Project Shrek - verry cold
#1
Rennlist Member
Thread Starter
Project Shrek - verry cold
Today was 20 below freezing, with everything encased in snow and ice. Did not prevent my mechanic from making some progress on the car.
Trunk is *almost* there. A few bolts, covers and it is done.
In the back, turbine and alternator are in. Need new belts.
The clutch receiving cyclinder was seized solid, and a new one is already here to replace the removed one. I also noticed the springs are Eibach.
The car should start this week, then it is brakes, bodywork and "expertise" (road test by the state, very thorough and strict).
I can already hear and smell it
Trunk is *almost* there. A few bolts, covers and it is done.
In the back, turbine and alternator are in. Need new belts.
The clutch receiving cyclinder was seized solid, and a new one is already here to replace the removed one. I also noticed the springs are Eibach.
The car should start this week, then it is brakes, bodywork and "expertise" (road test by the state, very thorough and strict).
I can already hear and smell it
Last edited by GeorgeK; 12-11-2014 at 02:44 AM.
#5
Rennlist Member
Thread Starter
...And spider rack, and pine-needle holders, and mud closets, and dust holders, and dirt caches, and grime reserves....
I'm going to have a field day (or three) when this car finally gets in my hands and in my garage