Notices
992 2019-Present The Forum for the Non-Turbo 911
Sponsored by:
Sponsored by:

Official waiting room for those with a new 992 on order --- come on in !!

Thread Tools
 
Search this Thread
 
Old 05-11-2023, 08:35 AM
  #13681  
Spiffx
Pro
 
Spiffx's Avatar
 
Join Date: Mar 2022
Location: Greater Houston Area, TX
Posts: 739
Received 691 Likes on 296 Posts
Default

I have a planed phase 4 start on 5/10. But it’s now 5/11 and there’s no update. Still reads 5/10, but also still greyed out and no updates. Is this how it works/normal? Does the status change come after a few days of manufacturing including the pictures? Or does this mean my car is already delayed?


Old 05-11-2023, 08:54 AM
  #13682  
jhenson29
Rennlist Member
 
jhenson29's Avatar
 
Join Date: Jun 2021
Location: St. Louis, MO
Posts: 872
Received 1,168 Likes on 466 Posts
Default

Originally Posted by Spiffx
I have a planed phase 4 start on 5/10. But it’s now 5/11 and there’s no update. Still reads 5/10, but also still greyed out and no updates. Is this how it works/normal?
My original date was 4/25. It stayed 4/25 and greyed out for several days after. I think it was 4/28 when it finally moved on and updated to 4/27 as the actual start date. First pic came 4/29. The other 3 pics came on 5/2. Production complete on 5/5. In Emden waiting on boat on 5/8.
The following users liked this post:
Spiffx (05-11-2023)
Old 05-11-2023, 10:26 AM
  #13683  
Spiffx
Pro
 
Spiffx's Avatar
 
Join Date: Mar 2022
Location: Greater Houston Area, TX
Posts: 739
Received 691 Likes on 296 Posts
Default

Originally Posted by jhenson29
My original date was 4/25. It stayed 4/25 and greyed out for several days after. I think it was 4/28 when it finally moved on and updated to 4/27 as the actual start date. First pic came 4/29. The other 3 pics came on 5/2. Production complete on 5/5. In Emden waiting on boat on 5/8.
Thanks a lot @jhenson29, this is super helpful! (to manage my anxiety level LoL)

🙏

Last edited by Spiffx; 05-11-2023 at 10:30 AM.
The following users liked this post:
jhenson29 (05-11-2023)
Old 05-11-2023, 11:50 AM
  #13684  
SS22
Burning Brakes
 
SS22's Avatar
 
Join Date: Apr 2021
Location: Southern California
Posts: 1,211
Received 484 Likes on 335 Posts
Default

Originally Posted by jhenson29
My original date was 4/25. It stayed 4/25 and greyed out for several days after. I think it was 4/28 when it finally moved on and updated to 4/27 as the actual start date. First pic came 4/29. The other 3 pics came on 5/2. Production complete on 5/5. In Emden waiting on boat on 5/8.
I think yours is the first one I’ve seen on here get completed between late April and early May. Which model?

Seems like GTS models (like mine) that started production in mid-late April are all delayed.
Old 05-11-2023, 12:24 PM
  #13685  
Muhney
Rennlist Member
 
Muhney's Avatar
 
Join Date: Oct 2018
Posts: 517
Received 428 Likes on 187 Posts
Default

I'm happy to be back in the queue for a third trip around the Track your dream. I just traded my 2021 4S Targa for a 2024 Turbo S. Freeze date is June 16th with an estimated delivery of mid August.

Old

New

Last edited by Muhney; 05-11-2023 at 02:36 PM.
The following 2 users liked this post by Muhney:
Cartod (05-11-2023), Spiffx (05-11-2023)
Old 05-11-2023, 01:02 PM
  #13686  
Just J
Rennlist Member
 
Just J's Avatar
 
Join Date: Sep 2013
Location: NW Chicagoland Suburbs
Posts: 795
Received 370 Likes on 171 Posts
Default

Originally Posted by Spiffx
I have a planed phase 4 start on 5/10. But it’s now 5/11 and there’s no update. Still reads 5/10, but also still greyed out and no updates. Is this how it works/normal? Does the status change come after a few days of manufacturing including the pictures? Or does this mean my car is already delayed?

I'm wondering why there's no checkmark next to the phase 3, even though it's bolded. What's the difference between that and the bolded/checked items above? I ask because I have the same status for phase 3 for my order - bolded, but not checked, though I'm not past my phase 4 start date (5/14) yet.
Old 05-11-2023, 01:04 PM
  #13687  
jhenson29
Rennlist Member
 
jhenson29's Avatar
 
Join Date: Jun 2021
Location: St. Louis, MO
Posts: 872
Received 1,168 Likes on 466 Posts
Default

Originally Posted by SS22
I think yours is the first one I’ve seen on here get completed between late April and early May. Which model?

Seems like GTS models (like mine) that started production in mid-late April are all delayed.
GTS Cab




The following users liked this post:
wrksaf912 (05-16-2023)
Old 05-11-2023, 01:14 PM
  #13688  
Apbc2
Rennlist Member
 
Apbc2's Avatar
 
Join Date: Nov 2015
Location: FL
Posts: 47
Received 36 Likes on 15 Posts
Default

I wonder if i will ever receive my elevator picture. I did receive a model of a 911 from Porsche last week, lol
Old 05-11-2023, 01:26 PM
  #13689  
pnw122
Track Day
 
pnw122's Avatar
 
Join Date: Apr 2022
Posts: 17
Received 7 Likes on 4 Posts
Default 992 GTS Finally on the Ship - Ordered March 2023

The following 4 users liked this post by pnw122:
jhenson29 (05-11-2023), johny221 (05-11-2023), Wilder (05-11-2023), wrksaf912 (05-16-2023)
Old 05-11-2023, 01:31 PM
  #13690  
jhenson29
Rennlist Member
 
jhenson29's Avatar
 
Join Date: Jun 2021
Location: St. Louis, MO
Posts: 872
Received 1,168 Likes on 466 Posts
Default

Originally Posted by Just J
I'm wondering why there's no checkmark next to the phase 3, even though it's bolded. What's the difference between that and the bolded/checked items above?
I think the bold, no check is just the current state. Looking at my past screen shots, I don’t see any where the last bold item is also checked.
Old 05-11-2023, 01:32 PM
  #13691  
jhenson29
Rennlist Member
 
jhenson29's Avatar
 
Join Date: Jun 2021
Location: St. Louis, MO
Posts: 872
Received 1,168 Likes on 466 Posts
Default

@pnw122 which ship? Take me with you!
Old 05-11-2023, 01:35 PM
  #13692  
pnw122
Track Day
 
pnw122's Avatar
 
Join Date: Apr 2022
Posts: 17
Received 7 Likes on 4 Posts
Default

Supreme Ace to Halifax....and then Rail to Vancouver
The following users liked this post:
jhenson29 (05-11-2023)
Old 05-11-2023, 02:32 PM
  #13693  
SS22
Burning Brakes
 
SS22's Avatar
 
Join Date: Apr 2021
Location: Southern California
Posts: 1,211
Received 484 Likes on 335 Posts
Default

Originally Posted by jhenson29
GTS Cab

Well I’m glad yours got completed. Maybe it’s the glass roof? So strange.
Originally Posted by Apbc2
I wonder if i will ever receive my elevator picture. I did receive a model of a 911 from Porsche last week, lol
That’s cool. I’ll take a model 911 for my desk at this point. I’m getting more and more sad with every day of delay that passes by…
Old 05-11-2023, 02:39 PM
  #13694  
kvb968
Intermediate
 
kvb968's Avatar
 
Join Date: Jun 2006
Posts: 40
Received 86 Likes on 23 Posts
Default GTS Built in 3 days



White GTS with PDK, rear steering, Burmester, 930 interior, Bordeaux/black with black inserts and white gauges, started on 5/7 completed and ready for transport on 5/11. Very excited!
The following 2 users liked this post by kvb968:
Muhney (05-11-2023), Spiffx (05-11-2023)
Old 05-11-2023, 02:50 PM
  #13695  
kbkevin74
Intermediate
 
kbkevin74's Avatar
 
Join Date: Oct 2022
Location: Kansas City, MO
Posts: 43
Received 28 Likes on 14 Posts
Default Just Got My 992 Turbo S Order Timeline

Just got my order confirmation officially from Porsche yesterday for my Turbo S with a change freeze point of 6/21/23 and currently it says it will arrive at the dealer on 8/26/23. How accurate is that arrival date? I am thinking of changing the color from chalk to shark blue, anyone have any suggestions? Took me almost 3 years to get this allocation but to actually get to monitor the production process now has made the wait worth it.
The following users liked this post:
Cartod (05-11-2023)


Quick Reply: Official waiting room for those with a new 992 on order --- come on in !!



All times are GMT -3. The time now is 11:23 AM.