Wrapping up Harness to Roll Bar ??
#16
The strap in the picture is not done being woven yet! Bring the end back and run it under the back upper bar of the 3 bar slider. Then do the zip tie thing by rolling the slack into a tight tube and threading through the tube and then through the upper section of belt between the slider and bar. The rolled extra will be above the belt and bar. This makes it easy to check that the 3 bar slider is threaded right.
The extra threading step will reduce pull through in an impact and is required by most groups. As the belt loads up it will pull against itself on both sides of the loading belt. Snug the 3 bar slider to the bar as well to reduce take up. Any space will add to the unwanted take up in an impact.
The extra threading step will reduce pull through in an impact and is required by most groups. As the belt loads up it will pull against itself on both sides of the loading belt. Snug the 3 bar slider to the bar as well to reduce take up. Any space will add to the unwanted take up in an impact.