Official waiting room for those with a new 992 on order --- come on in !!
The following 5 users liked this post by voyagez.fr:
Go Bruins (12-16-2021),
neiltgray (12-16-2021),
pfelsen (12-16-2021),
Steve 96C4S (12-16-2021),
westcoastj (12-17-2021)
#7757
Three Wheelin'
![Default](https://rennlist.com/forums/images/icons/icon1.gif)
My projected dates are: freeze date is 1/12, production date is 2/4 and delivery is 3/25. Of course, I psychotically check the My Porsche App and the TYD. This morning the My Porsche App shows that I have moved to Phase 2 - Scheduled for Production. When I click through "Discover current phase", it shows the same. But when I click through to TYD, it still shows me in phase 01 with all the dates the same as they have always been. Should I assume this is just a glitch with the app and TYD is still correct or is there a chance I got moved up? One added piece of information: I received an email from Porsche yesterday saying "The freeze point of your 911 is approaching". I assumed it was just a system generated notice based on me being within 30 days (although I would have expected it at 30 days and not 27).
I know all of this tracking is notoriously inaccurate and designed by the Marquis de Sade to torture us, but any feel for which is more likely to be accurate?
I know all of this tracking is notoriously inaccurate and designed by the Marquis de Sade to torture us, but any feel for which is more likely to be accurate?
#7758
![Default](https://rennlist.com/forums/images/icons/icon1.gif)
I know all of this tracking is notoriously inaccurate and designed by the Marquis de Sade to torture us, but any feel for which is more likely to be accurate?[/QUOTE]
As soon as the order is V200, the app says the car is scheduled for production. The dates ended up being within a day or two of accurate for mine so far. The milestones will change to a darker color once they have been reached. I’m past lock, and scheduled, and mine goes into production 12/24. “Current Milestone” will appear in the step you are currently at.
As soon as the order is V200, the app says the car is scheduled for production. The dates ended up being within a day or two of accurate for mine so far. The milestones will change to a darker color once they have been reached. I’m past lock, and scheduled, and mine goes into production 12/24. “Current Milestone” will appear in the step you are currently at.
The following users liked this post:
NastyHabits (12-17-2021)
#7759
Rennlist Member
![Default](https://rennlist.com/forums/images/icons/icon1.gif)
Attached is an updated export schedule (received this morning). Does not include any info for west coast sailings.
#7760
![Default](https://rennlist.com/forums/images/icons/icon1.gif)
My projected dates are: freeze date is 1/12, production date is 2/4 and delivery is 3/25. Of course, I psychotically check the My Porsche App and the TYD. This morning the My Porsche App shows that I have moved to Phase 2 - Scheduled for Production. When I click through "Discover current phase", it shows the same. But when I click through to TYD, it still shows me in phase 01 with all the dates the same as they have always been. Should I assume this is just a glitch with the app and TYD is still correct or is there a chance I got moved up? One added piece of information: I received an email from Porsche yesterday saying "The freeze point of your 911 is approaching". I assumed it was just a system generated notice based on me being within 30 days (although I would have expected it at 30 days and not 27).
I know all of this tracking is notoriously inaccurate and designed by the Marquis de Sade to torture us, but any feel for which is more likely to be accurate?
I know all of this tracking is notoriously inaccurate and designed by the Marquis de Sade to torture us, but any feel for which is more likely to be accurate?
![](https://cimg0.ibsrv.net/gimg/rennlist.com-vbulletin/1236x294/screen_shot_2021_12_17_at_8_40_04_am_6b3f588c6e3ed5cea0ea187667e967122fdc70cf.png)
The following 2 users liked this post by Sebas:
German1967 (12-17-2021),
MassMPG (12-21-2021)
#7762
Three Wheelin'
![Default](https://rennlist.com/forums/images/icons/icon1.gif)
Thanks. SA has confirmed that the dates have not changed and the app is giving bad info. Part of me wants to get the car as early as I can. The smarter (and much smaller) part realizes that end of March is actually ideal for the delivery and earlier would not be better.
#7763
Instructor
![Default](https://rennlist.com/forums/images/icons/icon1.gif)
My projected dates are: freeze date is 1/12, production date is 2/4 and delivery is 3/25. Of course, I psychotically check the My Porsche App and the TYD. This morning the My Porsche App shows that I have moved to Phase 2 - Scheduled for Production. When I click through "Discover current phase", it shows the same. But when I click through to TYD, it still shows me in phase 01 with all the dates the same as they have always been. Should I assume this is just a glitch with the app and TYD is still correct or is there a chance I got moved up? One added piece of information: I received an email from Porsche yesterday saying "The freeze point of your 911 is approaching". I assumed it was just a system generated notice based on me being within 30 days (although I would have expected it at 30 days and not 27).
I know all of this tracking is notoriously inaccurate and designed by the Marquis de Sade to torture us, but any feel for which is more likely to be accurate?
I know all of this tracking is notoriously inaccurate and designed by the Marquis de Sade to torture us, but any feel for which is more likely to be accurate?
#7764
Three Wheelin'
![Default](https://rennlist.com/forums/images/icons/icon1.gif)
My understanding is that ‘scheduled for production’ is the stage prior to ‘start production’. My car was scheduled for production on 12/07, and reached the stage ‘start production’ 12/15, two days earlier than forecast. This distinction of the TYD phases may help to rationalize the mismatch of your ‘production’ dates. I received weekly reminders from Porsche about the approaching build freeze date.
#7765
Instructor
#7766
Rennlist Member
![Default](https://rennlist.com/forums/images/icons/icon1.gif)
The scheduled for production under myPorsche is different from the one in TYD. The former happens about 1 month before freeze date, The latter occurs a week or two before actual begin construction,
#7768
Rennlist Member
![Default](https://rennlist.com/forums/images/icons/icon1.gif)
Coincidently, mine is currently scheduled to enter production 12/24 as well.
#7770
![Default](https://rennlist.com/forums/images/icons/icon1.gif)
As soon as the order is V200, the app says the car is scheduled for production. The dates ended up being within a day or two of accurate for mine so far. The milestones will change to a darker color once they have been reached. I’m past lock, and scheduled, and mine goes into production 12/24. “Current Milestone” will appear in the step you are currently at.
I am also scheduled to enter production 12/24!! Hopefully it stays on track! Now that I’m past the freeze point and scheduled for production, I’m becoming more obsessed!