What is the difference between the "planned" date and the "expected" date?
|
Originally Posted by Hurricane
(Post 14656435)
What is the difference between the "planned" date and the "expected" date?
|
JR1946
991.2 GTS Coupe Date Ordered: 10/30/17 Suggested Build Date: 12/12/17 Actual Build Date: 12/12/17 Completion: 12/??/17 On Vessel: 01/24/18 Delivery to Customer: 02/26/18 |
PLom
991.2 C2 Date Ordered: 7/20/17 Suggested Build Date: 10/27/17 Actual Build Date: 11/21/17 Completion: 11/23/17 On Vessel: 12/08/17 Delivery to Customer: 01/19/18 |
I am hearing that a 991 Targa 4S could take up to 9 months to build if ordered today. Does that sound right?
|
Originally Posted by Vjgtrybno1
(Post 15143727)
I am hearing that a 991 Targa 4S could take up to 9 months to build if ordered today. Does that sound right?
|
Interesting how no deliveries have been completed since March of this year ... is there a reason that everyone has stopped contributing their build and delivery results here?
|
Lots of deliveries, but all being reported in this thread
|
Yes, but this thread was meant to be a place to simply view the overall start to finish milestones results for each ... a way for others to get an quick idea of the trends without wading through all of the exciting story-lines and chatter of the other thread :) ... I'll be adding my final stats here within a week (hopefully).
|
I'll do the same - hoping for delivery right after Xmas, but we'll see if she makes the boat :)
|
OK, here is my version of a summary now :)
Model: 2019 991.2 C2S 05/04/2018 - Date Ordered (V070) 06/28/2018 - Date Order Accepted (V200) 10/08/2018 - Vehicle Fixed Date (V250) 10/12/2018 - Scheduled Build Date ___10/19/2018 - Revised Scheduled Build Date following a 07/31/2018 build change adding 425 and changing 9VL to 9VJ 10/12/2018 - Actual Build Date (V260)10/19/2018 - Completion (V300) 10/26/2018 - Arrived Emden ___11/16/2018 - Estimated Depart Emden 11/03/2018 - Depart Emden12/05/2018 - Arrived US Port (Benicia) 12/13/2019 - Delivery to Customer Notes: Ordered placed before 2019 allocations were set with dealer as no more 2018 allocations were to be had and once the initial 2019 allocations were determined in June, earliest C2S allocation available to my dealer (Porsche Beaverton in Oregon) was in Oct. Also note that the factory has a traditional Summer month-long shutdown which was a factor in not being able to get an earlier build schedule. |
Model: 991 Date Ordered:11/05/18 Suggested Build Date: 11/23/18 Actual Build Date: 11/21/19 Completion: 11/23/18 On Vessel: 11/30/18 Davisville Port Arrival: 12/13/18 |
Lindsleyws
991.2 C2S Date Ordered: 12/18/18 Scheduled Build Date: 3/29/19 Completion: 4/5/19 On Vessel: 4/26/19 Delivery to Customer: 5/31/19 Night Blue, Black/luxor beige, Sport, Premium pkg plus, Burmester, RS Spyder Design wheels |
Username: ScreaminBejesus 02/16/2019: Bremerhaven, DEModel: 991.2 GTS Coupe Ordered: 12/21/2018 (V070) Ordered Accepted: 12/29/2018 (V200) Order Locked: 01/21/2019 (V250) Scheduled Entry to Body Shop: 02/08/2019 (V260) Actual Entry to Body Shop: 01/31/19 Scheduled Vehicle Completion: 02/08/2019 (V300) Actual Vehicle Completion: 02/06/2019 Scheduled Entry Port Emden: 02/15/2019 (V331) Actual Entry Port Emden: 02/07/2019 Scheduled Exit Port Emden: 03/08/2019 (V332) Actual Exit Port Emden: 02/14/2019 (Glovis Cosmos) 03/06/2019: Baltimore, MD 03/09/2019: Brunswick, FL 03/14/2019: Veracruz, MX 03/19/2019: Panama Canal 03/26/2019: Lazaro Cardenas, MX 04/01/2019: San Diego, CA 04/03/2019: Benicia, CA Scheduled Entry Port Benicia: 04/05/2019 (U014) Expected Entry Port Benicia: 03/29/2019 Actual Entry Port Benicia: 04/03/2019 Scheduled Exit Port Benicia: 04/19/2019 Expected Exit Port Benicia: 04/05/2019 Actual Exit Port Benicia: 04/09/2019 Scheduled Dealer Inventory: 04/26/2019 Expected Dealer Inventory: Actual Dealer Inventory: 04/11/2019 Actual Delivery: 04/12/2019! |
Model: 2019 991.2 GTS Coupe
Ordered: August 1, 2018 V200 Delivery date determined: 10/4/2018 (probably delayed because of August Holiday) V250 Vehicle Fixed: 10/19/18 Planned Date, 10/12/2018 Expected Date, 10/11/2018 Actual Date V260 Entry to Body Shop: 10/26/18 Planned Date, 10/26/18 Expected Date, 10/23/18 Actual Date V270 Exit Production: 11/2/18 Planned Date, 10/26/18 Expected Date, 10/28/18 Actual Date V300 Vehicle Completion: 11/2/18 Planned Date, 10/26/18 Expected Date, 10/28/18 Actual Date V331 Entry Port Emden: 11/9/18 Planned Date, 11/2/18 Expected Date, 11/1/18 Actual Date V332 Exit Port Emden: 11/30/18 Planned Date, 11/23/18 Expected Date, 11/24/18 Actual Date U006 Entry Port San Diego: 12/28/18 Planned Date, 12/21/18 Expected Date, 12/26/18 Actual Date (Ship stopped at Port Hueneme first to dump BMW's) Delivered to Dealer 12/27/18; Ready for Delivery 12/28/18; Delivered 12/30 (I was out of town or would have taken delivery 12/28) GT Silver, PDK, PDCC w/PASM, LCA, RAS, FAL, Delete Model Logo and Decal on Doors, Bose, 18-Ways, Sunroof delete, Premium Package Plus |