Share your MY24 build progress

Thread Tools
 
Search this Thread
 
Old 06-04-2023, 11:30 PM
  #91  
Gus22
Instructor
 
Gus22's Avatar
 
Join Date: Jan 2023
Location: US
Posts: 184
Received 149 Likes on 73 Posts
Default

When I went through this with my 911 tts, tyd did not update when production started. Then it just jumped straight to production completed a few days later.
Old 06-08-2023, 04:21 AM
  #92  
nguyentai8
Instructor
Thread Starter
 
nguyentai8's Avatar
 
Join Date: Mar 2023
Location: Australia
Posts: 168
Received 43 Likes on 32 Posts
Default

so today i can see that i now got a VIN number and building start tomorrow. woohooo
Old 06-08-2023, 10:51 AM
  #93  
JTG13
Instructor
 
JTG13's Avatar
 
Join Date: Mar 2023
Posts: 110
Received 75 Likes on 40 Posts
Default

My TGT finished production today. ~5 days to complete.
Old 06-08-2023, 10:59 AM
  #94  
V999
Rennlist Member
 
V999's Avatar
 
Join Date: Nov 2018
Location: On a road to nowhere.
Posts: 1,073
Received 364 Likes on 219 Posts
Default

Reading this and other "waiting" threads, I'm coming to the same conclusion others have, which is that TYD is not reliable when it come to updating various schedule events. While some folks are seeing TYD updating seemingly on schedule, others are seeing lag times between when events actually occurred and what TYD reports.

Seems we need to continue to rely on nagging our SAs for emails of screen captures of their internal build schedule instead.

It's a first-world problem, sure. But one might hope for a bit more "excellence in all things" from Porsche. The small details of the larger experience always matter.
Old 06-09-2023, 04:06 PM
  #95  
silversurfer6
Rennlist Member
 
silversurfer6's Avatar
 
Join Date: Feb 2023
Posts: 1,065
Received 695 Likes on 416 Posts
Default

My e-hybrid finishes on the 6th of July so if they ship really fast I will get it on the 26th or 29th which is the official global delivery date for all cayenne owners. Car locked 3-4 days ago and I guess is starting production soon. They have already assigned a VIN number.

Last edited by silversurfer6; 06-09-2023 at 04:07 PM.
Old 06-10-2023, 02:31 PM
  #96  
user1029
Drifting
 
user1029's Avatar
 
Join Date: Feb 2015
Posts: 3,177
Received 561 Likes on 276 Posts
Default



almost there stop by for some delicious mussels

Last edited by user1029; 06-10-2023 at 02:32 PM.
The following users liked this post:
nguyentai8 (06-10-2023)
Old 06-10-2023, 05:30 PM
  #97  
Eric11
Rennlist Member
 
Eric11's Avatar
 
Join Date: Dec 2020
Location: Austin, TX
Posts: 105
Received 80 Likes on 36 Posts
Default

VIN assigned. Cayenne S. Delivery date 7/19 to TX!
The following 2 users liked this post by Eric11:
nguyentai8 (06-10-2023), user1029 (06-10-2023)
Old 06-11-2023, 07:32 PM
  #98  
cometguy
Burning Brakes
 
cometguy's Avatar
 
Join Date: Mar 2018
Location: CARB state, USA
Posts: 1,146
Received 229 Likes on 158 Posts
Default

I'll be surprised if any American buyers get their 2024 Cayennes before August or September, possibly even October. The EPA has to approve all new models, and that can take months, in which case any cars at port just stay in port until they are cleared by EPA (and then by CARB for all buyers in CARB states, which can take another 2-4 weeks). I've not heard that the EPA has cleared any 2024 Porsches yet.
Old 06-12-2023, 12:38 AM
  #99  
nguyentai8
Instructor
Thread Starter
 
nguyentai8's Avatar
 
Join Date: Mar 2023
Location: Australia
Posts: 168
Received 43 Likes on 32 Posts
Default

I'm still stuck with stage 2. Build start meant to start June 9.
Old 06-12-2023, 10:28 AM
  #100  
knutson99
Intermediate
 
knutson99's Avatar
 
Join Date: May 2022
Location: Orange County, CA
Posts: 48
Received 22 Likes on 13 Posts
Default

My Cayenne started the manufacturing process on June 1st. It was scheduled to be complete on June 8th. The tracker is still showing it in stage 4 - manufacturing process. The boat leaves on the 20th...
Old 06-12-2023, 04:30 PM
  #101  
nguyentai8
Instructor
Thread Starter
 
nguyentai8's Avatar
 
Join Date: Mar 2023
Location: Australia
Posts: 168
Received 43 Likes on 32 Posts
Default

Ok I’m now in stage 3. Wohooo
Old 06-13-2023, 10:23 AM
  #102  
Electric Lizard
Pinecone Watchman
Rennlist Member
 
Electric Lizard's Avatar
 
Join Date: Apr 2005
Location: Near Nashville
Posts: 7,597
Received 381 Likes on 217 Posts
Default

The delivery date of my hybrid coupe to my Houston dealer has been moved back from 20Sep23 to 9Oct23. If this trend continues, it'll conveniently coincide with our planned Thanksgiving trip to Austin.

Old 06-13-2023, 10:40 AM
  #103  
silversurfer6
Rennlist Member
 
silversurfer6's Avatar
 
Join Date: Feb 2023
Posts: 1,065
Received 695 Likes on 416 Posts
Default

Originally Posted by cometguy
I'll be surprised if any American buyers get their 2024 Cayennes before August or September, possibly even October. The EPA has to approve all new models, and that can take months, in which case any cars at port just stay in port until they are cleared by EPA (and then by CARB for all buyers in CARB states, which can take another 2-4 weeks). I've not heard that the EPA has cleared any 2024 Porsches yet.
I though i answered on this. The april production cars should be at the US Ports soon. Surely porsche must have thought for a solution since they decided to have a worldwide launch on the 26th of July.

Some European dealers have received their cars and their first customer cars. I can really confirm this since I have actually "secretly" viewed and sat in a new E3.2.
Old 06-13-2023, 11:12 AM
  #104  
Electric Lizard
Pinecone Watchman
Rennlist Member
 
Electric Lizard's Avatar
 
Join Date: Apr 2005
Location: Near Nashville
Posts: 7,597
Received 381 Likes on 217 Posts
Default

Originally Posted by silversurfer6
I though i answered on this. The april production cars should be at the US Ports soon. Surely porsche must have thought for a solution since they decided to have a worldwide launch on the 26th of July.

Some European dealers have received their cars and their first customer cars. I can really confirm this since I have actually "secretly" viewed and sat in a new E3.2.
My sales guy mentioned this potential EPA mandated port hold when I updated my order to a MY2024 back in April. Needless to say, deliveries to European dealers would not be affected.
Old 06-13-2023, 05:46 PM
  #105  
T16ole
Advanced
 
T16ole's Avatar
 
Join Date: May 2023
Posts: 88
Likes: 0
Received 49 Likes on 26 Posts
Default

I received a frustrating update from my dealer today (after me calling to ask for an update).

I ordered about 6 weeks ago.

At that point I was told a Q2/Q3 build.

It then slipped to Q4, after another dealer saying they could get me one for July, I called to cancel. All of a sudden, they had a cancellation for a July build.

My spec locked today and which happen to coincide with a “delay” to an Aug build and September delivery.

Very frustrating, the cynic in me thinks a July build never existing and said what they need to in order to keep the order.