Pictures from Mosport Today
#16
Nordschleife Master
#17
Nordschleife Master
#18
Addict
Lifetime Rennlist
Member
Lifetime Rennlist
Member
#20
Rennlist Member
#22
If they were going to resurface the whole track, I think they would be better to close it for the month of July. On that basis, I don't see them doing it in this coming year.
Personally, I just have my fingers crossed for flat pavement in the paddock and better washrooms with drinking water!
Personally, I just have my fingers crossed for flat pavement in the paddock and better washrooms with drinking water!
#23
Three Wheelin'
Join Date: Jan 2010
Location: Durham Region/GTA East, Canada
Posts: 1,380
Likes: 0
Received 1 Like
on
1 Post
Washroom for frequent shorts changing after diving in through turn 3. Ever watch the vintage racers with the mini's? They don't even lift off the throttle! Talk about commitment. It is right up there with a pigs commitment to breakfast !
#24
Drifting
I have a few friends that are pretty close to the track management and a repave is not in the cards at this time. It's more around access to the pits, hospitality buildings and cleaning up some safety issues. That's still a huge step up for Mosport and will start to close the gap to fantastic tracks like Calabogie.
#26
Pocket Sand
Rennlist Member
Rennlist Member
Join Date: Jul 2004
Location: Ask Rusty Shackleford.
Posts: 7,649
Likes: 0
Received 0 Likes
on
0 Posts
#29
Drifting
Exactly.
They cut through on an angle right about where the old tunnel was and now the new Mosport entrance will be just past the little registration building on the outside of the track and between the old entrance (gate 3). The entrance that everyone was used to in the past is closed up now. There is a road being built straight across the field that splits left and up over the back of corner 10 to where the new admin building will be and the other part of the split goes slightly to the right and under the track where the old tunnel was. The difference is that the new tunnel is two lanes and high enough for rigs to fit through. The new road follows that natural valley that will run around to the lower paddock.
They cut through on an angle right about where the old tunnel was and now the new Mosport entrance will be just past the little registration building on the outside of the track and between the old entrance (gate 3). The entrance that everyone was used to in the past is closed up now. There is a road being built straight across the field that splits left and up over the back of corner 10 to where the new admin building will be and the other part of the split goes slightly to the right and under the track where the old tunnel was. The difference is that the new tunnel is two lanes and high enough for rigs to fit through. The new road follows that natural valley that will run around to the lower paddock.