Stop Sale?
#4835
#4836
Basic Sponsor
Rennlist
Site Sponsor
Rennlist
Site Sponsor
![Default](https://rennlist.com/forums/images/icons/icon1.gif)
Wow...I soooo wish it came as a manual....
![Frown](https://rennlist.com/forums/images/smilies/frown.gif)
__________________
Bob Saville
![](https://naroescapemotorsports.com/wp-content/uploads/2018/01/naroescape-logo-small.gif)
Getting You On Track!
www.naroescapemotorsports.com
704-395-2975
'07 SPC
'71 914/6 Huey
'04 GT3
Bob Saville
![](https://naroescapemotorsports.com/wp-content/uploads/2018/01/naroescape-logo-small.gif)
Getting You On Track!
www.naroescapemotorsports.com
704-395-2975
- Data Analysis & Coaching
- Drivers Gear
- Crew Gear
- Car Gear
'07 SPC
'71 914/6 Huey
'04 GT3
#4838
Drifting
#4839
Race Director
![Default](https://rennlist.com/forums/images/icons/icon1.gif)
I am jealous - tell me a color that this car does not look good in. I have said it from the beginning that this is one of those rare cars that is not partial to its color.
#4840
Rennlist Member
#4841
![Default](https://rennlist.com/forums/images/icons/icon1.gif)
My guess (based on a personal feeling that they'll build all the US motors at once and put them on the same boat):
Time to build the 400 US motors.
+
Time to load them all onto the container ship.
+
Time at sea, about 10 days from Germany to the East Coast.
+
Time needed to ship motors from East Coast port of entry to the three swap locations.
+
Timing of getting the techs from Germany to those locations.
+
Time needed to recall all GT3's to Rhode Island, Atlanta, and San Diego.
+
Time for actual swap.
+
Time to return all vehicles to dealers.
=
July/August
They should've started on us sooner, but logistically, it was quicker and easier to do the European cars first seeing as they can only build so many new motors in a day. Doesn't feel good, but I think that's the reality of our situation.
Time to build the 400 US motors.
+
Time to load them all onto the container ship.
+
Time at sea, about 10 days from Germany to the East Coast.
+
Time needed to ship motors from East Coast port of entry to the three swap locations.
+
Timing of getting the techs from Germany to those locations.
+
Time needed to recall all GT3's to Rhode Island, Atlanta, and San Diego.
+
Time for actual swap.
+
Time to return all vehicles to dealers.
=
July/August
They should've started on us sooner, but logistically, it was quicker and easier to do the European cars first seeing as they can only build so many new motors in a day. Doesn't feel good, but I think that's the reality of our situation.
#4842
Race Director
#4843
Rennlist Member
![Default](https://rennlist.com/forums/images/icons/icon1.gif)
The big question mark is when do they start the installs in the US. Based on my discussion with Jason they will begin to stockpile the engines here shortly. All they need are the technicians to arrive to do the work.
#4844
Rennlist Member