PCNA to delay GT3 Production?
#259
Rennlist Member
latest update, I finally got confirmation of my new ED date (7/30) today from PCNA, still contingent on the paint order being delivered in time for production (was 3/30, now 5/25), but they assured me that the factory claimed the newproduction dates and forecasts are good for planning purposes!
#261
Good News. My GT3T production start date has been moved up from 9/28 to 7/27 (a full two months).
That means I can expect to have it in time for a late September East Coast fall foliage tour!
(instead of a damp drizzly post-Thanksgiving November delivery)
PJ2WLV49
That means I can expect to have it in time for a late September East Coast fall foliage tour!
(instead of a damp drizzly post-Thanksgiving November delivery)
PJ2WLV49
#263
Congrats, but are you PTS? The consensus is that only PTS builds are being delayed, so it’d be more helpful if everyone whose build are being moved up stated whether heir are PTS or not. I don’t see you in Montoya’s Check in PTS Thread...
#265
Got a surprised text from my SA this morning that my GR GT3T entered the port of Emden. The original plan date was 5/18 but entered the port on the 24th of April, 3 weeks ahead of schedule. The original delivery date was 6/29 and the update date is now 6/8. Checked the port at Emden and it is possible that it will be on the Miraculous Ace since the Adriatic Hwy will leave on the 25th. The Miraculous Ace is arriving the port of Emden any hour(s) now. Anyway, both ships will arrived in Davisville on the 7th of May. Basing from my previous deliveries, it may even be here on the week of Thanksgiving. My next call to my SA will be 3 weeks from now and hoping that he will tell me that it is waiting for road transport here in the mid-west.
#266
Rennlist Member
Got a surprised text from my SA this morning that my GR GT3T entered the port of Emden. The original plan date was 5/18 but entered the port on the 24th of April, 3 weeks ahead of schedule. The original delivery date was 6/29 and the update date is now 6/8. Checked the port at Emden and it is possible that it will be on the Miraculous Ace since the Adriatic Hwy will leave on the 25th. The Miraculous Ace is arriving the port of Emden any hour(s) now. Anyway, both ships will arrived in Davisville on the 7th of May. Basing from my previous deliveries, it may even be here on the week of Thanksgiving. My next call to my SA will be 3 weeks from now and hoping that he will tell me that it is waiting for road transport here in the mid-west.
#267
Drifting
Yeah I hope it doesn't take that long to go from port to dealer...