Notices
992 2019-Present The Forum for the Non-Turbo 911
Sponsored by:
Sponsored by:

Official waiting room for those with a new 992 on order --- come on in !!

Thread Tools
 
Search this Thread
 
Old 12-16-2021, 07:59 PM
  #7756  
voyagez.fr
Instructor
 
voyagez.fr's Avatar
 
Join Date: Feb 2021
Posts: 178
Received 98 Likes on 45 Posts
Default

Production photos received recently on my vehicle. Now just the wait until the car gets here.





Last edited by voyagez.fr; 12-16-2021 at 08:02 PM.
The following 5 users liked this post by voyagez.fr:
Go Bruins (12-16-2021), neiltgray (12-16-2021), pfelsen (12-16-2021), Steve 96C4S (12-16-2021), westcoastj (12-17-2021)
Old 12-17-2021, 09:06 AM
  #7757  
Drew46
Three Wheelin'
 
Drew46's Avatar
 
Join Date: Jun 2021
Location: Westchester NY
Posts: 1,985
Received 1,647 Likes on 778 Posts
Default

My projected dates are: freeze date is 1/12, production date is 2/4 and delivery is 3/25. Of course, I psychotically check the My Porsche App and the TYD. This morning the My Porsche App shows that I have moved to Phase 2 - Scheduled for Production. When I click through "Discover current phase", it shows the same. But when I click through to TYD, it still shows me in phase 01 with all the dates the same as they have always been. Should I assume this is just a glitch with the app and TYD is still correct or is there a chance I got moved up? One added piece of information: I received an email from Porsche yesterday saying "The freeze point of your 911 is approaching". I assumed it was just a system generated notice based on me being within 30 days (although I would have expected it at 30 days and not 27).

I know all of this tracking is notoriously inaccurate and designed by the Marquis de Sade to torture us, but any feel for which is more likely to be accurate?
Old 12-17-2021, 09:16 AM
  #7758  
Newport IRL
Instructor
 
Newport IRL's Avatar
 
Join Date: Nov 2021
Posts: 166
Received 77 Likes on 52 Posts
Default

I know all of this tracking is notoriously inaccurate and designed by the Marquis de Sade to torture us, but any feel for which is more likely to be accurate?[/QUOTE]

As soon as the order is V200, the app says the car is scheduled for production. The dates ended up being within a day or two of accurate for mine so far. The milestones will change to a darker color once they have been reached. I’m past lock, and scheduled, and mine goes into production 12/24. “Current Milestone” will appear in the step you are currently at.
The following users liked this post:
NastyHabits (12-17-2021)
Old 12-17-2021, 09:32 AM
  #7759  
dgtarga
Rennlist Member
 
dgtarga's Avatar
 
Join Date: Nov 2020
Location: Spring Lake, MI
Posts: 774
Received 518 Likes on 304 Posts
Default VW Export Schedule - East Coast and Houston

Attached is an updated export schedule (received this morning). Does not include any info for west coast sailings.
Attached Images
File Type: pdf
Volkswagen_Export_Schedule.pdf (44.4 KB, 105 views)
The following 4 users liked this post by dgtarga:
clooloss (12-17-2021), ohniner (12-17-2021), passat774 (12-17-2021), PHX (12-17-2021)
Old 12-17-2021, 09:41 AM
  #7760  
Keadog
Rennlist Member
 
Keadog's Avatar
 
Join Date: Dec 2009
Posts: 6,898
Received 1,094 Likes on 653 Posts
Default

Originally Posted by Drew46
My projected dates are: freeze date is 1/12, production date is 2/4 and delivery is 3/25. Of course, I psychotically check the My Porsche App and the TYD. This morning the My Porsche App shows that I have moved to Phase 2 - Scheduled for Production. When I click through "Discover current phase", it shows the same. But when I click through to TYD, it still shows me in phase 01 with all the dates the same as they have always been. Should I assume this is just a glitch with the app and TYD is still correct or is there a chance I got moved up? One added piece of information: I received an email from Porsche yesterday saying "The freeze point of your 911 is approaching". I assumed it was just a system generated notice based on me being within 30 days (although I would have expected it at 30 days and not 27).

I know all of this tracking is notoriously inaccurate and designed by the Marquis de Sade to torture us, but any feel for which is more likely to be accurate?
This is the next milestone to worry about if you are contemplating any changes to the build:




Old 12-17-2021, 10:08 AM
  #7761  
Sebas
Advanced
 
Sebas's Avatar
 
Join Date: Jun 2021
Posts: 74
Received 48 Likes on 23 Posts
Default Just got pic of build...

Got my pic today... Estimated delivery in Europe on Jan 7...
Attached Images  

Last edited by Sebas; 12-18-2021 at 04:52 AM.
The following 2 users liked this post by Sebas:
German1967 (12-17-2021), MassMPG (12-21-2021)
Old 12-17-2021, 11:31 AM
  #7762  
Drew46
Three Wheelin'
 
Drew46's Avatar
 
Join Date: Jun 2021
Location: Westchester NY
Posts: 1,985
Received 1,647 Likes on 778 Posts
Default

Originally Posted by Keadog
This is the next milestone to worry about if you are contemplating any changes to the build:


Thanks. SA has confirmed that the dates have not changed and the app is giving bad info. Part of me wants to get the car as early as I can. The smarter (and much smaller) part realizes that end of March is actually ideal for the delivery and earlier would not be better.
Old 12-17-2021, 11:55 AM
  #7763  
Flash992
Instructor
 
Flash992's Avatar
 
Join Date: Aug 2021
Location: Austin, TX
Posts: 121
Received 66 Likes on 33 Posts
Default

Originally Posted by Drew46
My projected dates are: freeze date is 1/12, production date is 2/4 and delivery is 3/25. Of course, I psychotically check the My Porsche App and the TYD. This morning the My Porsche App shows that I have moved to Phase 2 - Scheduled for Production. When I click through "Discover current phase", it shows the same. But when I click through to TYD, it still shows me in phase 01 with all the dates the same as they have always been. Should I assume this is just a glitch with the app and TYD is still correct or is there a chance I got moved up? One added piece of information: I received an email from Porsche yesterday saying "The freeze point of your 911 is approaching". I assumed it was just a system generated notice based on me being within 30 days (although I would have expected it at 30 days and not 27).

I know all of this tracking is notoriously inaccurate and designed by the Marquis de Sade to torture us, but any feel for which is more likely to be accurate?
My understanding is that ‘scheduled for production’ is the stage prior to ‘start production’. My car was scheduled for production on 12/07, and reached the stage ‘start production’ 12/15, two days earlier than forecast. This distinction of the TYD phases may help to rationalize the mismatch of your ‘production’ dates. I received weekly reminders from Porsche about the approaching build freeze date.
Old 12-17-2021, 12:21 PM
  #7764  
Drew46
Three Wheelin'
 
Drew46's Avatar
 
Join Date: Jun 2021
Location: Westchester NY
Posts: 1,985
Received 1,647 Likes on 778 Posts
Default

Originally Posted by Flash992
My understanding is that ‘scheduled for production’ is the stage prior to ‘start production’. My car was scheduled for production on 12/07, and reached the stage ‘start production’ 12/15, two days earlier than forecast. This distinction of the TYD phases may help to rationalize the mismatch of your ‘production’ dates. I received weekly reminders from Porsche about the approaching build freeze date.
Thanks! What was your freeze date?
Old 12-17-2021, 12:24 PM
  #7765  
Flash992
Instructor
 
Flash992's Avatar
 
Join Date: Aug 2021
Location: Austin, TX
Posts: 121
Received 66 Likes on 33 Posts
Default

Originally Posted by Drew46
Thanks! What was your freeze date?
My freeze date was 11/17
Old 12-17-2021, 12:24 PM
  #7766  
breny4104
Rennlist Member
 
breny4104's Avatar
 
Join Date: Sep 2021
Location: Austin, TX
Posts: 900
Received 455 Likes on 283 Posts
Default

Originally Posted by Drew46
Thanks. SA has confirmed that the dates have not changed and the app is giving bad info. Part of me wants to get the car as early as I can. The smarter (and much smaller) part realizes that end of March is actually ideal for the delivery and earlier would not be better.
The scheduled for production under myPorsche is different from the one in TYD. The former happens about 1 month before freeze date, The latter occurs a week or two before actual begin construction,
Old 12-17-2021, 12:26 PM
  #7767  
Drew46
Three Wheelin'
 
Drew46's Avatar
 
Join Date: Jun 2021
Location: Westchester NY
Posts: 1,985
Received 1,647 Likes on 778 Posts
Default

Originally Posted by breny4104
The scheduled for production under myPorsche is different from the one in TYD. The former happens about 1 month before freeze date, The latter occurs a week or two before actual begin construction,

Ok. Based on that, my dates make sense.
Old 12-17-2021, 04:46 PM
  #7768  
NastyHabits
Rennlist Member
 
NastyHabits's Avatar
 
Join Date: Sep 2021
Location: USA
Posts: 406
Received 368 Likes on 157 Posts
Default

Originally Posted by Newport IRL
I know all of this tracking is notoriously inaccurate and designed by the Marquis de Sade to torture us, but any feel for which is more likely to be accurate?
As soon as the order is V200, the app says the car is scheduled for production. The dates ended up being within a day or two of accurate for mine so far. The milestones will change to a darker color once they have been reached. I’m past lock, and scheduled, and mine goes into production 12/24. “Current Milestone” will appear in the step you are currently at.[/QUOTE]

Coincidently, mine is currently scheduled to enter production 12/24 as well.
Old 12-17-2021, 07:31 PM
  #7769  
JKMD
Intermediate
 
JKMD's Avatar
 
Join Date: Aug 2021
Location: L.A.
Posts: 39
Received 26 Likes on 8 Posts
Default

Anybody on Asteria Leader? It just went thru Panama Canal. ETA to San Diego is unknown at this time.

Old 12-17-2021, 07:53 PM
  #7770  
M2to992C2S
Advanced
 
M2to992C2S's Avatar
 
Join Date: Oct 2021
Posts: 73
Received 58 Likes on 27 Posts
Default

Originally Posted by NastyHabits
As soon as the order is V200, the app says the car is scheduled for production. The dates ended up being within a day or two of accurate for mine so far. The milestones will change to a darker color once they have been reached. I’m past lock, and scheduled, and mine goes into production 12/24. “Current Milestone” will appear in the step you are currently at.
Coincidently, mine is currently scheduled to enter production 12/24 as well.[/QUOTE]

I am also scheduled to enter production 12/24!! Hopefully it stays on track! Now that I’m past the freeze point and scheduled for production, I’m becoming more obsessed!


Quick Reply: Official waiting room for those with a new 992 on order --- come on in !!



All times are GMT -3. The time now is 05:03 PM.