What is your winter project?
#1
Basic Sponsor
Rennlist
Site Sponsor
Rennlist
Site Sponsor
Thread Starter
What is your winter project?
I posted this on another forum, but it seems pretty appropriate here.
So...what is your winter projects on your Race/Track cars? Last year, I had a LOOOONG list. I finished most of it, but here is the 2009/2010 winter list...
HUEY Projects:
- Install Tilton Brake Bias adjuster (project from last year)
- install blade fuse panel (from last year)
- re-do door panels
- re-do dash face
- new plug wires
- carpeting (from last year) with soundproofing on fire wall (its kind of a street car)
- relocate battery
- new muffler
- new clutch/pressure plate
- limited slip???
- new suspension - maybe Koni adjustable or something
- figure out how to make 914-6/911 left hand key ignition
- fix an old/new oil leak that is driving me crazy
- fix weird ignition problem
- maybe do megasquirt EFI....not sure yet...maybe just PMO carbs
PAPA SMURF Projects:
- new clutch/pp/lwfw
- limited slip
- install hood pins
- scrape tar off floor/paint pass compartment
- make new custom wiring harness
- fix fuel guage/sending unit
- fix temp guage/sending unit
- repair fiberglass from agricutural excursion of 2008 at VIR (from last year)
- rear brake pads
- re-do dash and guages
Thats it for me, I think...
Anyone else?
So...what is your winter projects on your Race/Track cars? Last year, I had a LOOOONG list. I finished most of it, but here is the 2009/2010 winter list...
HUEY Projects:
- Install Tilton Brake Bias adjuster (project from last year)
- install blade fuse panel (from last year)
- re-do door panels
- re-do dash face
- new plug wires
- carpeting (from last year) with soundproofing on fire wall (its kind of a street car)
- relocate battery
- new muffler
- new clutch/pressure plate
- limited slip???
- new suspension - maybe Koni adjustable or something
- figure out how to make 914-6/911 left hand key ignition
- fix an old/new oil leak that is driving me crazy
- fix weird ignition problem
- maybe do megasquirt EFI....not sure yet...maybe just PMO carbs
PAPA SMURF Projects:
- new clutch/pp/lwfw
- limited slip
- install hood pins
- scrape tar off floor/paint pass compartment
- make new custom wiring harness
- fix fuel guage/sending unit
- fix temp guage/sending unit
- repair fiberglass from agricutural excursion of 2008 at VIR (from last year)
- rear brake pads
- re-do dash and guages
Thats it for me, I think...
Anyone else?
__________________
Bob Saville
Getting You On Track!
www.naroescapemotorsports.com
704-395-2975
'07 SPC
'71 914/6 Huey
'04 GT3
Bob Saville
Getting You On Track!
www.naroescapemotorsports.com
704-395-2975
- Data Analysis & Coaching
- Drivers Gear
- Crew Gear
- Car Gear
'07 SPC
'71 914/6 Huey
'04 GT3
#2
Rennlist Member
Project #1 - Wash it
Project #2 - Park it.. im tired of working on this thing....
Then when that is done,
Cool Suit
Radio
Data Aquisition
Short Shift
Revise exhaust, see if getting rid of the cat helps or hurts
Project #2 - Park it.. im tired of working on this thing....
Then when that is done,
Cool Suit
Radio
Data Aquisition
Short Shift
Revise exhaust, see if getting rid of the cat helps or hurts
#6
Drifting
Close off sunroof
Strip interior
Fix body damage
Paint touch ups
I think of all it will be done before 12/21.... So what will I do this winter?
Strip interior
Fix body damage
Paint touch ups
I think of all it will be done before 12/21.... So what will I do this winter?
Trending Topics
#8
-new shocks and springs all around
-fab up new oil cooler ducting
-rebuild front brake calipers
-paint fender wells and underside of trunk
-install newly rebuilt transmission
-fab up new oil cooler ducting
-rebuild front brake calipers
-paint fender wells and underside of trunk
-install newly rebuilt transmission
#10
Basic Sponsor
Rennlist
Site Sponsor
Rennlist
Site Sponsor
Thread Starter
#11
Rennlist Member
1) Strip interior (done).
2) Paint interior (done).
3) Wevo shifter install (done).
4) New engine and tranny oil.
5) Remove A/C compressor.
6) RSR fiberglass front bumper.
7) Re-weigh and corner balance.
March 2010 can't come soon enough.
2) Paint interior (done).
3) Wevo shifter install (done).
4) New engine and tranny oil.
5) Remove A/C compressor.
6) RSR fiberglass front bumper.
7) Re-weigh and corner balance.
March 2010 can't come soon enough.
Last edited by Astroman; 11-28-2009 at 09:48 PM.
#12
Rennlist Member
1. suspension overhall in progress
2. lexan windshield
3. add oil pressure/temp and steering angle sensors to the IQ3
4. ??? alignment gauges and scales ???
2. lexan windshield
3. add oil pressure/temp and steering angle sensors to the IQ3
4. ??? alignment gauges and scales ???
#13
Drifting
[QUOTE=BostonDMD;7095551]You can work on mine........[/QUOTE
In exchange for a new crown on tooth 17.
In exchange for a new crown on tooth 17.
#14
Drifting