Notices
991 GT3, GT3RS, GT2RS and 911R 2012-2019
Sponsored by:
Sponsored by:

Order Tracking Guide

Thread Tools
 
Search this Thread
 
Old 11-12-2017, 10:46 AM
  #1  
manitou202
Burning Brakes
Thread Starter
 
manitou202's Avatar
 
Join Date: Aug 2014
Location: Manitou Springs, CO
Posts: 1,043
Received 406 Likes on 158 Posts
Default Order Tracking Guide

With all of the questions around tracking an order, and having just been through this, I decided to put together a general guide. Everyone who has been through this please chime in and offer additional info and/or corrections and I’ll update the first post. For many of us it’s an exciting and anxious time so it helps to know a bit of what’s going on.

Your dealer should be able to provide you with the status of you ordered based on the Porsche order Tracking system. Below is an example. Remember that many of these dates will not be populated until you build has reached certain steps in the process. For each step there are also three dates. Planned, expected, and actual. Planned is the original build schedule. Expected gets updated as the car moves through the process and changes based on whether it’s ahead or behind. Actual is when that step officially completed.





V070 A vehicle demand request has been submitted to Porsche. This lets Porsche know that your dealer has a customer who wants to order a specific vehicle. This does not mean you have an allocation. This simply lets Porsche know how many potential customers exist. At this point you will not have a build schedule as shown above.

V200 Delivery date determined. Now you have an allocation with an estimated delivery date. This date can easily change through the process due to many outside factors (parts, weather, changes to your order, etc). You should be able to get an estimate build schedule (like the example above) from your dealer at this point.

V170/180 This mean the order is being reviewed by Porsche because of a special request. It could be as simple of specifying the color of your stitching, to Paint to Sample color requests, to full CXX options. This typically comes after V200 if a special request was made when your build was submitted.

V250 Order has locked. You probably can’t make any changes at this point without pulling some strings. Even though the order is locked it can still be a long wait from now until the vehicle actually starts production. Anything from weeks to months. Your build schedule should provide you with estimated timing.

V260 Vehicle has entered the body shop. Now your car has officially started production. However there can still be delays at this point. Everything from parts shortage to changes in shipping schedules could impact your schedule. People have reported cars taking several additional weeks as a worst case.

V300 Your vehicle is complete and is ready to leave the factory. Your vehicle will wait until it is loaded onto a truck and shipped to Port Emden in Germany.

V331 Entry port Emden. Most vehicles traveling outside of Europe will be loaded onto a ship in the German port of Emden. Your vehicle could sit here for days to weeks depending on the shipping schedules.

V332 Exit port Emden. This means your car has been loaded onto a ship and has left port. Prior to your car leaving port you can use the V332 expected date as a way to figure out what ship it might be transported on. See below

Go to this website: http://www.pwl.de/en
On the middle right side of the screen under “Liner Schedules” select trade lane “US West - and East Coast"
Then under select carrier choose “Volkswagen Konzernlogistik Export”

Your web browser will download a PDF file containing the shipping schedule for the next month. Find your expected V332 Exit Port Emden date on your build schedule and then look under the “Expected Loadready Emden” column on the shipping schedule. Find the vessel with the closest load ready date and you can look across that vessel’s row to see the planned shipping schedule. This will give you an idea and when you can expect the ship to arrive at your US port. To figure out which port your car will be unloaded look at the U002 Entry Port event on your build schedule. It will say “Entry Port XXXX”. These schedules can easily change based on weather.





Once you have verified through your dealer that your vehicle has completed V332, they should be able to provide you with the actual ship name. Usually it should be the same based on the Liner Schedule above, but sometimes they will load your vehicle onto a different ship due to other factors. Once you get confirmation which ship your vehicle is on, you can use one of the following website to track the ship.

https://www.vesselfinder.com
Entry your ship name in the search field. These websites will track your ship when they are within about 100 miles of shore. Once the ship has reached the open ocean you will lose tracking. You can pay extra to track in the open ocean by satellite if you want.

https://www.marinetraffic.com/
This site typically provides better updates but is less friendly to use.

The ships will typically anchor offshore for 12-36 hours prior to entering port. Then they typically spend 12-24 hours in port for unloading vehicles. This is normal.

Atlantic crossing typically takes 6-10 days and if your Entry Port is on the West Coast (i.e. San Diego) remember the ship will need to go through the Panama canal which adds additional time.

U002 Entry Port XXXX This is when you car arrives in North America. Once your car is unloaded from the ship it will go through an inspection by Porsche and through customs. This can take anywhere from 24 hours to several weeks. Everything from back logs, to minor vehicle issues, to customs can impact this time. At this point your dealer will not be able to provide any details except when the car has actually left the port on a truck.

U003 Exit Port XXXX Now your car has left port and is on a truck. This can take anywhere from 24 hours to a week to travel from port to your dealer. Most dealers rely on Porsche Corporate to transport the vehicle so as a result your dealer will probably not be able to provide much detail other than the dates in the Porsche system. There is not a way to track your vehicle when it’s on the truck unless your dealer is using their own transportation which is rare.

Once your vehicle arrive at the dealer they will most likely need a couple of days to perform a final vehicle prep and inspection. Most dealers will let you see the car during this process so you can get you first glimpse of the car.
The following 12 users liked this post by manitou202:
355Shawn (02-06-2023), AFis (09-17-2019), faizaan2000 (08-18-2021), halfmonkey (02-26-2021), Jellybean (10-23-2020), JYT (06-09-2021), kayleia (09-21-2019), MidEngnRacer (05-26-2020), mikebrinda (07-08-2022), omar0022 (10-24-2020), Rxpert (03-09-2020), slilley (07-07-2021) and 7 others liked this post. (Show less...)
Old 11-12-2017, 11:30 AM
  #2  
neurotic
Rennlist Member
 
neurotic's Avatar
 
Join Date: Oct 2007
Posts: 3,394
Received 545 Likes on 261 Posts
Default

mucho gracias!
Old 11-12-2017, 11:35 AM
  #3  
signes
Rennlist Member
 
signes's Avatar
 
Join Date: Sep 2014
Location: USA
Posts: 4,219
Received 619 Likes on 407 Posts
Default

Nice work. Sticky this...
Old 11-12-2017, 12:52 PM
  #4  
GT3
Three Wheelin'
 
GT3's Avatar
 
Join Date: Jun 2009
Posts: 1,818
Received 208 Likes on 106 Posts
Default

Thanks for the info.
Old 11-12-2017, 01:17 PM
  #5  
RFGGT3
Burning Brakes
 
RFGGT3's Avatar
 
Join Date: Oct 2014
Location: Longboat Key, FL
Posts: 1,047
Received 12 Likes on 9 Posts
Default

Thank you; hoping to catch a ride on the Viking
Bravery coming to Jacksonville 12/4. Been in Emden since 11/10.
Old 11-12-2017, 01:49 PM
  #6  
djcxxx
Three Wheelin'
 
djcxxx's Avatar
 
Join Date: Jun 2005
Location: Florida
Posts: 1,960
Received 348 Likes on 176 Posts
Default

You covered it very well. A sticky would be appropriate.
Old 11-12-2017, 01:52 PM
  #7  
Chris88
Burning Brakes
 
Chris88's Avatar
 
Join Date: Nov 2013
Location: Bay Area
Posts: 816
Received 222 Likes on 125 Posts
Default

Thanks for this great, timely information. My car arrived in Emden on Friday, so am anxious to see what ship it will be on.

2018 White GT3 Touring
Old 11-12-2017, 07:27 PM
  #8  
mrneddles
Instructor
 
mrneddles's Avatar
 
Join Date: Apr 2017
Posts: 111
Likes: 0
Received 21 Likes on 10 Posts
Default

Originally Posted by djcxxx
You covered it very well. A sticky would be appropriate.
Across all the new model discussion boards.
Old 11-13-2017, 12:21 AM
  #9  
DutchGT3
Intermediate
 
DutchGT3's Avatar
 
Join Date: Oct 2017
Location: SF Bay Area
Posts: 34
Likes: 0
Received 0 Likes on 0 Posts
Default

Thanks for putting this together. I had figured most of this out by browsing the different threads, but having it in a single place is really helpful. One thing I haven't been able to figure out is whether there is a heads-up that your order is about to go to V250? I've been in V200 since early September with an April '18 delivery estimate. As a lot of others on this forum I'm still going back and forth in my mind on what options to go with. Since estimated delivery is still many months away I keep telling myself I have plenty of time to decide. Maybe I'm wrong. Is there a typical period (n weeks) between delivery date and when an order goes to V250? If not, does the factory give any warning to the dealer that it is about to be converted to V250?
Old 11-13-2017, 08:49 AM
  #10  
manitou202
Burning Brakes
Thread Starter
 
manitou202's Avatar
 
Join Date: Aug 2014
Location: Manitou Springs, CO
Posts: 1,043
Received 406 Likes on 158 Posts
Default

It seems orders go to V250 when it’s about a month out from starting production. My guess is at that point they are actually ordering parts and need to lock the order.

Can anyone else confirm?
Old 11-13-2017, 09:58 AM
  #11  
mclarenmaniac
Rennlist Member
 
mclarenmaniac's Avatar
 
Join Date: Oct 2015
Posts: 671
Received 256 Likes on 113 Posts
Default

Thanks much for answering my question on another thread and putting together this useful info for all of us
Old 11-13-2017, 10:08 AM
  #12  
mrhamamg
Racer
 
mrhamamg's Avatar
 
Join Date: Aug 2013
Location: USA
Posts: 412
Received 35 Likes on 23 Posts
Default

Originally Posted by manitou202
It seems orders go to V250 when it’s about a month out from starting production. My guess is at that point they are actually ordering parts and need to lock the order.

Can anyone else confirm?
Don't think there is a general rule for this

Mine hit V200 9/14
V250 9/20
V260 10/4
V300 completed 10/10
Old 11-14-2017, 11:43 PM
  #13  
evilfij
SJW, a Carin' kinda guy
Rennlist Member
 
evilfij's Avatar
 
Join Date: Apr 2008
Location: On the internet
Posts: 6,786
Received 621 Likes on 433 Posts
Default

Is there a V210?
Old 11-15-2017, 01:40 AM
  #14  
Mech33
Nordschleife Master
 
Mech33's Avatar
 
Join Date: Oct 2014
Posts: 5,344
Received 606 Likes on 371 Posts
Default

Originally Posted by evilfij
Is there a V210?
My .1 GT3 was at V210 status at one point. And clearly there is a V215 as well since the PTS cars are going that way.
Old 11-15-2017, 01:46 AM
  #15  
evilfij
SJW, a Carin' kinda guy
Rennlist Member
 
evilfij's Avatar
 
Join Date: Apr 2008
Location: On the internet
Posts: 6,786
Received 621 Likes on 433 Posts
Default

I am supposedly V210 ....


Quick Reply: Order Tracking Guide



All times are GMT -3. The time now is 07:22 AM.