992 build lost in the Porsche-o-sphere?
#46
#47
I thought we were onto something but I guess not 😂 the delay continues!
#49
#52
#53
kind of wish they’d send a note saying wait or forego. If it’s just my extra leather I’d just scrap it. I waffled so much on build that I’d never miss it!
#54
My date changed today from May 5 to May 28 - which of course is around a holiday so it probably will not happen. Getting a bit frustrated with the process.
#55
My T production started 4/25 and finished on 4/30. Also, on 4/30 the car was marked as in route to the port. I've received no production pictures as of date. Obviously the system is not consistent.
Not many options on this build (T leather/race-tex/gray stitching, RWS, Carbon roof, Bose). I'm still on track for 6/17 delivery.
... also spec'd it in IGM! Just sitting here hitting the refresh key. :-\
Not many options on this build (T leather/race-tex/gray stitching, RWS, Carbon roof, Bose). I'm still on track for 6/17 delivery.
... also spec'd it in IGM! Just sitting here hitting the refresh key. :-\
#56
My T production started 4/25 and finished on 4/30. Also, on 4/30 the car was marked as in route to the port. I've received no production pictures as of date. Obviously the system is not consistent.
Not many options on this build (T leather/race-tex/gray stitching, RWS, Carbon roof, Bose). I'm still on track for 6/17 delivery.
... also spec'd it in IGM! Just sitting here hitting the refresh key. :-\
Not many options on this build (T leather/race-tex/gray stitching, RWS, Carbon roof, Bose). I'm still on track for 6/17 delivery.
... also spec'd it in IGM! Just sitting here hitting the refresh key. :-\
#57
Rennlist Member
I received the elevator photo for my T near the end of the first week of November 2023 and then it was delayed for an additional 19 days of production, Monday through Friday. Zuffenhausen does not operate on Saturdays and Sundays. One of three things possibly held it up, the dash cam wiring prep, aluminum pedals or the bespoke center console lid. My money is on the bespoke console lid as an item like that actually sends vehicles to the Exclusive Manufaktur department. FYI, the other two anforementioned items are installed on the assembly line during production. Note, the actual PAG internal end of production date on my car was is at the end of November 2023, not the day of the elevator photo.
The other thing that could possibly be delaying 992s is that the Bose stereo is still constrained. Allegedly PAG is still have having chip related issues with that.
The other thing that could possibly be delaying 992s is that the Bose stereo is still constrained. Allegedly PAG is still have having chip related issues with that.
Last edited by TUD; 05-01-2024 at 04:29 PM.
#59