90+ harnesses are almost done. I will have everyones made by the end of the night, and they will be on the way to Paul first thing monday morning.

I am hoping to get most if not all of the 89 and older harnesses done tomorrow. I will make sure to post an progress report tomorrow.

Thanks,
Hans
Old 01-23-2011, 12:49 AM
  #167  
928mac
Drifting
 
928mac's Avatar
 
Join Date: Oct 2009
Location: Alberta, Canada
Posts: 2,638
Likes: 0
Received 2 Likes on 1 Post
Default

How about this for a kick down picture

Old 01-23-2011, 08:55 AM
  #168  
jwillman
Rennlist Member
 
jwillman's Avatar
 
Join Date: Jul 2009
Location: Austin, Texas
Posts: 1,895
Received 9 Likes on 8 Posts
Default

Originally Posted by pcar928fan
Brian, you can buy just the decals bro... Call Nicole at Hooked on Cars, she probably has them on hand! They are cheap too! Used them in my '81! Work great!
The switches also feel bad. One side is smooth without a lot of pressure required and the drivers side ( pulled from sexual chocolate) is much stiffer and clicky. Now that I think about it I am not sure which is correct since this is my first 928

Last edited by jwillman; 01-24-2011 at 08:51 AM.
Old 01-23-2011, 11:54 PM
  #169  
hans14914
Rennlist Member
 
hans14914's Avatar
 
Join Date: Aug 2003
Location: Indianapolis
Posts: 2,615
Likes: 0
Received 287 Likes on 122 Posts
Default

I completed about 15 of the 90+ harnesses, and have been working all day on the 89 and older versions. I have been building the various elements that go into the harness, so the final assembly is very modular, with differences coming mainly in how the harness is punched down.

Harness assembly is taking much more time than expected. I have about 22 of the 89> harnesses components assembled. I have approximately 24hours this weekend into construction, so it looks like I will be averaging about 50minutes/harness all said and done.

So, looks like the package of harnesses will be shipping out to Paul on Tuesday morning instead of Monday. This will include most of the harnesses. We had some late updates from customers, which will require ordering some additional materials, and those harnesses will not ship down to Paul until later in the week.

Thanks
Hans
Old 01-24-2011, 11:49 PM
  #170  
hans14914
Rennlist Member
 
hans14914's Avatar
 
Join Date: Aug 2003
Location: Indianapolis
Posts: 2,615
Likes: 0
Received 287 Likes on 122 Posts
Default

Put another evening into the harnesses. We are getting closer, but they wont ship out tomorrow.

I dont think i have run across two identical older style harnesses yet. Each one requires some kind of custom modification. Even though I have most of the major components of the harnesses assembled, I have to do modify each one in some way. I have about a dozen of the the earlier harnesses about 90% done. I am going to go through and get the bulk of all the harnesses done, and then go back and perform the customizations... that seems to be the fastest method so far.

Thanks for your patience. I am constantly recalculating the time that goes into each harness. It has now certainly surpassed the hour/harness mark, and with over 50 harnesses to do, it looks like these wont ship till Thursday.

I will continue to post updates.

Thanks
Hans
Old 01-25-2011, 05:57 AM
  #171  
RKD in OKC
Rennlist Member
 
RKD in OKC's Avatar
 
Join Date: Oct 2004
Location: In a tizzy
Posts: 4,987
Likes: 0
Received 14 Likes on 11 Posts
Default

Hans, you da man! Felt like this needed to be said.
Old 01-25-2011, 07:35 AM
  #172  
Koenig-Specials 928
Three Wheelin'
 
Koenig-Specials 928's Avatar
 
Join Date: Dec 2002
Location: Canada
Posts: 1,477
Received 50 Likes on 41 Posts
Default

Hans for a lot of us the cars are hibernating and it's too cold outside to do anything at all.
Old 01-31-2011, 03:41 PM
  #173  
hans14914
Rennlist Member
 
hans14914's Avatar
 
Join Date: Aug 2003
Location: Indianapolis
Posts: 2,615
Likes: 0
Received 287 Likes on 122 Posts
Default

80% of the harnesses are done. I was waiting on a couple parts to come in to finish the rest (ran out of some wire, diodes and modules for some that ordered later than the original group buy), and all came in over the weekend. I should have enough time tonight to get these finished up and sent out tonight.

Thanks again for all your patience. I have learned quite a bit about assembling these, and will be incorporating some changes into the future version of the harnesses to make these faster. I will be posting the changes for future customers later this week, but in summary for a plug-and-play harness on the 89 and older, I will only offer the 530t, so in a sunroof application two 530t modules will be required. We will also be recommending the 611t for all applications, as it can be configured to act in the same way the 528t can, but with additional functionality.

The 530t does cost more for a sunroof application, but it offers some additional functionality as well as a less sensitive sensing circuit which helps with sticky/slow sunroofs. If any current harness owner has any issues with using the 528 for the sunroof, I will gladly rework the harness for dual 530t installation, but this should only be necessary if there is an underlying mechanical issue with the sunroof which should probably be addressed anyway.

Thanks,
Hans
Old 02-01-2011, 05:54 PM
  #174  
hans14914
Rennlist Member
 
hans14914's Avatar
 
Join Date: Aug 2003
Location: Indianapolis
Posts: 2,615
Likes: 0
Received 287 Likes on 122 Posts
Default

Harnesses are DONE!

Shipping to Paul as soon as the weather permits (we are in the middle of that ice storm).

I will be getting instructions together and posted.

Thanks guys.
Old 02-01-2011, 06:18 PM
  #175  
Ducman82
 
Ducman82's Avatar
 
Join Date: Nov 2009
Location: Marysville WA
Posts: 6,983
Received 18 Likes on 11 Posts
Default

yay!!!!!
Old 02-01-2011, 06:39 PM
  #176  
jeff spahn
Rennlist Member
 
jeff spahn's Avatar
 
Join Date: Nov 2009
Location: Dubuque, IA
Posts: 8,599
Received 396 Likes on 224 Posts
Default

Hans I never doubted your resolve. Now where are my illuminated sills!
Old 02-01-2011, 07:12 PM
  #177  
Dads928
Rennlist Member
 
Dads928's Avatar
 
Join Date: Nov 2008
Location: Toronto
Posts: 132
Received 7 Likes on 6 Posts
Default

put me on the list as well please, my console switches drive me nuts.
Old 02-01-2011, 07:55 PM
  #178  
Champagne
Former Vendor
Thread Starter
 
Champagne's Avatar
 
Join Date: Apr 2002
Location: Corpus Christi
Posts: 2,260
Likes: 0
Received 1 Like on 1 Post
Default

Originally Posted by jeff spahn
Hans I never doubted your resolve. Now where are my illuminated sills!
Jeff,

I will contact those who wanted to be added to the sill project list and invoice them so that I can ship both projects together.

I have everything on hand for the illuminated sills. Everything except time that is

Paul
Old 02-01-2011, 07:58 PM
  #179  
Champagne
Former Vendor
Thread Starter
 
Champagne's Avatar
 
Join Date: Apr 2002
Location: Corpus Christi
Posts: 2,260
Likes: 0
Received 1 Like on 1 Post
Default

Originally Posted by Dads928
put me on the list as well please, my console switches drive me nuts.
Please contact me directly: champagn@stx.rr.com

Thanks

Paul
Old 02-01-2011, 10:20 PM
  #180  
jeff spahn
Rennlist Member
 
jeff spahn's Avatar
 
Join Date: Nov 2009
Location: Dubuque, IA
Posts: 8,599
Received 396 Likes on 224 Posts
Default

Originally Posted by Champagne
Jeff,

I will contact those who wanted to be added to the sill project list and invoice them so that I can ship both projects together.

I have everything on hand for the illuminated sills. Everything except time that is

Paul

Paul. Don't worry about it. Ship the switches when you get them. we'll get the sills when you get them done. I am not worried about savings on combined shipping.


Quick Reply: Illuminated Window Switch Project ** MAILING AND GUIDE UPDATE **



All times are GMT -3. The time now is 11:51 AM.