December 2018 CA cars schedule delay / port of entry.
Do cars destined for California dealers always go through ports of San Diego / Benicia? I have an RS that was completed 12.07.18 and was scheduled to leave Emden 01.04.19 but looks to be there still. Been checking with PCNA, no updates. No vessel to the west coast in the past few weeks. First option is Grand Venus, leaving on January 15th Surprised that Porsche doesn’t have better traceability in place. Anyone else looking on the same boat? :) |
I will probably be on the same one too. Was scheduled to leave 1-11. ETA at dealership around 2-22.
|
Any other cars headed to California made in December shipping this month got vessel info confirmation?
|
I’m on Grand Venus. Mine was built January 10th and left Edmen port for San Diego on January 16th. (Confirmed by PCNA) Expected port arrival is February 13th. PECLA delivery. |
Just got confirmation that RS is on Grand Venus as well.
|
Originally Posted by Dot23RS
(Post 15576390)
I’m on Grand Venus. Mine was built January 10th and left Edmen port for San Diego on January 16th. (Confirmed by PCNA) Expected port arrival is February 13th. PECLA delivery. |
All times are GMT -3. The time now is 08:12 AM. |
© 2024 MH Sub I, LLC dba Internet Brands