GT4RS Deliveries and Production Discussion
#46
Instructor
![Default](https://rennlist.com/forums/images/icons/icon1.gif)
Mine just got delayed to 10/21. Mine started as a July Delivery. Then delayed to September. Now missing the main track day I do each year with this new delivery date. I guess I will have to take the GT3. *Cries about first world problems*
#47
Rennlist Member
![Default](https://rennlist.com/forums/images/icons/icon1.gif)
Mine won’t from 10/21 to 10/28, today it went to 11/14. Expecting more delays to follow.
#48
![Default](https://rennlist.com/forums/images/icons/icon1.gif)
Mine was just delayed for the first time. Granted I’m just starting this game. About a 30 day shift right.
#49
![Default](https://rennlist.com/forums/images/icons/icon1.gif)
With all that shifting around I wonder how many will actually still be delivered in 22 versus sliding into 23.
#50
Rennlist Member
![Default](https://rennlist.com/forums/images/icons/icon1.gif)
V250 on 7/22/22
Mine now is 10/7/22 deliver it was 9/9/22
I think most if not all
US cars are MY23
Mine now is 10/7/22 deliver it was 9/9/22
I think most if not all
US cars are MY23
#51
![Default](https://rennlist.com/forums/images/icons/icon1.gif)
Mine pushed back to 11/14.
#52
![Default](https://rennlist.com/forums/images/icons/icon1.gif)
Looks like my GT4RS dates have been updated on my TYD portal...
- Date the build was created was 7/15/22 (even though my build was submitted on 5/10/22) so I'm assuming my SA called PCNA and moved the allocation so I can get PTS
- Freeze date moved from 9/15/22 to 11/10/22
- Start of production is 12/16/22
- Arrival to dealer is 1/27/23
- Date the build was created was 7/15/22 (even though my build was submitted on 5/10/22) so I'm assuming my SA called PCNA and moved the allocation so I can get PTS
- Freeze date moved from 9/15/22 to 11/10/22
- Start of production is 12/16/22
- Arrival to dealer is 1/27/23
#53
#54
Rennlist Member
![Default](https://rennlist.com/forums/images/icons/icon1.gif)
Mine is a basic car, no wiessach, no deviating stitching, no pts.
Production scheduled: 9/08
Now Production scheduled: 9/16
Production completed was 9/16, now: 9/30
Leipizig Delivery: 10/12 (now questionable)
Production scheduled: 9/08
Now Production scheduled: 9/16
Production completed was 9/16, now: 9/30
Leipizig Delivery: 10/12 (now questionable)
#57
Rennlist Member
![Default](https://rennlist.com/forums/images/icons/icon1.gif)
Looks like my GT4RS dates have been updated on my TYD portal...
- Date the build was created was 7/15/22 (even though my build was submitted on 5/10/22) so I'm assuming my SA called PCNA and moved the allocation so I can get PTS
- Freeze date moved from 9/15/22 to 11/10/22
- Start of production is 12/16/22
- Arrival to dealer is 1/27/23
- Date the build was created was 7/15/22 (even though my build was submitted on 5/10/22) so I'm assuming my SA called PCNA and moved the allocation so I can get PTS
- Freeze date moved from 9/15/22 to 11/10/22
- Start of production is 12/16/22
- Arrival to dealer is 1/27/23
The order created date will change to the last date that someone modified the order, dealer, PCNA or PAG. Glad to hear you got the PTS slot squared away. I was told that if I want any CXX options, I have until the end of July to add them and my freeze date is October 17th. This is due to PTS. Just something to think about if you want to add anything custom.
The following users liked this post:
usctrojanGT3 (07-18-2022)
#59
![Default](https://rennlist.com/forums/images/icons/icon1.gif)
The order created date will change to the last date that someone modified the order, dealer, PCNA or PAG. Glad to hear you got the PTS slot squared away. I was told that if I want any CXX options, I have until the end of July to add them and my freeze date is October 17th. This is due to PTS. Just something to think about if you want to add anything custom.
#60
![Default](https://rennlist.com/forums/images/icons/icon1.gif)
My car went V215 late June (PTS)
Original PTS order was entered in December 2021, so took them exactly 6 months to lock with PTS
So far August build with expected delivery in November.
Original PTS order was entered in December 2021, so took them exactly 6 months to lock with PTS
So far August build with expected delivery in November.