Long project about to start
#1
UAE Rennlist Ambassador
Rennlist Member
Rennlist Member
Thread Starter
Long project about to start
Recieved our warehouse, and just moved the car in there.
Will be getting a compressor, tools, and so on....
Plans for now, is to get the car to be streetable. Since the car will leave Dubai and end up with me in Germany, it needs a CAT, and new laws in Dubai state all cars, new or old, must be equipped with a CAT. I got my eyes on the SFR full exhaust system...expensive, but you know how it goes....do it once and do it right.
After the exhaust, i still have the engine leaning towards to drivers side more, ever since i replaced the engine mounts, that needs to be checked.
After those two, the car is running great, it has been sitting for over a year without being started, but it has tons of new parts and seals in there. It does not require a rebuild (lowest compression i got was 141psi cold engine).
This will be a long project, because of time. I moved to Germany, and come back to Dubai once every 3-4 months for 2 week or so. So you can see, how slow the project will go.
Will keep this thread alive with pics, questions and other stuff!!!!!
Will be getting a compressor, tools, and so on....
Plans for now, is to get the car to be streetable. Since the car will leave Dubai and end up with me in Germany, it needs a CAT, and new laws in Dubai state all cars, new or old, must be equipped with a CAT. I got my eyes on the SFR full exhaust system...expensive, but you know how it goes....do it once and do it right.
After the exhaust, i still have the engine leaning towards to drivers side more, ever since i replaced the engine mounts, that needs to be checked.
After those two, the car is running great, it has been sitting for over a year without being started, but it has tons of new parts and seals in there. It does not require a rebuild (lowest compression i got was 141psi cold engine).
This will be a long project, because of time. I moved to Germany, and come back to Dubai once every 3-4 months for 2 week or so. So you can see, how slow the project will go.
Will keep this thread alive with pics, questions and other stuff!!!!!