The "Unofficial" 991.2 GT3 Production Number Stats
#46
![Default](https://rennlist.com/forums/images/icons/icon1.gif)
Great thread and thanks for putting this together. At what stage of production / allocation are VINs "created"?
From what time period do they represent? At 560 cars for NA, I wonder what % this represents of total VINs "created". Trying to extrapolate total cars expected to be produced.
From what time period do they represent? At 560 cars for NA, I wonder what % this represents of total VINs "created". Trying to extrapolate total cars expected to be produced.
#48
![Default](https://rennlist.com/forums/images/icons/icon1.gif)
Great thread and thanks for putting this together. At what stage of production / allocation are VINs "created"?
From what time period do they represent? At 560 cars for NA, I wonder what % this represents of total VINs "created". Trying to extrapolate total cars expected to be produced.
From what time period do they represent? At 560 cars for NA, I wonder what % this represents of total VINs "created". Trying to extrapolate total cars expected to be produced.
As far as I can tell the cars in the database show up after the car exists production. They are not built in strict vin order. Some lower vin cars were built in October after higher vin cars. Likely product/supply batch scheduling and where there are PTS or CXX options delaying production start.
These cars are a handful of August but mostly September and October to date.
#51
![Default](https://rennlist.com/forums/images/icons/icon1.gif)
I'm not sure exactly when the vin is created. I imagine it would correspond to some point along the production schedule around V250?
As far as I can tell the cars in the database show up after the car exists production. They are not built in strict vin order. Some lower vin cars were built in October after higher vin cars. Likely product/supply batch scheduling and where there are PTS or CXX options delaying production start.
These cars are a handful of August but mostly September and October to date.
As far as I can tell the cars in the database show up after the car exists production. They are not built in strict vin order. Some lower vin cars were built in October after higher vin cars. Likely product/supply batch scheduling and where there are PTS or CXX options delaying production start.
These cars are a handful of August but mostly September and October to date.
#54
![Default](https://rennlist.com/forums/images/icons/icon1.gif)
j/k...guess my no-bose no-led manual gt3 will never sell.
#56
Rennlist Member
Thread Starter
![Default](https://rennlist.com/forums/images/icons/icon1.gif)
It's basically August to October production...we can't really tell by weeks as that information is not given. Loess may have it broken down by week...he can chime in.
#57
#58
Burning Brakes
![Default](https://rennlist.com/forums/images/icons/icon1.gif)
Thanks for this great thread! I have a GT3 Touring going V260 (vehicle entry to body shop) on 10/27, so I assume is an early one. It will be interesting to see what percentage are Touring.
Chris
Chris
#59
Burning Brakes
#60
![Default](https://rennlist.com/forums/images/icons/icon1.gif)
560 GT3 are in V250 (educated guess per above), and that is just for NA for roughly 7 weeks production. As stated below, production must be dedicated to NA currently.
The below spreadsheet was posted in another thread.
https://rennlist.com/forums/991-gt3-...l#post14345601
The below spreadsheet was posted in another thread.
https://rennlist.com/forums/991-gt3-...l#post14345601
Last edited by mass27; 10-19-2017 at 07:47 PM.