Notices
718 GTS 4.0/GT4/GT4RS/Spyder/25th Anniversary Discussions about the 718 version of the GT4RS, GTS 4.0, GT4, Spyder and 25th Anniversary Boxster
Sponsored By:
Sponsored By: Cobb

GT4RS Weissach with painted stripe delay

Thread Tools
 
Search this Thread
 
Old 03-14-2024, 07:25 PM
  #1  
dash267
Rennlist Member
Thread Starter
 
dash267's Avatar
 
Join Date: Nov 2021
Posts: 142
Received 90 Likes on 47 Posts
Default GT4RS Weissach with painted stripe delay

I was curious to see if anyone has recently taken delivery of, or has a car ready to be shipped from Emden, with the painted stripe on the hood and the Weissach Package.I’m highly considering the WP + striped hood, but if it takes 3-4 months extra for the hood and wing to be painted, I will happily save $15k and go with the non-WP option. Personally, I'm not a huge fan of an exposed carbon hood, so it’s either no WP or WP with a painted stripe on the hood.

Would love to know about any delays you experienced if you've recently received your car (no CXX, selectable from the configurator). Thank you in advance!
Old 03-15-2024, 12:21 AM
  #2  
Mike981S
Pro
 
Mike981S's Avatar
 
Join Date: Jan 2015
Location: Pacific Northwest
Posts: 570
Received 448 Likes on 223 Posts
Default

My GT4RS just finished production this week (no CXX options). PTS which requires WP and i added the stripe to the order. The car was almost 3 months in production, but i have no evidence that it was either the WP or the striped hood causing the delay since other cars also encountered delays.
I think the question for you is whether the WP gives you personally enough for the amount of money you spend. Predicting the production duration, given all the issues with logistics, supply chain issues, wars in Europe and the Arabic peninsula, the wrong chip issue is like reading tea leaves....
The following users liked this post:
dash267 (03-16-2024)
Old 03-15-2024, 12:46 AM
  #3  
Alan C.
Rennlist Member
 
Alan C.'s Avatar
 
Join Date: Jun 2001
Location: Ohio
Posts: 9,462
Received 1,047 Likes on 539 Posts
Default

I have a WP 4RS with stripe due in Baltimore Saturday. No CXX and no delays. Yet🤣
The following users liked this post:
dash267 (03-16-2024)
Old 03-15-2024, 02:09 AM
  #4  
Red718GTS
Advanced
 
Red718GTS's Avatar
 
Join Date: May 2022
Location: Northwest Arkansas
Posts: 91
Received 92 Likes on 42 Posts
Default

I’m not recent but can confirm delay was real. Got my production shot on July 6th in TYD. Car left the port in late Oct. I love the stripe. Not as much carbon and helps differentiate from the GT4s
The following users liked this post:
dash267 (03-16-2024)
Old 03-15-2024, 05:52 AM
  #5  
Prime
Rennlist Member
 
Prime's Avatar
 
Join Date: Feb 2022
Posts: 303
Received 188 Likes on 97 Posts
Default

My 4RS PTS with hood stripe started production a couple days ago.

I will keep updated as to when It finishes but I'm not expecting any delays. Estimated build time is 3 weeks at the moment.

The following 2 users liked this post by Prime:
Airbag997 (03-15-2024), dash267 (03-16-2024)
Old 03-15-2024, 09:35 PM
  #6  
scottmesenbrink
Advanced
 
scottmesenbrink's Avatar
 
Join Date: Aug 2011
Location: Earth
Posts: 85
Received 106 Likes on 45 Posts
Default

My WP PTS with stripe car started production 12/20/2023 and was scheduled to finish production 1/19/2024. I’ve had multiple notices of delay and Monday I was informed that instead of 3/8 it is now 3/22 for production complete, so I’m late over two months and counting…..I’m not sure what the holdup is but there are a number of us on the forum with similar original dates as mine that are all now showing 3/22. I’m aware of all the potential holdups so it could be any of them or all of them. Who knows, but I would still order the car the same way. It will be worth it.
The following 3 users liked this post by scottmesenbrink:
7184RS (04-06-2024), dash267 (03-16-2024), Mike981S (03-16-2024)
Old 03-15-2024, 09:56 PM
  #7  
Craig67
Rennlist Member
 
Craig67's Avatar
 
Join Date: May 2011
Posts: 348
Received 52 Likes on 24 Posts
Default

My Non-PTS Weissach with the stripe was built in a month….12/20-1/20/2024 and shipped to the US.
The following users liked this post:
dash267 (03-16-2024)
Old 03-15-2024, 10:53 PM
  #8  
Arcades
Intermediate
 
Arcades's Avatar
 
Join Date: Sep 2023
Location: SoCal
Posts: 38
Received 27 Likes on 15 Posts
Default

I am surprised the owners who had their cars delivered hasn't responded here yet lol.

I took delivery of my car mid February, 2024. Hood/Wing Stripe (former CXX) with Arctic Grey when I failed to get PTS for my allocation.

Car started production end of June, 2023. Car finished on the assembly line middle of July, 2023 but car didn't finish production until December 4th, 2023. I knew from the 4RS delivery thread there were (on RL anyway) 5 people in front of me and all were in the same position with CXX hood/wing stripe. Due to our production numbers, I known I was last in that line so, when they (5 of them) finished in front of me, then my car was done. I did not take delivery until middle of February, 2024. It sat at port Emden for I think close to a month.

So... unless Porsche figured out a way to speed up the process, you may or may not wait that long.

Last edited by Arcades; 03-15-2024 at 11:08 PM.
The following users liked this post:
dash267 (03-16-2024)
Old 03-16-2024, 08:59 PM
  #9  
dash267
Rennlist Member
Thread Starter
 
dash267's Avatar
 
Join Date: Nov 2021
Posts: 142
Received 90 Likes on 47 Posts
Default

I decided not to do the stripe, didn’t want to risk potential 2-3 months delay as there are some track and car events I want to attend in August-September time frame and my ETA is already Late June Early July. That being said, thank you everyone for the feedback!

Super excited to take the delivery of the car in a few months.
Old 03-17-2024, 09:14 AM
  #10  
168glhs1986
Rennlist Member
 
168glhs1986's Avatar
 
Join Date: Sep 2013
Location: Potomac, Md
Posts: 1,807
Received 1,448 Likes on 696 Posts
Default

I wouldn't try to predict deliveries for track days. Been there done that. Just order the car you want an wait for it. This will make you happier in the long run.
The following 3 users liked this post by 168glhs1986:
*991* (03-19-2024), Alan C. (03-19-2024), Mike981S (03-17-2024)
Old 03-17-2024, 09:42 AM
  #11  
monochrom3
Rennlist Member
 
monochrom3's Avatar
 
Join Date: Oct 2012
Location: Austin
Posts: 730
Received 238 Likes on 97 Posts
Default

Related, my 3RS didn’t have the painted hood but just got this from my wrap shop this weekend on my car.
Attached Files
The following users liked this post:
RDCR (04-06-2024)
Old 03-19-2024, 01:18 AM
  #12  
Thinker23
Racer
 
Thinker23's Avatar
 
Join Date: Jul 2016
Location: Bay Area
Posts: 258
Received 77 Likes on 44 Posts
Default

I got the WP with painted stripe on the hood and wing. Delivery got delayed by 3 months. It’s worth the wait. Just stay the course.
The following users liked this post:
Airbag997 (03-19-2024)
Old 04-06-2024, 05:26 AM
  #13  
Prime
Rennlist Member
 
Prime's Avatar
 
Join Date: Feb 2022
Posts: 303
Received 188 Likes on 97 Posts
Default

Update:
My 4RS PTS started production 12 March and finished 27 March.
It was released for transport at the port 4 April.

So no delay currently for cars made in Osnabruk it seems.

Pretty fast turn around really...

Prime -

Old 04-06-2024, 08:28 AM
  #14  
7184RS
Instructor
 
7184RS's Avatar
 
Join Date: Mar 2024
Posts: 173
Received 63 Likes on 42 Posts
Default

Originally Posted by Prime
Update:
My 4RS PTS started production 12 March and finished 27 March.
It was released for transport at the port 4 April.

So no delay currently for cars made in Osnabruk it seems.

Pretty fast turn around really...

Prime -
That is not the norm, there's quite a few RS that got at least around 2 months delay after production finished, even when they started production before yours (no PTS and no stripe, just WS)
Old 04-06-2024, 11:31 AM
  #15  
*991*
Rennlist Member
 
*991*'s Avatar
 
Join Date: May 2017
Location: Connecticut
Posts: 676
Received 222 Likes on 116 Posts
Default

I added the stripe build was delayed by 5 weeks at first, but last week TYD had updated and my build returned back to a week earlier than before the stripe so draw your own conclusions


Quick Reply: GT4RS Weissach with painted stripe delay



All times are GMT -3. The time now is 12:04 PM.