03/30 to 04/06.
Old 03-18-2018, 04:29 PM
  #155  
rshanholtz
Rennlist Member
 
rshanholtz's Avatar
 
Join Date: Jan 2006
Posts: 596
Received 166 Likes on 67 Posts
Default

Well guys I am out. My GT3 PTS Voodoo went from March build April delivery to June build August delivery over the last two months. I decided this week to give the allocation back to the dealer to pursue the RS allocation once he receives those (hopefully on Monday). I have zero faith the GT3 was not going to be moved back again as it has so many times. Plus don’t really want to wait until August to get a car and then get the RS end of year or thereabouts. So I am jumping into a manual Boxster GTS for Spring through winter to await the GT3RS. I know they are very different cars (GT3 vs Boxster GTS) but I need something now that is fun to drive. Maybe me bailing on the GT3 will make someone else very very happy. Now if the RS allocations come in and I am waiting until next Spring, at least I am in something for a year that will be enjoyable to drive.
Old 03-18-2018, 04:51 PM
  #156  
Homeles
Three Wheelin'
 
Homeles's Avatar
 
Join Date: Dec 2012
Location: SC
Posts: 1,663
Received 131 Likes on 83 Posts
Default

Wow. I went from a November delivery to September. Sounds like a lot of BS floating out there
Old 03-18-2018, 07:50 PM
  #157  
StudGarden
Burning Brakes
 
StudGarden's Avatar
 
Join Date: Nov 2013
Location: Midwest
Posts: 1,108
Received 47 Likes on 27 Posts
Default

Originally Posted by shizzle
^ my bet is on pending trade war with EU!
Lol why would that effect it? The flippers would just get the opportunity to pay even more.
Old 03-18-2018, 09:12 PM
  #158  
ChoyV
Racer
 
ChoyV's Avatar
 
Join Date: Mar 2015
Posts: 407
Received 35 Likes on 19 Posts
Default

I got my allocation 2 weeks ago and it went to V200 last 03/14. Expected to enter production on 5/4 with 6/29 delivery date. Let us see what will happen. My 2 previous experiences with Porsche production schedules were off by 1 week, gave or take. But regarding ED with Porsche, it's a hit or miss. It is hard to get the date that you prefer. I gave them 9 months in advance but still they were not able to provide that date that I requested. In contrast, early this month, I ask my BMW dealer for an M3 ED delivery on May this year and everything were finalized in a week with the date I requested. I will just do a Porsche Museum and factory tour. I just hope that my GT3T is past that stage when I am doing the factory tour.
Old 03-19-2018, 12:29 PM
  #159  
carrering
Rennlist Member
Thread Starter
 
carrering's Avatar
 
Join Date: Sep 2006
Location: Not Germany :(
Posts: 1,289
Received 32 Likes on 18 Posts
Default

Here is latest on my car. originally to be finished on 3/23. 4 month slip.
V200Delivery date determined ............................................ 03/19/2018
V250Vehicle fixed............................................ 06/29/2018 06/29/2018
V260Vehicle entry to body shop (CP 0.0) ........07/20/2018 07/20/2018
V270Vehicle exit production (CP 7.8) .............. 07/27/2018 07/27/2018
V300Vehicle completion (CP 8.0) .................... 07/27/2018 07/27/2018
V998European Delivery completed
Old 03-19-2018, 02:38 PM
  #160  
0to60
Three Wheelin'
 
0to60's Avatar
 
Join Date: Apr 2015
Posts: 1,975
Likes: 0
Received 12 Likes on 9 Posts
Default

Originally Posted by carrering
Here is latest on my car. originally to be finished on 3/23. 4 month slip.
V200Delivery date determined ............................................ 03/19/2018
V250Vehicle fixed............................................ 06/29/2018 06/29/2018
V260Vehicle entry to body shop (CP 0.0) ........07/20/2018 07/20/2018
V270Vehicle exit production (CP 7.8) .............. 07/27/2018 07/27/2018
V300Vehicle completion (CP 8.0) .................... 07/27/2018 07/27/2018
V998European Delivery completed
Did you ever hit V250 and if so what was the earliest date ? I assume once you hit V250 build is locked and you go into production on or near that scheduled date.
Old 03-19-2018, 04:17 PM
  #161  
carrering
Rennlist Member
Thread Starter
 
carrering's Avatar
 
Join Date: Sep 2006
Location: Not Germany :(
Posts: 1,289
Received 32 Likes on 18 Posts
Default

Originally Posted by 0to60
Did you ever hit V250 and if so what was the earliest date ? I assume once you hit V250 build is locked and you go into production on or near that scheduled date.
Yes it was on 2/23
Old 03-20-2018, 11:34 PM
  #162  
stpatsday
Rennlist Member
 
stpatsday's Avatar
 
Join Date: Feb 2011
Location: Chester Springs PA
Posts: 489
Received 127 Likes on 62 Posts
Default

I called PCNA and received news that our planned European delivery of our PTS Maritime GT3 is now pushed back from May to June.
Will keep you guys posted of any new developments...
Old 03-20-2018, 11:57 PM
  #163  
juanpablo046
Racer
 
juanpablo046's Avatar
 
Join Date: Aug 2014
Posts: 401
Received 30 Likes on 22 Posts
Default

Originally Posted by Larry Cable
As best as I understand it, production has been suspended for ~3 weeks in April; (based on the dates for my car on the build system) my car was originally scheduled to enter the bodyshop (V260) on 3/30
and was due to exit (V270) and enter (V280) on 4/13 and exit (V300) on 4/20, and now the expected dates are 5/25, 6/8 and 6/15 respectively, at a first approximation, I'd say that any car that begins production
prior to 3/30 is "safe" ... anyone thereafter will potentially be impacted.

hope this is useful for others...

YMMV
I'm kind of worried now. Last time I checked (3/8) V300 for me was planned for 3/30 (expected 3/23), should I be ok?

Originally Posted by carrering
Here is latest on my car. originally to be finished on 3/23. 4 month slip.
V200Delivery date determined ............................................ 03/19/2018
V250Vehicle fixed............................................ 06/29/2018 06/29/2018
V260Vehicle entry to body shop (CP 0.0) ........07/20/2018 07/20/2018
V270Vehicle exit production (CP 7.8) .............. 07/27/2018 07/27/2018
V300Vehicle completion (CP 8.0) .................... 07/27/2018 07/27/2018
V998European Delivery completed
When did you check that?
My car two weeks ago was like following, will check tomorrow for possible updates:

V200Delivery date determined ............................................ 11/3/2017
V250Vehicle fixed............................................ 02/23/2018 02/23/2018
V300Vehicle completion (CP 8.0) .................... 03/30/2018 03/23/2018


My car is Euro version
Old 03-21-2018, 11:36 AM
  #164  
juanpablo046
Racer
 
juanpablo046's Avatar
 
Join Date: Aug 2014
Posts: 401
Received 30 Likes on 22 Posts
Default

Originally Posted by juanpablo046
I'm kind of worried now. Last time I checked (3/8) V300 for me was planned for 3/30 (expected 3/23), should I be ok?



When did you check that?
My car two weeks ago was like following, will check tomorrow for possible updates:

V200Delivery date determined ............................................ 11/3/2017
V250Vehicle fixed............................................ 02/23/2018 02/23/2018
V300Vehicle completion (CP 8.0) .................... 03/30/2018 03/23/2018


My car is Euro version

UPDATE
My car seems to have been built yesterday!

V200Delivery date determined ............................................ 11.3.2017 (planned) 03.11.2017 (expected) 15.02.2018 (actual)
V250Vehicle fixed............................................ 23.02.2018 (planned) 02.03.2018 (expected) 19.02.2018 (actual)
V300Vehicle completion (CP 8.0) .................... 30.03.2018 (planned) 30.03.2018 (expected) 20.03.2018 (actual)
V333Entry KornwestheFacility...........................30.03.2018 (planned) 23.03.2018 (expected) 20.03.2018 (actual)
Old 03-21-2018, 11:47 AM
  #165  
Lodi
Burning Brakes
 
Lodi's Avatar
 
Join Date: Jan 2014
Location: Milton, GA
Posts: 752
Received 54 Likes on 10 Posts
Default

My PTS manual car went from May build/June delivery to Aug build/Sept delivery. When I ordered it the assumption was that it would be a Q1 build, so I traded the RS in December - oops! The only good news is that I still have PTS. I keep reminding myself that this is a first world problem!