Test
1 Attachment(s)
Pic test
|
You passed
|
|
|
test
SAI Flush First step was remove check valve with a cold chisel. Next was cut off the threaded portion and braze an air fitting. |
All times are GMT -3. The time now is 05:24 AM. |
© 2024 MH Sub I, LLC dba Internet Brands