Notices
991 GT3, GT3RS, GT2RS and 911R 2012-2019
Sponsored by:
Sponsored by:

Stop Sale?

Thread Tools
 
Search this Thread
 
Old 05-17-2014, 11:54 PM
  #4846  
Cyrek
Pro
 
Cyrek's Avatar
 
Join Date: Nov 2012
Location: Midwest
Posts: 568
Received 24 Likes on 9 Posts
Default

Tie Fighter
Old 05-18-2014, 04:12 PM
  #4847  
YOCOHO
Racer
 
YOCOHO's Avatar
 
Join Date: Jan 2012
Location: Dartmouth, MA
Posts: 326
Likes: 0
Received 0 Likes on 0 Posts
Default

Originally Posted by GT3ZZZ
Black is black, I've got my baby back! Its epic, keep the faith.



Very nice mine will be delivering Nov 14th got the word last week. Enjoy!
Old 05-18-2014, 06:10 PM
  #4848  
MayorAdamWest
Three Wheelin'
 
MayorAdamWest's Avatar
 
Join Date: Dec 2012
Location: SF Bay Area
Posts: 1,299
Received 19 Likes on 11 Posts
Default

Originally Posted by MyenShi
Time to build the 400 US motors.
25 Engines per day means just 16 days to build all 400. Even if they shut the factory down on weekends (do they?), that's just 3 weeks. 6 weeks if you count weekends off and equal distributing around the world. It seems there is a lot more than 6 weeks between the first shipments to Europe and many of the people here in the US.
Old 05-18-2014, 06:21 PM
  #4849  
0Q991
Drifting
 
0Q991's Avatar
 
Join Date: Jul 2013
Location: SoCal
Posts: 2,743
Received 8 Likes on 5 Posts
Default

Originally Posted by MayorAdamWest
25 Engines per day means just 16 days to build all 400. Even if they shut the factory down on weekends (do they?), that's just 3 weeks. 6 weeks if you count weekends off and equal distributing around the world. It seems there is a lot more than 6 weeks between the first shipments to Europe and many of the people here in the US.
Also, don't forget all the ancillary parts, outfitting ports for the work, mobilizing the various teams.
Old 05-19-2014, 03:51 PM
  #4850  
hemeoncdoc
AutoX
 
hemeoncdoc's Avatar
 
Join Date: Nov 2009
Posts: 14
Likes: 0
Received 0 Likes on 0 Posts
Default

I just got the call from PCNA re my engine swap. I suspect that they have a bunch of lower eschelon people making the calls. He didn't know what Brumos was, asked if I meant "Brunos." Anyway, I am assigned week 28, July 7-13 for engine arrival. "Conservatively" it should be back in my hands 3 to 4 weeks later. So... still 2.5 months before it is back in action. Next call will be 2 weeks prior to pickup to finalize pickup arrangements to go to Atlanta. Interesting that they are requesting both keys - related to software reprogramming I assume?
Old 05-19-2014, 04:50 PM
  #4851  
Jimmy-D
Race Director
 
Jimmy-D's Avatar
 
Join Date: Mar 2014
Location: Midwest
Posts: 11,290
Received 1,466 Likes on 765 Posts
Default

Probably precautionary to make sure every thing is accounted for. So if the car disappears from Port they can rule that out.
Old 05-19-2014, 06:12 PM
  #4852  
LateBrake911
Rennlist Member
 
LateBrake911's Avatar
 
Join Date: Oct 2012
Location: las vegas nv
Posts: 640
Likes: 0
Received 0 Likes on 0 Posts
Default

So far it looks like the earliest expected car return dates for the US is the week of 7/7 thru 7/13. Anyone heard earlier? thx
Old 05-19-2014, 08:23 PM
  #4853  
myphillylawyer
Track Day
 
myphillylawyer's Avatar
 
Join Date: Mar 2014
Location: Philadelphia
Posts: 22
Likes: 0
Received 0 Likes on 0 Posts
Default

has anyone received a call that had their car's production ceased on the assembly line? Will our cars sit in Germany until every engine is swapped on the state-side cars?
Old 05-19-2014, 09:30 PM
  #4854  
Jimmy-D
Race Director
 
Jimmy-D's Avatar
 
Join Date: Mar 2014
Location: Midwest
Posts: 11,290
Received 1,466 Likes on 765 Posts
Default

I think "Clocked" is in that situation. He often posts.
Old 05-19-2014, 10:24 PM
  #4855  
Clocked
Racer
 
Clocked's Avatar
 
Join Date: Feb 2014
Location: Midwest
Posts: 494
Likes: 0
Received 1 Like on 1 Post
Default

Jimmy D. Just had a call today with two high senior executives at PNA on the exact topic. Cars that were on the assembly line at the stop sale all have defective engines. All will be the very last to get the new engines. The plan is for those cars the engine swap will occur at the factory. The expected delivery of those cars for the US is October or November. All they could say was they were the last produced and last to get engines. I asked will mine come with snow tires? They laughed.
Old 05-20-2014, 12:47 AM
  #4856  
myphillylawyer
Track Day
 
myphillylawyer's Avatar
 
Join Date: Mar 2014
Location: Philadelphia
Posts: 22
Likes: 0
Received 0 Likes on 0 Posts
Default

Originally Posted by Clocked
Jimmy D. Just had a call today with two high senior executives at PNA on the exact topic. Cars that were on the assembly line at the stop sale all have defective engines. All will be the very last to get the new engines. The plan is for those cars the engine swap will occur at the factory. The expected delivery of those cars for the US is October or November. All they could say was they were the last produced and last to get engines. I asked will mine come with snow tires? They laughed.
Well if that's the case, and I received a call from PCNA that informed me beginning May 2nd (my original DD), I'd be getting $2,000/ month until delivered, then that computes to roughly $12,000.00. That's nearly a 10% reduction on the cost of the car. That sounds good but now I'm wondering if that will fairly compensate me for the depreciated loss in value.
Old 05-20-2014, 01:03 AM
  #4857  
az audi
Racer
 
az audi's Avatar
 
Join Date: Jun 2013
Location: Scottsdale, AZ
Posts: 281
Received 2 Likes on 2 Posts
Default

Originally Posted by myphillylawyer
has anyone received a call that had their car's production ceased on the assembly line? Will our cars sit in Germany until every engine is swapped on the state-side cars?
I did not get a call from PNC, but my sales rep did call and send an email on my production dates. My car originally scheduled to be completed 2/28/14 and delivered 5/2/14. My new dates are 7/25 and 10/3/14. Almost exactly 5 month delay according to their computer system.

And I'll be able to do a side by aside comparison to a MY15 at time of delivery. How disappointing.
Old 05-20-2014, 01:34 AM
  #4858  
Clocked
Racer
 
Clocked's Avatar
 
Join Date: Feb 2014
Location: Midwest
Posts: 494
Likes: 0
Received 1 Like on 1 Post
Default

az audi. Let me add some clarification. As I was told by these two individuals (COO and head of customer service for PNA) the people that are being called now are those that the car was at stage 8 or V300 or later i.e. completed, at ports or delivered. All cars in production at the time of stop sale which would have been before stage 8 will get calls starting at the end of May if PAG has completed its timeline for the Pre stage 8 group. I was at V270 at the time of the stop sale. What these people told me is that for the Stage 8 group the last engine and delivery of the car should be the end of September. They then told me (and said not an exact date) to expect my car to arrive in October or November as a 2014. I did say if it does not come with snow tires you can deliver it to where I store my other sports cars for the winter and will not start or drive the car until May of 2015. I asked them to consider giving me 12 months of compensation from the original date of delivery which was May 2nd to when I can actually drive the car. That response was silent which i expected.

I will likely by the car and then within minutes sell it back to my dealer to get the compensation. I don't want a year old car that will then sit in storage for 6 months until I can use it.
Old 05-20-2014, 02:00 AM
  #4859  
az audi
Racer
 
az audi's Avatar
 
Join Date: Jun 2013
Location: Scottsdale, AZ
Posts: 281
Received 2 Likes on 2 Posts
Default

Originally Posted by Clocked
az audi. Let me add some clarification. As I was told by these two individuals (COO and head of customer service for PNA) the people that are being called now are those that the car was at stage 8 or V300 or later i.e. completed, at ports or delivered. All cars in production at the time of stop sale which would have been before stage 8 will get calls starting at the end of May if PAG has completed its timeline for the Pre stage 8 group. I was at V270 at the time of the stop sale. What these people told me is that for the Stage 8 group the last engine and delivery of the car should be the end of September. They then told me (and said not an exact date) to expect my car to arrive in October or November as a 2014. I did say if it does not come with snow tires you can deliver it to where I store my other sports cars for the winter and will not start or drive the car until May of 2015. I asked them to consider giving me 12 months of compensation from the original date of delivery which was May 2nd to when I can actually drive the car. That response was silent which i expected.

I will likely by the car and then within minutes sell it back to my dealer to get the compensation. I don't want a year old car that will then sit in storage for 6 months until I can use it.
Unfortunately, I think you are probably right, I am just sharing what I was told today. My expectations are low at this point.
Old 05-20-2014, 02:33 AM
  #4860  
TRAKCAR
Rennlist Member
 
TRAKCAR's Avatar
 
Join Date: Jan 2008
Location: S. Florida
Posts: 29,443
Received 1,688 Likes on 785 Posts
Default

Originally Posted by az audi
Unfortunately, I My expectations are low at this point.
No kidding....


Quick Reply: Stop Sale?



All times are GMT -3. The time now is 05:40 AM.