944 to 968 Conversion is a go!
#1
Racer
Thread Starter
944 to 968 Conversion is a go!
Since the Callaway project is essentially finished, time for a new way to spend time
1994 968 engine is on its way from Germany and should be here next week. It will be installed into a 1987 944S that decided to throw a rod through the side of the block. We had already picked up a complete 944S engine to replace it with when we decided to go with the 968 conversion, so that motor is now available for $1000 if anyone is interested.
I'll let everyone know how it turns out in a couple of weeks
Todd <img src="graemlins/beerchug.gif" border="0" alt="[cheers]" />
1994 968 engine is on its way from Germany and should be here next week. It will be installed into a 1987 944S that decided to throw a rod through the side of the block. We had already picked up a complete 944S engine to replace it with when we decided to go with the 968 conversion, so that motor is now available for $1000 if anyone is interested.
I'll let everyone know how it turns out in a couple of weeks
Todd <img src="graemlins/beerchug.gif" border="0" alt="[cheers]" />
#3
Racer
Thread Starter
The 968 engine was purchased complete with clutch, bellhousing and torque tube so that should solve the issue I believe. We will be using the stock 944S trans.
Todd
Todd
#4
Rennlist Member
Join Date: Oct 2002
Location: Florida Space Coast
Posts: 95
Likes: 0
Received 0 Likes
on
0 Posts
Hey Todd,
I live on Cape Cod and am wondering if I could come up and take a look at what you are doing. I am thinking of doing the same conversion.
Thanks,
Jeff
I live on Cape Cod and am wondering if I could come up and take a look at what you are doing. I am thinking of doing the same conversion.
Thanks,
Jeff
#5
Racer
Thread Starter
Jeff
Sure just drop me an email and I'll let you know when things get underway. If everything gets here from Germany on schedule we should start around November 1st
My email is holyoak@brandeis.edu
Todd
Sure just drop me an email and I'll let you know when things get underway. If everything gets here from Germany on schedule we should start around November 1st
My email is holyoak@brandeis.edu
Todd