Notices
924/931/944/951/968 Forum Porsche 924, 924S, 931, 944, 944S, 944S2, 951, and 968 discussion, how-to guides, and technical help. (1976-1995)
Sponsored by:
Sponsored by:

I was just cleaning

Thread Tools
 
Search this Thread
 
Old 05-24-2014 | 08:41 PM
  #1  
mytrplseven's Avatar
mytrplseven
Thread Starter
Drifting
 
Joined: Aug 2010
Posts: 2,654
Likes: 20
From: Orlando area
Default I was just cleaning

I was just cleaning the interior and that's all I remember. Actually, I found a virgin instrument panel at a swap meet and decided to get rid of the old crappy one. Rebuilt the climate control panel and cleaned up some wiring underneath while I was in there. Tomorrow I put it all back together.
Attached Images  
Old 05-24-2014 | 09:08 PM
  #2  
Last Lemming's Avatar
Last Lemming
Burning Brakes
 
Joined: Jul 2013
Posts: 789
Likes: 11
From: Lafayette Louisiana
Default

Shouldn't take much more than about 20, 30 minutes!
Old 05-24-2014 | 09:40 PM
  #3  
plumbum's Avatar
plumbum
Burning Brakes
 
Joined: Jul 2006
Posts: 1,150
Likes: 7
From: Ottawa, Canada
Default

I had my 951 dash re covered...my current 944 could use the same but I am holding out due to a picture I have that is very similar to yours haha

That being said it looks so good after!
Old 05-24-2014 | 09:41 PM
  #4  
plumbum's Avatar
plumbum
Burning Brakes
 
Joined: Jul 2006
Posts: 1,150
Likes: 7
From: Ottawa, Canada
Default

I had my 951 dash re covered...my current 944 could use the same but I am holding out due to a picture I have that is very similar to yours haha

That being said it looks so good after!
Old 05-24-2014 | 09:44 PM
  #5  
plumbum's Avatar
plumbum
Burning Brakes
 
Joined: Jul 2006
Posts: 1,150
Likes: 7
From: Ottawa, Canada
Default

Sorry not sure how it double posted...
Old 05-25-2014 | 11:34 AM
  #6  
Dougs951's Avatar
Dougs951
Race Car
 
Joined: Jul 2008
Posts: 3,792
Likes: 5
From: Southern MD
Default

For anyone else looking at this, pulling a dash to do wiring work is actually pretty easy, also check those grounds while its out!!
Old 05-25-2014 | 09:19 PM
  #7  
mytrplseven's Avatar
mytrplseven
Thread Starter
Drifting
 
Joined: Aug 2010
Posts: 2,654
Likes: 20
From: Orlando area
Default finished

While I was in there, rebuilt the climate control box (lots of soldering), checked grounds, cleaned up the wire spaghetti mess and now it's done. Everything works and no extra parts left over.
Attached Images  
Old 05-25-2014 | 10:12 PM
  #8  
fejjj's Avatar
fejjj
Rennlist Member
 
Joined: Sep 2010
Posts: 2,360
Likes: 79
Default

Awesome job Man!

What is your estimate of total time spent?
Old 05-26-2014 | 11:31 AM
  #9  
mytrplseven's Avatar
mytrplseven
Thread Starter
Drifting
 
Joined: Aug 2010
Posts: 2,654
Likes: 20
From: Orlando area
Default

Since I was watching some auto racing in the AM's it took two 1/2 days. Problem was, it was 94 degrees in the garage. Lots of Gatorade. Since the glove box was light beige I had to spray paint it with vinyl spray paint. It works.



Quick Reply: I was just cleaning



All times are GMT -3. The time now is 03:02 AM.