Default Cayenne Production duration

Hi
Does anyone know how long it takes once a cayenne goes to the body shop it takes to produce the car start to finish?
Was curious as i wait for my car to be made.
thank you,
D
Old 03-04-2019, 07:56 PM
  #2  
OCNYPORSCHE
Addict
Rennlist Member
 
OCNYPORSCHE's Avatar
 
Join Date: Jan 2008
Posts: 1,360
Received 139 Likes on 97 Posts
Default

Originally Posted by dspvend
Hi
Does anyone know how long it takes once a cayenne goes to the body shop it takes to produce the car start to finish?
Was curious as i wait for my car to be made.
thank you,
D
Here is my build with dates. Dates are ordered, by enter, estimated, and actual.

V200

Delivery date determined

11/07/2018

V250

Vehicle fixed

11/12/2018

V260

Vehicle entry to body shop (CP 0.0)

11/16/2018 11/30/2018 11/28/2018

V270

Vehicle exit production (CP 7.8)

12/07/2018 12/07/2018 12/03/2018

V300

Vehicle completion (CP 8.0)

12/07/2018 12/07/2018 12/03/2018

V317

Entry factory compound Bratislava

12/07/2018 12/07/2018 12/04/2018

V318

Exit factory compound Bratislava

12/07/2018 12/07/2018 12/04/2018

V331

Entry port Emden

12/21/2018 12/14/2018 12/06/2018

V332

Exit port Emden

01/04/2019 12/14/2018 12/13/2018

U000

Entry port Davisville

01/18/2019


Old 03-04-2019, 08:12 PM
  #3  
dspvend
Instructor
Thread Starter
 
dspvend's Avatar
 
Join Date: Dec 2018
Posts: 188
Likes: 0
Received 15 Likes on 13 Posts
Default

Hi Ocnyporsche -
Thanks for the reply buy can you dumb it down for me? Form the time you ordered your car till the car was delivered was how long a time period?
Old 03-04-2019, 08:33 PM
  #4  
OCNYPORSCHE
Addict
Rennlist Member
 
OCNYPORSCHE's Avatar
 
Join Date: Jan 2008
Posts: 1,360
Received 139 Likes on 97 Posts
Default

I think a good gauge of time is 2 months now. Mine seemed to go into the system on November 12, and I picked it up the second week of January. But alot depends on options now. The early orders vary tremendously. Technically I ordered mine in March 2019. But the Cayenne were not being built back then.
Old 03-05-2019, 04:20 PM
  #5  
dspvend
Instructor
Thread Starter
 
dspvend's Avatar
 
Join Date: Dec 2018
Posts: 188
Likes: 0
Received 15 Likes on 13 Posts
Default

Did your salesman keep you in loop on the building process? How did that work? I feel like I don't wanna hock my sales guy but would love to see periodic updates on where the car is etc. I went to dealer the other day for an update and he said car should fix 4/4/19 so going by your dates car might go to body shop 4/28 hopefully! Dealer said probably will see car sometime in may and the cars are coming in about a month ahead of schedule thought June but..
Old 03-05-2019, 05:09 PM
  #6  
03clyde
Instructor
 
03clyde's Avatar
 
Join Date: Mar 2019
Location: Crossville TN
Posts: 101
Received 12 Likes on 9 Posts
Default

Yesterday, 3/4/19, was the "freeze" date on our "S" with a tentative dealer delivery date of 6/11/19.
Old 03-05-2019, 07:38 PM
  #7  
Jarez Mifkin
Three Wheelin'
 
Jarez Mifkin's Avatar
 
Join Date: Jul 2004
Location: Mount Juliet, TN
Posts: 1,817
Likes: 0
Received 0 Likes on 0 Posts
Default

I did my final build on my CTT on 2/14...froze on 2/25. here's what i've got as of now:

I'm getting it delivered at the PEC in Atlanta, they're telling me late June to early July for delivery.


Tracking
Commission Number: D12738 Model Type: 9YACF1 Object: Order
Event Key Event Name Planned Date Expected Date
Actual Date V200 Delivery date determined
02/14/2019
V250 Vehicle fixed
V260 Vehicle entry to body shop (CP 0.0) 03/29/2019 03/29/2019 V270
Vehicle exit production (CP 7.8) 04/05/2019 04/05/2019
V280 Vehicle entry to CT-assembly (only CT vehicles 04/05/2019 04/05/2019
V290 Vehicle exit of CT-assembly (only CT vehicles) 04/05/2019 04/05/2019
V300 Vehicle completion (CP 8.0) 04/05/2019 04/05/2019
V317 Entry factory compound Bratislava 04/05/2019 04/05/2019
V318 Exit factory compound Bratislava 04/12/2019 04/12/2019
V331 Entry port Emden 04/26/2019 04/26/2019
V332 Exit port Emden 05/17/2019 05/17/2019
U004 Entry port Jacksonville 05/31/2019 05/31/2019
NA10 PDI in
NA19 PDI finished
V810 Release for transport
U005 Exit port Jacksonville 05/31/2019 05/31/2019
O400 Dealer invoiced
V900 Dealer Inventory
V999 Retail Delivery reported
Old 03-05-2019, 08:58 PM
  #8  
03clyde
Instructor
 
03clyde's Avatar
 
Join Date: Mar 2019
Location: Crossville TN
Posts: 101
Received 12 Likes on 9 Posts
Default

[QUOTE=Jarez Mifkin;15682905]I did my final build on my CTT on 2/14...froze on 2/25. here's what i've got as of now:

I'm getting it delivered at the PEC in Atlanta, they're telling me late June to early July for delivery.

Good luck, I had a '19 Macan S slated for about the same time until all S Macans changed to November '19 time frame. I bailed and ordered the Cayenne.