.2 GT3 - who's got the longest wait? delivery in 2019?
#32
Sept build, Nov/Dec delivery.
No PTS/CXX options available, no Touring Package available, so basically can only build a basic GT3 with offered colors along with choice of transmission. Received allocation in Nov. 17' and build doesn't lock until June 18'; losing interest in it to be honest as it kind of takes the fun out of things with limited options. Hard to get excited, but Im sure that'll change once it arrives in whatever build it is!
No PTS/CXX options available, no Touring Package available, so basically can only build a basic GT3 with offered colors along with choice of transmission. Received allocation in Nov. 17' and build doesn't lock until June 18'; losing interest in it to be honest as it kind of takes the fun out of things with limited options. Hard to get excited, but Im sure that'll change once it arrives in whatever build it is!
#33
Sept build, Nov/Dec delivery.
No PTS/CXX options available, no Touring Package available, so basically can only build a basic GT3 with offered colors along with choice of transmission. Received allocation in Nov. 17' and build doesn't lock until June 18'; losing interest in it to be honest as it kind of takes the fun out of things with limited options. Hard to get excited, but Im sure that'll change once it arrives in whatever build it is!
No PTS/CXX options available, no Touring Package available, so basically can only build a basic GT3 with offered colors along with choice of transmission. Received allocation in Nov. 17' and build doesn't lock until June 18'; losing interest in it to be honest as it kind of takes the fun out of things with limited options. Hard to get excited, but Im sure that'll change once it arrives in whatever build it is!
#34
Three Wheelin'
Redmonkey, that doesn't sound right... CXX maybe. But no Touring? I know several people with Tourings slated for Sept, Oct build dates. Never heard of them restricting Touring option.
#35
Drifting
My Touring build locks 8/24 for a mid-October completion date. I have spoken with the ED team and I am in the books for ED in Zuffenhausen the week of 10/29. I too am hoping that PTS re-opens. I can't decide on a non-PTS color - boo hoo. I would also consider getting houndstooth seat inserts if that were an option. Going to inquire with the powers that be at Porsche Exclusive.
#37
Apparently the slots are full for Sept. Touring Packages Im being told, there were 'x' number of them per month and Sept. if full - so I got a response of 'no go' on the Touring Package for my allocation. If anyone has heard differently, let me know as thats what Id like to get.
#39
Three Wheelin'
I honestly can't see pts reopening. They are so far behind on it now. My car was a February allocation and I won't see it until September. Just can't see them finally catching up and then reopening it for the last few months of allocations. They need to get all GT3 thru to focus on Gt3rs, speedster and possible a Gt4.2 before moving onto 992
#40
I honestly can't see pts reopening. They are so far behind on it now. My car was a February allocation and I won't see it until September. Just can't see them finally catching up and then reopening it for the last few months of allocations. They need to get all GT3 thru to focus on Gt3rs, speedster and possible a Gt4.2 before moving onto 992
#41
Rennlist Member
From out of the blue an allocation with Jan 25, 2019 delivery date....the beat goes on. Happy New Year !
#44
Rennlist Member
Gave my deposit April 2016, allocation confirmed August 2017 for October 2018 build. January 2019 delivery at Porsche Experience in Los Angeles. Needless to say, it's been a LONG wait. I'm obviously not a VIP customer.