Official waiting room for those with a new 992 on order --- come on in !!

Thread Tools
 
Search this Thread
 
Old 05-26-2023 | 08:10 AM
  #14221  
Alex.In.M0tion's Avatar
Alex.In.M0tion
Racer
 
Joined: Mar 2022
Posts: 358
Likes: 505
From: Northeast, US
Default

Originally Posted by Roadworrier
The tentative production date is right now shown as June 20 though it sounds like there might be delays with the manual builds?
My manual T just finished production last week. No delays, production started within 2 days of the the original schedule.
Old 05-26-2023 | 08:14 AM
  #14222  
Alex.In.M0tion's Avatar
Alex.In.M0tion
Racer
 
Joined: Mar 2022
Posts: 358
Likes: 505
From: Northeast, US
Default

Originally Posted by patel1283
I have a 992T on order and woke up this morning with a pleasant TYD update. My car arrived to Emdem 5/25 and supposed to leave 5/26. I was clicking around the maritime website but couldn’t figure out which ship. Anyone have an idea which vessel goes to Jacksonville?
Next Jacksonville boat is SFL CONDUCTOR on 6/15.



The following 2 users liked this post by Alex.In.M0tion:
arrivederci (05-26-2023), patel1283 (05-26-2023)
Old 05-26-2023 | 11:17 AM
  #14223  
Shayan30's Avatar
Shayan30
Rennlist Member
 
Joined: Mar 2023
Posts: 60
Likes: 49
Default

Below is my timeline for my order so far.
1 day delay on the prod starting (step 3 TYD) and now 2 day delay on production start.

How does one find the shipping schedules like the pics above? Any schedule on ships coming to Davisville RI after 6/12?

Order Freeze - 4/27
Prod Starting - 5/15 (pushed 1 day, originally 5/14)
Prod Start - 5/24 (no update stuck on step 3)
Prod Complete - 6/2
To Emden Port - 6/3
At Emden Port - 6/10
Left Port - 6/10 (probably unrealistic)
At Local Port - 6/24
To Local Dealer - 7/1
At Local Dealer - 7/1 (originally 6/30)
Old 05-26-2023 | 11:34 AM
  #14224  
KM20Turbo's Avatar
KM20Turbo
Instructor
 
Joined: Nov 2021
Posts: 141
Likes: 110
From: Alberta
Default

Just got notified that I’m on the sunshine ace and headed for Halifax. The shipped is still moored and I wasn’t expecting an update until it sailed so it was a pleasant surprise. Go hit refresh on your TYD and hope for an update!


The following 3 users liked this post by KM20Turbo:
Dr. Z (05-26-2023), kvb968 (05-26-2023), Shooter992C2S (05-26-2023)
Old 05-26-2023 | 11:36 AM
  #14225  
Radiationman's Avatar
Radiationman
Racer
 
Joined: Jan 2023
Posts: 315
Likes: 359
Default

Originally Posted by Roadworrier
Stage 2 today. Original build submitted and put on list, February 16; allocation received March 8; deposit on March 24. Must be record time.
Sorry, but I have you beat....

Took an open allocation for a T -
Allocation received on 2-10,
Change Freeze on 2-17
Build Started 3-13
Build Complete 3-26
Arrived at port 3-29
On ship: 4-5
Arrived Jacksonville: 4-24
Delivery Scheduled at PECATL: 6-21
Old 05-26-2023 | 11:40 AM
  #14226  
SS22's Avatar
SS22
Burning Brakes
 
Joined: Apr 2021
Posts: 1,211
Likes: 485
From: Southern California
Default

Originally Posted by Apbc2
There are the options we have in common:

Adaptive Sport Seats Plus (18-way) with Memory Package

Premium Package

Preparation for Porsche Dashcam (Front)
I have the top options in common on my GTS with PDK. I also have RAS and the assistance package but not sure if those are the issue.

My production completion date moved from 4/24 to 5/3, and then from 5/3 to 6/1. It’s stayed on the 6/1 date for 2-3 weeks now.
Old 05-26-2023 | 11:43 AM
  #14227  
Cartod's Avatar
Cartod
Burning Brakes
 
Joined: Nov 2016
Posts: 1,162
Likes: 2,244
Default

Originally Posted by Alex.In.M0tion
My manual T just finished production last week. No delays, production started within 2 days of the the original schedule.
production is not where the delays are occurring. It’s in shipping.
Old 05-26-2023 | 11:56 AM
  #14228  
SS22's Avatar
SS22
Burning Brakes
 
Joined: Apr 2021
Posts: 1,211
Likes: 485
From: Southern California
Default

Originally Posted by Cartod
production is not where the delays are occurring. It’s in shipping.
That is definitely not true for many of us. My GTS started production on April 18. Within 2 days, I had 3 photos. I’ve since been stuck in production. Completion date moved to May 3 and then June 1. Still in production 5 weeks later…
The following users liked this post:
electricborn (05-26-2023)
Old 05-26-2023 | 12:02 PM
  #14229  
neurodoc123's Avatar
neurodoc123
Instructor
 
Joined: Jan 2023
Posts: 155
Likes: 156
From: everywhere
Default

Some grace for houston bound folks, just got a TYD update from porsche via email - car left emden 5/25. now just curious what ship it is as vessel finder shows sunshine ace still moored, while TYD shows the car out of the port on an unknown vessel?
Who can provide the info about the vessel name? SA?
The following users liked this post:
Spiffx (05-26-2023)
Old 05-26-2023 | 12:04 PM
  #14230  
SS22's Avatar
SS22
Burning Brakes
 
Joined: Apr 2021
Posts: 1,211
Likes: 485
From: Southern California
Default

You know you’re spending too much time refreshing TYD every day when the website prompts you (and you oblige) to do a survey in German. No, I do not know German. But yes, I still completed the survey to tell them TYD is horrible and needs to provide more and better information.



Old 05-26-2023 | 12:05 PM
  #14231  
neurodoc123's Avatar
neurodoc123
Instructor
 
Joined: Jan 2023
Posts: 155
Likes: 156
From: everywhere
Default

SA confirmed, its on sunshine ace, going to porsche north !! 6/17 arrival at houston port and 6/20 at dealership, post ppf give it take a week, i might get to be on it 6/27 probably..
The following 4 users liked this post by neurodoc123:
arrivederci (05-26-2023), lone992 (05-26-2023), Shooter992C2S (05-26-2023), Spiffx (05-26-2023)
Old 05-26-2023 | 12:07 PM
  #14232  
Wilder's Avatar
Wilder
Rennlist Member
 
Joined: Jun 2006
Posts: 6,721
Likes: 5,304
From: Somewhere in Mexico
Default

Freeze date: March 6
Destination port: May 11
ETA at dealer: May 26

Deposit to delivery: 6.5 months
Old 05-26-2023 | 12:27 PM
  #14233  
johny221's Avatar
johny221
Instructor
 
Joined: Jul 2022
Posts: 147
Likes: 87
From: Omaha
Default

Originally Posted by Cartod
production is not where the delays are occurring. It’s in shipping.
definitely not correct. 6 months in production for me and it’s easy to tell if it’s production vs shipping. If you’re delayed for shipping you would have still hit v300 status. If it’s delayed due to production your status would be showing up still as v260, which mine and others were still staying at.
The following users liked this post:
electricborn (05-26-2023)
Old 05-26-2023 | 01:13 PM
  #14234  
jhenson29's Avatar
jhenson29
Rennlist Member
 
Joined: Jun 2021
Posts: 987
Likes: 1,264
From: St. Louis, MO
Default

I updated to Step 8, 5/25 also.

Woo hoo!

The following 4 users liked this post by jhenson29:
alin2 (05-26-2023), lone992 (05-26-2023), rennfish (05-26-2023), Spiffx (05-26-2023)
Old 05-26-2023 | 02:14 PM
  #14235  
Spiffx's Avatar
Spiffx
Burning Brakes
 
Joined: Mar 2022
Posts: 768
Likes: 732
From: Greater Houston Area, TX
Default

Originally Posted by neurodoc123
SA confirmed, its on sunshine ace, going to porsche north !! 6/17 arrival at houston port and 6/20 at dealership, post ppf give it take a week, i might get to be on it 6/27 probably..
Originally Posted by jhenson29
I updated to Step 8, 5/25 also.

Woo hoo!
How long were your cars at the port in Emden?