2022 Allocation Dates
#271
![Default](https://rennlist.com/forums/images/icons/icon1.gif)
The ships go to San Diego and Benicia (NorCal). The severely impacted port is Long Beach/Los Angeles. But that's mainly container ships. There are some vehicle transports that unload there, but it's in a different location. So, from the shipping end of things, it's clear sailing. Now, getting the car built and shipped is another story. Also, whether there are less frequent ships leaving Emden, I have no idea.
Thx. Appreciate the Intel.
The following users liked this post:
Go Bruins (11-09-2021)
#273
Rennlist Member
![Default](https://rennlist.com/forums/images/icons/icon1.gif)
My SA followed up with me several days ago regarding their allocations for the fourth quarter. My local dealer received no C2 or C2S variants of any kind during the allocation drop first week of November. They received one GTS, a GTS cab and a Turbo S, and that is it for the entire fourth quarter. Demand is definitely high as they have a waiting list of over 20 customers for a C2S, but allocations from PAG are also way down. PCNA rep told our GM that no dealers in his region received any 992 base or S variants of any kind for the fourth quarter. It sounds like there will not be anything further until February.
#274
Rennlist Member
#275
Drifting
![Default](https://rennlist.com/forums/images/icons/icon1.gif)
No PTS, and the only CXX parts that caused a recent 20 day delay were the leather door sills with deviated stitching. Maybe it’s a west coast thing. I have many friends that had a fairly significant wait time from allocation to lock.