Notices
997 GT2/GT3 Forum 2005-2012
Sponsored by:
Sponsored by: Porsche North Houston

How long does it take to build one of our cars (GT3)

Thread Tools
 
Search this Thread
 
Old 05-09-2007, 01:04 PM
  #1  
unionjack
Intermediate
Thread Starter
 
unionjack's Avatar
 
Join Date: Dec 2006
Location: CT
Posts: 46
Likes: 0
Received 0 Likes on 0 Posts
Default How long does it take to build one of our cars (GT3)

Just had a call from my dealer who said my car went into production on the 1st.
Old 05-09-2007, 02:08 PM
  #2  
n2cars
Three Wheelin'
 
n2cars's Avatar
 
Join Date: Feb 2007
Location: Colorado/California
Posts: 1,463
Received 237 Likes on 135 Posts
Default

I want to know too. I thought it was only 2-3 days to put one together. Your car should be done by now?
Old 05-09-2007, 03:00 PM
  #3  
TT Surgeon
Race Director
 
TT Surgeon's Avatar
 
Join Date: Oct 2004
Location: KC ex pat marooned in NY
Posts: 13,005
Likes: 0
Received 17 Likes on 17 Posts
Default

3-5 days on turbos and GT3's, 2-3 on other 997 types.
Old 05-09-2007, 05:40 PM
  #4  
normank
Racer
 
normank's Avatar
 
Join Date: Jan 2007
Location: South Florida
Posts: 412
Likes: 0
Received 0 Likes on 0 Posts
Default

I was told 1 day , not including deviations. Was true for my car.
Old 05-10-2007, 02:40 PM
  #5  
Edgy01
Poseur
Rennlist Member
 
Edgy01's Avatar
 
Join Date: Nov 2005
Location: Santa Barbara, CA
Posts: 17,699
Received 235 Likes on 128 Posts
Default

The regular 997s are assembled in 55 minutes from a painted shell. 997 engines are a 1 hr 25 minute assembly. Adjust these numbers for a GT.



Quick Reply: How long does it take to build one of our cars (GT3)



All times are GMT -3. The time now is 06:00 AM.