Official waiting room for those with a new 992 on order --- come on in !!
my C4S has same pushed back dates from March 30 to August just as yours and @myidsucks
here's my build FYI
http://www.porsche-code.com/PP4L52D6
here's my build FYI
http://www.porsche-code.com/PP4L52D6
Rennlist Member
@Harry Wenhr @meyecul @myidsucks I just heard back from my SA. Apparently 121 vehicles were sent from the factory to France due to 'lack of space and delayed loading onto vessels'. He said the August timeline should be extremely conservative but no other update on timing before that for now. Maybe at delivery I ask them for a bumper sticker that shows my car is well traveled before I even put a mile on it...
@Harry Wenhr @meyecul @myidsucks I just heard back from my SA. Apparently 121 vehicles were sent from the factory to France due to 'lack of space and delayed loading onto vessels'. He said the August timeline should be extremely conservative but no other update on timing before that for now. Maybe at delivery I ask them for a bumper sticker that shows my car is well traveled before I even put a mile on it...
@Harry Wenhr @meyecul @myidsucks I just heard back from my SA. Apparently 121 vehicles were sent from the factory to France due to 'lack of space and delayed loading onto vessels'. He said the August timeline should be extremely conservative but no other update on timing before that for now. Maybe at delivery I ask them for a bumper sticker that shows my car is well traveled before I even put a mile on it...
Pro
@Harry Wenhr @meyecul @myidsucks I just heard back from my SA. Apparently 121 vehicles were sent from the factory to France due to 'lack of space and delayed loading onto vessels'. He said the August timeline should be extremely conservative but no other update on timing before that for now. Maybe at delivery I ask them for a bumper sticker that shows my car is well traveled before I even put a mile on it...
This does not make any sense for anyone showing step 7 (arriving at the german port) as complete. I can see this for mine as my TYD is still stuck on step 6 even though the shown step 7 date has long passed but its my understanding that the step 7 requires the car being scanned at the port. And then why on earth would those stored cars be forced to sit for months after already being well late? Could be wrong and who knows how deep this all goes, but something seems off with that explanation.
Last edited by meyecul; 03-22-2023 at 06:27 PM.
Pro
In case you are interested. Here is the storage lot where your car is sitting. I found a french article online about this place. Apparently this storage is supposed to be for cars distributed throughout France, not for US bound cars going to the port. So if now Porsche is dumping cars here for lack of space, this does not seem like a good situation at all. If the report is correct and 121 cars bound for the US are sitting here it could be equivalent of a car graveyard. Lets see...6 to 9 cars get loaded onto a transport every so often when Porsche decides to do some yard clean up. Yeah, then Aug then would seem on par. What a mess. I hope this is all bad intel and not the case for any of us.
Rennlist Member
Right- me too- completion due yesterday-now delayed 30 days.....jt
The following users liked this post:
BOS911T (03-24-2023)
The following users liked this post:
BOS911T (03-24-2023)
This does not make any sense for anyone showing step 7 (arriving at the german port) as complete. I can see this for mine as my TYD is still stuck on step 6 even though the shown step 7 date has long passed but its my understanding that the step 7 requires the car being scanned at the port. And then why on earth would those stored cars be forced to sit for months after already being well late? Could be wrong and who knows how deep this all goes, but something seems off with that explanation.
My hope is that the prioritize these cars at Emden since they all were likely built early February (mine was February 2nd), well ahead of cars arriving at Emden now, directly from the factory without the detour to France. However, the ridiculously delayed shipping dates we're all seeing in TYD now, tell me that won't be the case.
In case you are interested. Here is the storage lot where your car is sitting. I found a french article online about this place. Apparently this storage is supposed to be for cars distributed throughout France, not for US bound cars going to the port. So if now Porsche is dumping cars here for lack of space, this does not seem like a good situation at all. If the report is correct and 121 cars bound for the US are sitting here it could be equivalent of a car graveyard. Lets see...6 to 9 cars get loaded onto a transport every so often when Porsche decides to do some yard clean up. Yeah, then Aug then would seem on par. What a mess. I hope this is all bad intel and not the case for any of us.
Depends on the dealer but "same day" is a stretch. They have to prepare the car for delivery, etc. I would bet most cars are at the dealer for at least a couple of days before the owner is able to pick it up and take it home.
Drifting
Are they short on ships to transport them? And why a shortage for just 121 cars?
Pro
One thing that still differs between mine, yours and the others that have chimed into this is that my further dates have held still. So I guess all I can hope for is that my car leaves that lot (if that is where it is) and get to Emden to stay on schedule.
With this in mind, I cannot see how your car could sit at Emden from now until July. That would be major major extremely long port time for a finished car. Perhaps those long far out dates that ended up in your TYD are just generic placeholders and will all revert back if you get loaded on one of these two ships in the coming week. Thats my hope for you (and also hope my dates in TYD stay put at least).
Last edited by meyecul; 03-22-2023 at 09:45 PM.