Old 06-07-2024, 11:38 AM
  #31  
Ceepe
Rennlist Member
 
Ceepe's Avatar
 
Join Date: Mar 2014
Location: CT
Posts: 1,564
Received 539 Likes on 285 Posts
Default

I believe it was due to a shortage of parts. They opted to keep them available on the more expensive models and builds.
Old 06-07-2024, 12:01 PM
  #32  
brandobot
Rennlist Member
 
brandobot's Avatar
 
Join Date: Feb 2012
Location: California
Posts: 520
Received 160 Likes on 99 Posts
Default

Originally Posted by Ceepe
I believe it was due to a shortage of parts. They opted to keep them available on the more expensive models and builds.
that could explain why I was able to order them on my GTS
Old 06-07-2024, 12:17 PM
  #33  
sk911
Rennlist Member
 
sk911's Avatar
 
Join Date: Feb 2007
Location: Arizona
Posts: 270
Likes: 0
Received 109 Likes on 72 Posts
Default

Originally Posted by Ceepe
I believe it was due to a shortage of parts. They opted to keep them available on the more expensive models and builds.
Kinda makes sense...but they were available for Base models
Old 06-07-2024, 12:47 PM
  #34  
470NitroExpress
Track Day
 
470NitroExpress's Avatar
 
Join Date: Aug 2023
Location: Tejas, USA
Posts: 17
Received 15 Likes on 7 Posts
Default

I'm experiencing the same as others. My 2S (quite a few options - heritage interior, manual, sport chrono, etc.) started manufacturing on 6/4 but what just recently changed was the delivery date of 7/19 now to a window of one-month (July 8 - Aug. 6). I'm assuming its going to be closer to Aug. 6th than July 8th.
Old 06-07-2024, 02:43 PM
  #35  
TurboJake
Advanced
 
TurboJake's Avatar
 
Join Date: Apr 2023
Posts: 99
Received 78 Likes on 45 Posts
Default

My heavily optioned C2S had a lock date of June 23rd with delivery estimated August 29th.

Just checked today and things have slipped. Lock is now July 2nd with delivery (September 15 - October 22)

Manual Transmission
Ice Grey Metallic
18 way Black w/ Chalk Stitching
Premium Package
Sun Roof
Aero Kit in High Gloss Black
PDCC
RAS
FAL
Old 06-07-2024, 04:54 PM
  #36  
RatherJaded
Rennlist Member
 
RatherJaded's Avatar
 
Join Date: Jan 2021
Posts: 2,050
Received 1,584 Likes on 896 Posts
Default

Originally Posted by TurboJake
My heavily optioned C2S had a lock date of June 23rd with delivery estimated August 29th.

Just checked today and things have slipped. Lock is now July 2nd with delivery (September 15 - October 22)

Manual Transmission
Ice Grey Metallic
18 way Black w/ Chalk Stitching
Premium Package
Sun Roof
Aero Kit in High Gloss Black
PDCC
RAS
FAL

Option wise I do not think you are all that heavily loaded. I have seen individuals load up a C2S far more than that.
Old 06-08-2024, 03:40 AM
  #37  
TurboJake
Advanced
 
TurboJake's Avatar
 
Join Date: Apr 2023
Posts: 99
Received 78 Likes on 45 Posts
Default

Originally Posted by TUD
Option wise I do not think you are all that heavily loaded. I have seen individuals load up a C2S far more than that.
I guess relatively speaking it’s not “heavily loaded”. There’s quite a few more minor options I didn’t mention but those were the major things I’d assume could cause delay. That said, it sure feels heavy with a base price of $131k and an additional $45k in options haha.

My SA mentioned another customers build was over $200k. Crazy how these things can be specced.
Old 06-08-2024, 05:14 AM
  #38  
Jim Wilke
Racer
 
Jim Wilke's Avatar
 
Join Date: Mar 2020
Posts: 255
Likes: 0
Received 233 Likes on 86 Posts
Default

My 4GTS got to Emden on May 30.
Old 06-09-2024, 09:04 AM
  #39  
doug_999
Rennlist Member
 
doug_999's Avatar
 
Join Date: Sep 2017
Location: Chicago
Posts: 1,225
Received 838 Likes on 429 Posts
Default

Originally Posted by C21ban
Ship left later in the evening on the 30th and vessel tracker shows arrival on at 10pm on the 11th so about normal as long as there are no delays along the rest of the way.
I believe the Siem Confucius was originally due on the 12th, then the 11th, now the 10th!! Never seen this type of change. All while in the Atlantic.
Old 06-09-2024, 09:49 AM
  #40  
C21ban
Instructor
 
C21ban's Avatar
 
Join Date: Mar 2023
Location: Virginia
Posts: 242
Received 250 Likes on 110 Posts
Default

Originally Posted by doug_999
I believe the Siem Confucius was originally due on the 12th, then the 11th, now the 10th!! Never seen this type of change. All while in the Atlantic.
It’s good news for sure and happy they have had smooth sailing. I was a positive thinker on this and booked my flight to Chicago for the 20th so hoping customs and transport keep running smoothly. If not, I can change my reservation so not a big deal. My wait has been much less than many and if all goes well, it will be less than 60 days from the time I found the allocation and got to spec the car after freeze date so if delayed in the interim, I have no complaints - UNLESS, something has gone wrong in shipping/port issues.
Old 06-09-2024, 10:00 AM
  #41  
Ceepe
Rennlist Member
 
Ceepe's Avatar
 
Join Date: Mar 2014
Location: CT
Posts: 1,564
Received 539 Likes on 285 Posts
Default

Originally Posted by sk911
Kinda makes sense...but they were available for Base models
When I was building my T late in the cycle here I checked if PCCB was available on base and they were not. Maybe at a point they were. I have of course seen base carrera's with PCCB's, but something appears to have changed recently. Maybe for the 2024 models?
Old 06-09-2024, 01:45 PM
  #42  
jstap808
Racer
Thread Starter
 
jstap808's Avatar
 
Join Date: Mar 2024
Posts: 304
Received 169 Likes on 88 Posts
Default

Has anyone’s manufacturing process started earlier than stated in the TYD app? I got the starting soon date on June 7 and is set to actually start on June 18, any reason for 11 days of delays to get it going?
Old 06-09-2024, 01:55 PM
  #43  
Dicecal
Instructor
 
Dicecal's Avatar
 
Join Date: Jan 2019
Location: Phoenix, AZ
Posts: 122
Received 58 Likes on 37 Posts
Default

Originally Posted by jstap808
Has anyone’s manufacturing process started earlier than stated in the TYD app? I got the starting soon date on June 7 and is set to actually start on June 18, any reason for 11 days of delays to get it going?
My build locks in one week, so far nothing has moved up..but I’m hoping it does!
Old 06-09-2024, 04:08 PM
  #44  
RatherJaded
Rennlist Member
 
RatherJaded's Avatar
 
Join Date: Jan 2021
Posts: 2,050
Received 1,584 Likes on 896 Posts
Default

Originally Posted by jstap808
Has anyone’s manufacturing process started earlier than stated in the TYD app? I got the starting soon date on June 7 and is set to actually start on June 18, any reason for 11 days of delays to get it going?
Per my previous experience when it hits step three, step four, beginning of production seems to begin 10 to 11 days later. That appears to be the norm.
Old 06-09-2024, 07:06 PM
  #45  
sk911
Rennlist Member
 
sk911's Avatar
 
Join Date: Feb 2007
Location: Arizona
Posts: 270
Likes: 0
Received 109 Likes on 72 Posts
Default

Originally Posted by jstap808
Has anyone’s manufacturing process started earlier than stated in the TYD app? I got the starting soon date on June 7 and is set to actually start on June 18, any reason for 11 days of delays to get it going?
I was thinking the same about my dates...until I saw a video of the Zuffenhausen assembly line.
The assembly line is not like the ones you see in the USA where parts are just pulled out of inventory as the car rolls down the line. The Porshe way is to have every part for that particular car assigned and pre-staged way before the car is even on the assembly line. The engine and trans aren't built and assigned until the shell has been assembled, painted and has a VIN. This all happens when you see the Step-3 "starting soon date". Once you hit the Step-4 "started" date, all the pre-assigned assembled parts matched to the particular VIN, follow the shell down the assembly line. The system delivers the assigned parts staged in the order of the cars assembly to each installers station. This is their "
just-in-sequence method" of assembly...very efficient with no waisted steps. Although a lot of the process has been computerized, there are still a lot of human hours involved in making these cars...for the most part, they are still hand-made like times of old.

Last edited by sk911; 06-09-2024 at 07:08 PM.