Official waiting room for those with a new 991.2 on order --- come on in !!
#3827
Instructor
Just today received V200 status for a 2019 991.2 Carrera 2S ... interestingly, the Commission Number (67xxx) on my V200 build sheet changed from the original CN (53xxx) when given V070 status.
Initially back in April, the dealer indicated that I would hopefully get a July production date but when all was said and done, the date ended up being in mid-October. This particular dealer only got two pre-Summer break allocations, both Carrera T. My Carrera 2S was their third MY 2019 allocation and I'm presuming that it only turned into a C2S allocation because of my order demand in the system. Schedule is V250: 9/28/18, V260: 10/12/18, V300: 10/19/18 and ultimately V900 12/28/18 ... this is a US West Coast delivery. Only one day scheduled (10/19) through the Custom Tailoring area.
Build code: PKWPZZP7. BTW, the only decision still potentially in flux is the car color ... leaning GT Silver but Agate Grey still in the running, if I change to Agate Grey, will probably drop the XAX (body color rear lid slats) option.
Initially back in April, the dealer indicated that I would hopefully get a July production date but when all was said and done, the date ended up being in mid-October. This particular dealer only got two pre-Summer break allocations, both Carrera T. My Carrera 2S was their third MY 2019 allocation and I'm presuming that it only turned into a C2S allocation because of my order demand in the system. Schedule is V250: 9/28/18, V260: 10/12/18, V300: 10/19/18 and ultimately V900 12/28/18 ... this is a US West Coast delivery. Only one day scheduled (10/19) through the Custom Tailoring area.
Build code: PKWPZZP7. BTW, the only decision still potentially in flux is the car color ... leaning GT Silver but Agate Grey still in the running, if I change to Agate Grey, will probably drop the XAX (body color rear lid slats) option.
#3828
911T build....
First post on RL although multiple Pcar owner. Upcoming build as follows:
http://www.porsche-code.com/PKXBE6L4
Hoping this will be a very clean, simple, and raw driver.
http://www.porsche-code.com/PKXBE6L4
Hoping this will be a very clean, simple, and raw driver.
#3829
Rennlist Member
My car completed production on July 7. I have a commission number but I can't figure out how to see the progression of the build process. Does that have to come from the dealer?
My car is do to arrive in Emden on the 13, onto a ship on August 3rd to arrive in Jacksonville on the 17th. I was just hoping to watch the process a little.
THANKS if any of you have suggestions for tracking the process/progress.
Rich
My car is do to arrive in Emden on the 13, onto a ship on August 3rd to arrive in Jacksonville on the 17th. I was just hoping to watch the process a little.
THANKS if any of you have suggestions for tracking the process/progress.
Rich
#3832
Just received word that my GT silver GTS coupe is to be finished production this Fri 7/20, so that is good! Very excited for this car as Ive had a bunch of BMWs, an E63 benz, but never a Porsche.
my build is: www.porsche-code.com/PKWH7WA7
I had originally planned a Leipzig delivery, but I am going to pass on ED. A date was given 11th hr., but not really in the 10 day window I have avail to make the trip. Seems that Porsche ED is simply not as "friendly" as BMWs(Ive done and loved the 3 BMW EDs ive done) For all the great things on the PNA website about their ED program, they dont bother to tell you a lot of details that impact the deal.
Regardless, I thrilled if this car hits the west coast early/mid-Sept.
A wealth of info here on rennlist! Now Ill just pass the time reading about what all the folks are doing that already have their cars
my build is: www.porsche-code.com/PKWH7WA7
I had originally planned a Leipzig delivery, but I am going to pass on ED. A date was given 11th hr., but not really in the 10 day window I have avail to make the trip. Seems that Porsche ED is simply not as "friendly" as BMWs(Ive done and loved the 3 BMW EDs ive done) For all the great things on the PNA website about their ED program, they dont bother to tell you a lot of details that impact the deal.
Regardless, I thrilled if this car hits the west coast early/mid-Sept.
A wealth of info here on rennlist! Now Ill just pass the time reading about what all the folks are doing that already have their cars
#3833
Rennlist Member
#3834
#3836
Rennlist Member
Just wanted to post this as an FYI for those waiting:
991.2 4S
Car ordered: April 12
Estimated Completion: July 20 (little over three months)
Actual Completion: July 17
Arrival at Atlanta dealership (via port of Jacksonville): August 14th (18 weeks / 4 months from order)
991.2 4S
Car ordered: April 12
Estimated Completion: July 20 (little over three months)
Actual Completion: July 17
Arrival at Atlanta dealership (via port of Jacksonville): August 14th (18 weeks / 4 months from order)
#3837
Sweet - another Carmine Red (like mine). So you collected it, right? Pics pls!!!
#3838
Gentlemen,
Say hello to my little friend............
Attachment 1170979
More pics to follow after car is wrapped.
Was fun being here, best of luck to all those waiting. Trust me it is well worth the wait
Say hello to my little friend............
Attachment 1170979
More pics to follow after car is wrapped.
Was fun being here, best of luck to all those waiting. Trust me it is well worth the wait
Just cant wait for mine to arrive ... taking delivery early Oct!!!
#3839
Rennlist Member