Notices
992 2019-Present The Forum for the Non-Turbo 911
Sponsored by:
Sponsored by:

2022 Allocation Dates

Thread Tools
 
Search this Thread
 
Old 07-01-2021, 10:08 AM
  #151  
brianja
Rennlist Member
 
brianja's Avatar
 
Join Date: Dec 2011
Location: NYC
Posts: 706
Received 690 Likes on 268 Posts
Default

Originally Posted by rk-d
Double check on your lock dates. My build froze in early May for a late November PTS delivery. Porsche locks PTS earlier than the conventional timeline suggests. My supposed lock date was in September. Once Porsche locks in the PTS color, it locks the build completely.
@rk-d Since you had me worried I emailed my SA. He shared the following excerpt from his emails with his "Order Management Specialist with Porsche NA" regarding changes after PTS color lock, but before freeze point:
"You have it right. You send it to us and then we will reach out to PAG to unlock the configuration. Then we’ll make those changes for you and let you know when it’s done. If you don’t want to go through the trouble of creating a new Porsche code you can just let us know the options you’d like to add/remove. Ideally that kind of thing only happens once or twice between now and when the car reaches its change freeze point though. PAG can get a little feisty about frequently unlocking and locking Custom Color orders."

Old 07-01-2021, 10:15 AM
  #152  
Go Bruins
Rennlist Member
 
Go Bruins's Avatar
 
Join Date: Apr 2021
Location: Torrance, CA
Posts: 609
Received 572 Likes on 256 Posts
Default

Originally Posted by MG997
I have a July build but with the august shutdown, delivery is October
My situation is the same. The freeze date for my Dolomite Silver Targa 4 is tomorrow (July 2). The delivery date is 10/24 at PEC-LA. The August vacation recess pushes it back at least three weeks. But TYD also notes a 3-week time frame from arrival at the Emden port to when it gets on a boat. I wonder if that's accurate.
The following users liked this post:
laurenxesq (07-09-2021)
Old 07-01-2021, 10:36 AM
  #153  
rk-d
Rennlist Member
 
rk-d's Avatar
 
Join Date: Jun 2015
Posts: 8,154
Received 6,470 Likes on 2,814 Posts
Default

Originally Posted by brianja
@rk-d Since you had me worried I emailed my SA. He shared the following excerpt from his emails with his "Order Management Specialist with Porsche NA" regarding changes after PTS color lock, but before freeze point:



PAG is feisty is the take home message here 😁

PCNA/PAG refused to re-open my build when I was considering a configuration change (nothing big and I've since decided that I don't really want to make that change). It went up the ladder from the regional rep to PAG and they declined to open it up. Supposedly the color lock date is not the same as the build lock date which is in September, but from a practical standpoint - it's one and the same (for me at least). When you get in these custom color builds, it starts getting weird and inconsistent (and probably political). So I think the bottom line - make damn sure you like your configuration as it is now.
Old 07-01-2021, 10:58 AM
  #154  
brianja
Rennlist Member
 
brianja's Avatar
 
Join Date: Dec 2011
Location: NYC
Posts: 706
Received 690 Likes on 268 Posts
Default

Originally Posted by rk-d
PAG is feisty is the take home message here 😁
This sounds exactly right. lol.

Please tell PAG not to seal the can on any extra paint they have from your car too tightly... you and I have similar taste (though mine's a C4S).
Old 07-09-2021, 04:41 PM
  #155  
laurenxesq
Instructor
 
laurenxesq's Avatar
 
Join Date: Feb 2017
Location: Socal
Posts: 147
Received 70 Likes on 39 Posts
Default

Originally Posted by Go Bruins
My situation is the same. The freeze date for my Dolomite Silver Targa 4 is tomorrow (July 2). The delivery date is 10/24 at PEC-LA. The August vacation recess pushes it back at least three weeks. But TYD also notes a 3-week time frame from arrival at the Emden port to when it gets on a boat. I wonder if that's accurate.
Hi there. My freeze date is a few days later than your's, and my delivery date is 10/29. Perhaps both our cars will be on the same vessel (I am also in Socal, thus a Trojan).
Cheers.

The following 2 users liked this post by laurenxesq:
Go Bruins (07-09-2021), slwong23 (07-09-2021)
Old 07-09-2021, 04:50 PM
  #156  
thomd
Advanced
 
thomd's Avatar
 
Join Date: Jul 2014
Location: Texas
Posts: 90
Received 39 Likes on 23 Posts
Default

I have an allocation that I am told is an early November delivery. I see on here that some others have a late October delivery and their freeze date is now. AND, they have access to their TYD. I have seen my build sheet and it is Status of V200. SO, when will I get my TYD? Is there anything I need to do?
Old 07-09-2021, 08:18 PM
  #157  
Go Bruins
Rennlist Member
 
Go Bruins's Avatar
 
Join Date: Apr 2021
Location: Torrance, CA
Posts: 609
Received 572 Likes on 256 Posts
Default

[QUOTE=laurenxesq;17540951]Hi there. My freeze date is a few days later than your's, and my delivery date is 10/29. Perhaps both our cars will be on the same vessel (I am also in Socal, thus a Trojan).
Cheers.
QUOTE]

My shipping date just got adjusted today. Delivery is now showing 10/17. I've asked my S.A. to run an internal check to see what he sees. I agree our rides will be on the same boat!
The following 2 users liked this post by Go Bruins:
laurenxesq (07-10-2021), MG997 (07-10-2021)
Old 07-12-2021, 05:31 PM
  #158  
991.1 Guy
Three Wheelin'
 
991.1 Guy's Avatar
 
Join Date: Mar 2020
Location: Central Florida
Posts: 1,689
Received 920 Likes on 485 Posts
Default

I just got the e-mail that my car has finished production. It must be close to the beginning of the new model year in production. Have any other MY 2022's been produced or delivered yet?
Old 07-13-2021, 11:11 AM
  #159  
Agave
Advanced
 
Agave's Avatar
 
Join Date: Dec 2019
Location: San Antonio Texas
Posts: 90
Received 35 Likes on 20 Posts
Default

Hello there.

Anyone out there able to Order a 2022 night blue metallic Carrera S? if so on what date?

I have been trying to get an allocation here in Austin/San Antonio area. San Antonio says 3 people in front of me. Austin says deposit to get in line for an allocation, an no more night blue.

Anyway I hear night blue is being phased out, I am looking for sign that night blue will still be available if i can secure an allocation by labor day.

Appreciate the feedback.

Last edited by Agave; 07-13-2021 at 11:14 AM.
The following users liked this post:
svkarl (07-14-2021)
Old 07-13-2021, 03:42 PM
  #160  
sfy1505
Rennlist Member
 
sfy1505's Avatar
 
Join Date: Mar 2012
Location: Oklahoma
Posts: 220
Likes: 0
Received 73 Likes on 35 Posts
Default

I have a Night Blue Metallic 2022 Targa 4S on order. Production completion 10/8 and I pick it up at the Zuffenhausen factory on 10/26. Night Blue ends production at the end of November.
The following users liked this post:
voyagez.fr (07-23-2021)
Old 07-13-2021, 04:27 PM
  #161  
brianja
Rennlist Member
 
brianja's Avatar
 
Join Date: Dec 2011
Location: NYC
Posts: 706
Received 690 Likes on 268 Posts
Default

Originally Posted by rk-d
PAG is feisty is the take home message here 😁

PCNA/PAG refused to re-open my build when I was considering a configuration change (nothing big and I've since decided that I don't really want to make that change). It went up the ladder from the regional rep to PAG and they declined to open it up. Supposedly the color lock date is not the same as the build lock date which is in September, but from a practical standpoint - it's one and the same (for me at least). When you get in these custom color builds, it starts getting weird and inconsistent (and probably political). So I think the bottom line - make damn sure you like your configuration as it is now.
@rk-d I just wanted to follow up on this topic with you since you were kind enough to warn me about getting things in early. My PTS selection lock was 6/21/21. I had a preliminary (placeholder) build in place at that time, as per my SA's instructions. Once that was approved and I was scheduled for production with a change freeze date in late September I finalized my choices (nearly everything aesthetic changed... nothing mechanical) and sent them to my SA. It took about a week from submission to him to unlock/approval/update of TYD by PAG, but my final choices were all made on my build and it all appears right in TYD as of yesterday. I'm not sure if they would do it again for me, but I shouldn't need it as I'm pleased with my spec as-is.

Now... I wait.
Old 07-13-2021, 08:48 PM
  #162  
tgcrun
Three Wheelin'
 
tgcrun's Avatar
 
Join Date: Sep 2004
Posts: 1,319
Received 438 Likes on 234 Posts
Default

[QUOTE=laurenxesq;17540951]Hi there. My freeze date is a few days later than your's, and my delivery date is 10/29. Perhaps both our cars will be on the same vessel (I am also in Socal, thus a Trojan).
Cheers.

I'm also in SoCal (Pasadena). I ordered my car in April when I lived in PA and am taking delivery at the LA PEC. My lock date is 7/23, but production doesn't start until 8/27. I assume that's because of the August holiday. Delivery is scheduled for 10/31, so we might be on the same boat.
The following users liked this post:
laurenxesq (07-22-2021)
Old 07-14-2021, 07:07 PM
  #163  
laurenxesq
Instructor
 
laurenxesq's Avatar
 
Join Date: Feb 2017
Location: Socal
Posts: 147
Received 70 Likes on 39 Posts
Default

[QUOTE=Go Bruins;17541354]
Originally Posted by laurenxesq
Hi there. My freeze date is a few days later than your's, and my delivery date is 10/29. Perhaps both our cars will be on the same vessel (I am also in Socal, thus a Trojan).
Cheers.
QUOTE]

My shipping date just got adjusted today. Delivery is now showing 10/17. I've asked my S.A. to run an internal check to see what he sees. I agree our rides will be on the same boat!

That's great news; congrats! I just checked mine; remained the same 10/29/2021 :-( perhaps not the same vessel.
Old 07-14-2021, 08:49 PM
  #164  
famous shoes
Rennlist Member
 
famous shoes's Avatar
 
Join Date: Jun 2016
Location: South Texas
Posts: 123
Received 45 Likes on 20 Posts
Default

I've been waiting for a C2S allocation in San Antonio since May. Stopped by the dealership today and SA told me he expects some slots from P on Friday for production beginning in November, I believe. I don't know about Night Blue metallic, but it sounds like you may be on the bubble. Surprising that they would cancel that color as they have carried it for so many years.

This will be my sixth 911 and all were custom orders. For this car I want PTS Irish Green. SA said PTS will take longer which I expect and don't mind. I'd rather not pay the extra 11K for PTS but I don't mind waiting to get what I want. My build code is PNTNQH92.

I'm number two on the list according to my SA and he told me a couple of weeks ago that he now had 10 people with configurations behind me. Interestingly, he said that he had an allocation for a base C2 a few weeks ago that went unfilled for several weeks. Most customers want an S, at least in our area.

Last edited by famous shoes; 07-14-2021 at 09:06 PM.
The following users liked this post:
Agave (07-15-2021)
Old 07-15-2021, 10:41 AM
  #165  
Agave
Advanced
 
Agave's Avatar
 
Join Date: Dec 2019
Location: San Antonio Texas
Posts: 90
Received 35 Likes on 20 Posts
Default

Thanks for the feedback,

Your build is gonna look sweet! With that brown interior !


Quick Reply: 2022 Allocation Dates



All times are GMT -3. The time now is 06:19 PM.