Still waiting for my silver to be delivered. 3 weeks in the port in San Diego. The SA is calling the port everyday to bug them but transport is waaaay behind. GTSdds, you got really lucky. Your car must have in the front of the ship!
Still waiting for my silver to be delivered. 3 weeks in the port in San Diego. The SA is calling the port everyday to bug them but transport is waaaay behind. GTSdds, you got really lucky. Your car must have in the front of the ship!
Wow! Is that normal to take that long at the port?
Does that screw up the PEC timing if you are doing that?
Wow! Is that normal to take that long at the port?
Does that screw up the PEC timing if you are doing that?
Normal transit time on the truck is 7-10 days! Definitely not normal! Nothing I can do though. The SA is on top of it. I wish we can just go get it but we can't.
Normal transit time on the truck is 7-10 days! Definitely not normal! Nothing I can do though. The SA is on top of it. I wish we can just go get it but we can't.
Yikes, sorry to hear that. I can image how frustrating that must be. I hope you get good news soon!
Still waiting for my silver to be delivered. 3 weeks in the port in San Diego. The SA is calling the port everyday to bug them but transport is waaaay behind. GTSdds, you got really lucky. Your car must have in the front of the ship!
dood,
your wait is even killing me!!
since you’re GT silver too, here’s a shot to help you keep the faith
Normal transit time on the truck is 7-10 days! Definitely not normal! Nothing I can do though. The SA is on top of it. I wish we can just go get it but we can't.
My order just moved 1 week closer to it being built, which I heard a few others have as well...maybe they are trying to get the 991s wrapped up as soon as possible.
My order just moved 1 week closer to it being built, which I heard a few others have as well...maybe they are trying to get the 991s wrapped up as soon as possible.
When is the build date for yours? My SA called last week and told me the vehicle is fixed on 9/21 and will go into production on 9/28
SA says the port told him about 7 days (that was last Wed or Thursday, I lose track of time because I try to not think about it). I'm hoping I will finally get it this week sometime. It's been over 3 weeks since the dock.
The more I think about it, the more annoyed I get so I try to go about my day as normal as possible. However, every text I get, I look to see if it's the SA or not!