Former Vendor
Thanks Jake! I'll dig deeper looking into the running clearances.
Also I wouldn't dream of using anything inappropriate for lubes and sealants. Any thoughts on using a dry lubricant like Quickseat?
Regarding workspace I've got three potential locations, but really want to maintain the 72 deg temp throughout the build so the garage is out. Think the smell from my hockey gear already designates the house a hazmat area.
Also I wouldn't dream of using anything inappropriate for lubes and sealants. Any thoughts on using a dry lubricant like Quickseat?
Regarding workspace I've got three potential locations, but really want to maintain the 72 deg temp throughout the build so the garage is out. Think the smell from my hockey gear already designates the house a hazmat area.
The only way you can't go wrong is by directing these questions to the manufacturers of the components that you are using. It's their product, and it's their place to support that product.
#62
Rennlist Member
"Just calling it as I see it. If you have to compromise the process for any reason, this isn't for you.
A couple of weeks ago some guy called and literally told me that he was afraid to push the main bearings into the crankshaft carrier firmly because he was concerned about "breaking a nail".
My response undoubtedly scarred him for life. Really?"
^^^ That's classic ! ^^^
A couple of weeks ago some guy called and literally told me that he was afraid to push the main bearings into the crankshaft carrier firmly because he was concerned about "breaking a nail".
My response undoubtedly scarred him for life. Really?"
^^^ That's classic ! ^^^
#63
Former Vendor
"Just calling it as I see it. If you have to compromise the process for any reason, this isn't for you.
A couple of weeks ago some guy called and literally told me that he was afraid to push the main bearings into the crankshaft carrier firmly because he was concerned about "breaking a nail".
My response undoubtedly scarred him for life. Really?"
^^^ That's classic ! ^^^
A couple of weeks ago some guy called and literally told me that he was afraid to push the main bearings into the crankshaft carrier firmly because he was concerned about "breaking a nail".
My response undoubtedly scarred him for life. Really?"
^^^ That's classic ! ^^^
I'm sure he probably had a lumberjack beard, was wearing a plaid shirt, with skinny jeans, and had a man bun. He probably "moisturizes" 3 times per day.
The following users liked this post:
dporto (02-19-2020)
#64
Captain Obvious
Super User
Super User
Sweet Jeebus! My vegetable oil post got blown out of proportion real quick.
To the OP, keep going dude! The piston that had the cylinder cracked, doesn't look like it ran for long with lots of coolant going into it or else the piston top would look brand new.
To the OP, keep going dude! The piston that had the cylinder cracked, doesn't look like it ran for long with lots of coolant going into it or else the piston top would look brand new.
#66
Rennlist Member
"I'm sure he probably had a lumberjack beard, was wearing a plaid shirt, with skinny jeans, and had a man bun. He probably "moisturizes" 3 times per day."
Sounds like Brooklyn (and I'm sure some sections of Atlanta)...
Sounds like Brooklyn (and I'm sure some sections of Atlanta)...
#68
Former Vendor
#70
Rennlist Member
Thread Starter
So now for the fun stuff...
First parts to get sent out were the cylinder heads. Got them down to Len Hoffman in early December, and got them back early February. Focus was to get the heads to really complement the bump to 3.8L. Ended up going with the oversized intake valves, Stage 1 porting (intake side only), and new guides and springs. Probably overkill. What really sold me was him saying "This will be the cheapest power you're adding to the motor"
Pool table (covered) should make for a decent workspace
Oversized intake valves (38mm vs 37mm)
Stage 1 porting on the intake side. Nothing done on the exhaust side
First parts to get sent out were the cylinder heads. Got them down to Len Hoffman in early December, and got them back early February. Focus was to get the heads to really complement the bump to 3.8L. Ended up going with the oversized intake valves, Stage 1 porting (intake side only), and new guides and springs. Probably overkill. What really sold me was him saying "This will be the cheapest power you're adding to the motor"
Pool table (covered) should make for a decent workspace
Oversized intake valves (38mm vs 37mm)
Stage 1 porting on the intake side. Nothing done on the exhaust side
Last edited by yaz996; 02-23-2020 at 03:31 PM.
The following users liked this post:
Scott at Team Harco (02-23-2020)
#71
You've just described half of the male population I have to suffer out here in SF.
The following users liked this post:
Bash Hat (02-23-2020)
#72
Rennlist Member
Thread Starter
Next thing to get shipped off was the IMS to LN for their rebuild service. Also took advantage of their Black Friday sale and saved 20% on the IMS Solution. Actually got it back within a week.
#73
Rennlist Member
Thread Starter
Engine case made it to LN a couple days before Xmas. Had them back with 101mm Nickies in just under 7 weeks. George was pleasure to speak to throughout the process. Should be doing the pre-build cleaning shortly.
#74
Rennlist Member
Thread Starter
So now we're all caught up. Calibration weights were delivered today so I weighed the JE pistons and wrist pins. Shouldn't have any problem pairing this set
Pistons:
438.4g
438.5g
438.8g
438.5g
438.4g
438.8g
Wrist Pins:
89.3g
89.3g
89.5g
89.4g
89.3g
89.4g
Waiting to weigh the connecting rods until I finish 3D printing some pieces for a balancing rig.
Pistons:
438.4g
438.5g
438.8g
438.5g
438.4g
438.8g
Wrist Pins:
89.3g
89.3g
89.5g
89.4g
89.3g
89.4g
Waiting to weigh the connecting rods until I finish 3D printing some pieces for a balancing rig.