Notices
992 2019-Present The Forum for the Non-Turbo 911
Sponsored by:
Sponsored by:

Got a 992.2 allocation

Thread Tools
 
Search this Thread
 
Old 06-14-2024, 03:49 PM
  #31  
RatherJaded
Rennlist Member
 
RatherJaded's Avatar
 
Join Date: Jan 2021
Posts: 2,117
Received 1,610 Likes on 917 Posts
Default

Originally Posted by M_B_F
I just got my commission number and V200-Delivery Date Determined today. Lock date is 6/20 and delivery date is estimated to be 8/27.

Congrats. C2 or GTS?
Old 06-14-2024, 03:51 PM
  #32  
M_B_F
Intermediate
 
M_B_F's Avatar
 
Join Date: Jun 2024
Posts: 35
Received 12 Likes on 9 Posts
Default

Its a C2. Debated on waiting to see what might come with the S, but the allocation was there and I could get the car quickly. Always thought I would get an S or GTS but decided to option out the C2. Hope I'm happy with it!
Old 06-15-2024, 02:46 AM
  #33  
dudeoverthere
Burning Brakes
 
dudeoverthere's Avatar
 
Join Date: Sep 2019
Posts: 788
Received 660 Likes on 310 Posts
Default

Originally Posted by M_B_F
I just got my commission number and V200-Delivery Date Determined today. Lock date is 6/20 and delivery date is estimated to be 8/27.
Can you post the order status screenshot from the dealer? They should be able to send it.
Old 06-17-2024, 12:03 PM
  #34  
M_B_F
Intermediate
 
M_B_F's Avatar
 
Join Date: Jun 2024
Posts: 35
Received 12 Likes on 9 Posts
Default

Originally Posted by dudeoverthere
Can you post the order status screenshot from the dealer? They should be able to send it.


The following users liked this post:
Toybox (06-24-2024)
Old 06-17-2024, 01:22 PM
  #35  
bleffler
Intermediate
 
bleffler's Avatar
 
Join Date: Jun 2024
Location: Maryland
Posts: 25
Received 21 Likes on 8 Posts
Default

Originally Posted by M_B_F
I just got my commission number and V200-Delivery Date Determined today. Lock date is 6/20 and delivery date is estimated to be 8/27.
I got my commission number and V200 on a 2025 C2 when I put my deposit down over two weeks ago. At that time, I was told by my dealer my lock date was the first week of June, with August delivery. Subsequently, I was told the lock date had slipped to June 11. That date has now passed but app still doesn't show me in step 2 (You have reached the Change Freeze Point). When I look at my order information tracking in Porsche app, it shows me in step 1 - May 6, 2024 "Your purchase order has been confirmed", and when i drill into discover all steps, it shows not scheduled for all the other steps.

Wondering if anyone with a 2025 allocation has actually had their tracker show them make it past step 1? I'll send update one i start to progress......
Old 06-17-2024, 03:06 PM
  #36  
M_B_F
Intermediate
 
M_B_F's Avatar
 
Join Date: Jun 2024
Posts: 35
Received 12 Likes on 9 Posts
Default

Originally Posted by bleffler
I got my commission number and V200 on a 2025 C2 when I put my deposit down over two weeks ago. At that time, I was told by my dealer my lock date was the first week of June, with August delivery. Subsequently, I was told the lock date had slipped to June 11. That date has now passed but app still doesn't show me in step 2 (You have reached the Change Freeze Point). When I look at my order information tracking in Porsche app, it shows me in step 1 - May 6, 2024 "Your purchase order has been confirmed", and when i drill into discover all steps, it shows not scheduled for all the other steps.

Wondering if anyone with a 2025 allocation has actually had their tracker show them make it past step 1? I'll send update one i start to progress......
My lock date is this Thursday 6/20 so will keep you posted if I get to the second step.
The following users liked this post:
bleffler (06-17-2024)
Old 06-17-2024, 03:13 PM
  #37  
bleffler
Intermediate
 
bleffler's Avatar
 
Join Date: Jun 2024
Location: Maryland
Posts: 25
Received 21 Likes on 8 Posts
Default

Originally Posted by M_B_F
My lock date is this Thursday 6/20 so will keep you posted if I get to the second step.
Great, thanks, and good luck!
Old 06-17-2024, 07:05 PM
  #38  
JoshuaKM1
Rennlist Member
 
JoshuaKM1's Avatar
 
Join Date: Jul 2014
Location: Nashville, TN
Posts: 184
Received 22 Likes on 15 Posts
Default

Do we think the 992.2 base with sport chrono will feel roughly equivalent power wise to the 991.1S? Prices are getting out of control and I'm wondering if a well optioned base at 143k will be "enough" power for daily driving.
The following users liked this post:
rmb1973 (06-18-2024)
Old 06-17-2024, 07:22 PM
  #39  
Fullyield
Drifting
 
Fullyield's Avatar
 
Join Date: Aug 2020
Posts: 2,698
Received 1,491 Likes on 930 Posts
Default

Originally Posted by JoshuaKM1
Do we think the 992.2 base with sport chrono will feel roughly equivalent power wise to the 991.1S? Prices are getting out of control and I'm wondering if a well optioned base at 143k will be "enough" power for daily driving.
If you have concerns, I suggest you schedule a PEC session or the 2 day Porsche Driving Experience and drive the s$#% out of 992 base when available probably in about 60-90 days. Then make a decision. Short trip from Nashville down to Atlanta PEC.
The following 2 users liked this post by Fullyield:
2thHappy (06-18-2024), JoshuaKM1 (06-17-2024)
Old 06-17-2024, 08:09 PM
  #40  
JoshuaKM1
Rennlist Member
 
JoshuaKM1's Avatar
 
Join Date: Jul 2014
Location: Nashville, TN
Posts: 184
Received 22 Likes on 15 Posts
Default

@Fullyield I love that idea but I'm not sure if PEC Atlanta gets base cars. I think they only have the S and beyond but maybe they'll get the new one?
Old 06-18-2024, 03:56 PM
  #41  
tnieh
AutoX
 
tnieh's Avatar
 
Join Date: Jun 2024
Posts: 10
Received 22 Likes on 7 Posts
Default My 992.2 started production estimated delivery 8/5/2024

I got on the waitlist in April 2023 for the 992.2 and the day after announcement my dealer contacted me and I configured that day and it started production yesterday 6/17 from the dealers internal system says 8/5 delivery with range of 7/19 to 8/30. Excited I ordered a base cabriolet in chalk red and black interior new 911 wheels and many many options. I have a 2021 boxster now.

Make sure to ask your dealer to look at their backend it has better info than the myporsche system. They did tell me that usually w new releases they get delayed by 1 to 3 months but this is encouraging that production started already. Good luck to everyone waiting on your new babies!

Note: Added image from dealer system below.



Dealer system with better estimates for delivery and each stage. Make sure to ask dealer for this level of info. Better than the app.

Last edited by tnieh; 06-18-2024 at 04:06 PM.
The following 5 users liked this post by tnieh:
bleffler (06-18-2024), M_B_F (06-18-2024), rmb1973 (06-18-2024), slc4s (06-26-2024), Victory911 (06-18-2024)
Old 06-20-2024, 09:33 AM
  #42  
M_B_F
Intermediate
 
M_B_F's Avatar
 
Join Date: Jun 2024
Posts: 35
Received 12 Likes on 9 Posts
Default

Originally Posted by bleffler
Great, thanks, and good luck!
I just got moved to Step 2 "You have reached the change Freeze Point". Hopefully this means production is moving forward soon. tnieh's post showed his production starting so that is a positive sign. Any movement for you bleffler?
The following users liked this post:
tnieh (06-20-2024)
Old 06-20-2024, 09:43 AM
  #43  
Hunky
Racer
 
Hunky's Avatar
 
Join Date: May 2024
Posts: 336
Received 207 Likes on 129 Posts
Default

Originally Posted by JoshuaKM1
@Fullyield I love that idea but I'm not sure if PEC Atlanta gets base cars. I think they only have the S and beyond but maybe they'll get the new one?
Wow, that should get the attention of anyone on the fence. Why no base models?
Old 06-20-2024, 10:46 AM
  #44  
RatherJaded
Rennlist Member
 
RatherJaded's Avatar
 
Join Date: Jan 2021
Posts: 2,117
Received 1,610 Likes on 917 Posts
Default

Originally Posted by M_B_F
I just got moved to Step 2 "You have reached the change Freeze Point". Hopefully this means production is moving forward soon. tnieh's post showed his production starting so that is a positive sign. Any movement for you bleffler?
FYI, Step 3 equals V250 (Fixed) status which is the “hard freeze.” No changes can be made once a build hits V250. At Step 2 changes can still be made.

Last edited by RatherJaded; 06-20-2024 at 10:48 AM.
Old 06-20-2024, 11:10 AM
  #45  
bleffler
Intermediate
 
bleffler's Avatar
 
Join Date: Jun 2024
Location: Maryland
Posts: 25
Received 21 Likes on 8 Posts
Default

Originally Posted by M_B_F
I just got moved to Step 2 "You have reached the change Freeze Point". Hopefully this means production is moving forward soon. tnieh's post showed his production starting so that is a positive sign. Any movement for you bleffler?
Jealous! Sadly, no movement on my end. I'll probably reach out to my sales rep to see what's going on!


Quick Reply: Got a 992.2 allocation



All times are GMT -3. The time now is 05:17 PM.