Road Work..... Heads Up
#1
Rennlist Member
Thread Starter
Road Work..... Heads Up
Repaving work going on 401 Westbound collector lanes from DVP to Leslie.
All lanes are in the process of being re-finished.
The top layer pavement has been removed and the surface is grooved and rough with pebbles and sand and crap being flung up.
Avoid if you can if you value your paint / windshield etc.
Just a friendly heads up.
(Might be a good idea to keep everyone aware of similar
road work areas potentially harmful to our precious babies)
Cheers
All lanes are in the process of being re-finished.
The top layer pavement has been removed and the surface is grooved and rough with pebbles and sand and crap being flung up.
Avoid if you can if you value your paint / windshield etc.
Just a friendly heads up.
(Might be a good idea to keep everyone aware of similar
road work areas potentially harmful to our precious babies)
Cheers
#5
Captain Obvious
Super User
Super User
The 401 west of Milton is getting a shave and pave too but this contractor cleans up after the grinding that there is nothing left for the traffic to fling up. I would call MTO and let them know the substandard wotk the contractor is doing at your end.