Cat "C" people unite here!
#61
Burning Brakes
Thread Starter
Build update, the good news - dates have not changed! Have moved from V200 to V250 8/1 and is now fixed. Completion (V300) is 9/5 and exit date from Emden scheduled for 9/26. She arrives in Davisville 10/17 with a Halloween dealer delivery date. That's 84 days guys, I can smell the alcantara!
#62
Rennlist Member
I think we'll all see some production movement (forward or delay ) after the factory vacation.
My spec & build remains unchanged for the past 10 days which in itself is a minor miracle!
--------------------
GT Silver Metallic
Leather Interior in Black/Alcantara® with Stitching in Platinum Grey
Extended Range Fuel Tank
Porsche Dynamic Light System (PDLS)
Automatically Dimming Mirrors with Integrated Rain Sensor
Headlight Cleaning System Covers in Exterior Color Exclusive
Porsche Doppelkupplung (PDK)
Front Axle Lift System
20" GT3 Wheels
Luggage Net in Passenger Footwell
Smoking Package
Floor Mats
Adaptive Sport Seats Plus (18-way)
Sound Package Plup
HD Radio Receiver
Porsche Communication Management (PCM) incl. Navigation Module
Online Services
My spec & build remains unchanged for the past 10 days which in itself is a minor miracle!
--------------------
GT Silver Metallic
Leather Interior in Black/Alcantara® with Stitching in Platinum Grey
Extended Range Fuel Tank
Porsche Dynamic Light System (PDLS)
Automatically Dimming Mirrors with Integrated Rain Sensor
Headlight Cleaning System Covers in Exterior Color Exclusive
Porsche Doppelkupplung (PDK)
Front Axle Lift System
20" GT3 Wheels
Luggage Net in Passenger Footwell
Smoking Package
Floor Mats
Adaptive Sport Seats Plus (18-way)
Sound Package Plup
HD Radio Receiver
Porsche Communication Management (PCM) incl. Navigation Module
Online Services
Last edited by Haku; 08-08-2014 at 04:05 PM. Reason: Font change
#63
Instructor
Hey Rob, Perfect timing on your completion date 9/19, Octoberfest starts 9/20 and you remember the old Detriot rumors that the cars that got built before lunch were always better than those built after lunch!!!
#64
Rennlist Member
Build update, the good news - dates have not changed! Have moved from V200 to V250 8/1 and is now fixed. Completion (V300) is 9/5 and exit date from Emden scheduled for 9/26. She arrives in Davisville 10/17 with a Halloween dealer delivery date. That's 84 days guys, I can smell the alcantara!
this is a 2014?
#66
Burning Brakes
Thread Starter
#67
Burning Brakes
Bitched to my dealer about my MY 2014 Nov delivery ( exited production March 20) and he heard back from regional rep the following:
"Latest factory '14 is due to arrive late November but these may be a bit conservative estimates so they could arrive sooner than dates indicated.
Earliest '15 we see is due late September!
Some 2015s in late September- crazy bastards started up the production line in July and gave the early 2015s my engine
I actually get it, but maybe Porsche should send me to Porsche Sport Driving School to ease my pain.
"Latest factory '14 is due to arrive late November but these may be a bit conservative estimates so they could arrive sooner than dates indicated.
Earliest '15 we see is due late September!
Some 2015s in late September- crazy bastards started up the production line in July and gave the early 2015s my engine
I actually get it, but maybe Porsche should send me to Porsche Sport Driving School to ease my pain.
#68
Bitched to my dealer about my MY 2014 Nov delivery ( exited production March 20) and he heard back from regional rep the following:
"Latest factory '14 is due to arrive late November but these may be a bit conservative estimates so they could arrive sooner than dates indicated.
Earliest '15 we see is due late September!
Some 2015s in late September- crazy bastards started up the production line in July and gave the early 2015s my engine
I actually get it, but maybe Porsche should send me to Porsche Sport Driving School to ease my pain.
"Latest factory '14 is due to arrive late November but these may be a bit conservative estimates so they could arrive sooner than dates indicated.
Earliest '15 we see is due late September!
Some 2015s in late September- crazy bastards started up the production line in July and gave the early 2015s my engine
I actually get it, but maybe Porsche should send me to Porsche Sport Driving School to ease my pain.
In any case I was scheduled to exit production the day after you (March 21, 2014), and got bumped to MY 2015, with February delivery now (never entered production AFAIK). So I agree, the whole sequence of production got seriously jumbled. It's really not fair. I'd be happy with a feel-good gesture, something like you suggest. But it's hard to be sure PAG is really paying attention when it comes to these sort of issues for cat C people.
#69
Burning Brakes
No sorry, I am a MY 2014 and my car exited production on March 20 and is in Germany awaiting my engine swap. I posted in Cat C thread to see if any of you guys are actually getting your 2015 cars in September. I am scheduled for Nov 2014 for my MY 2014 delivery to the dealer.
#71
No sorry, I am a MY 2014 and my car exited production on March 20 and is in Germany awaiting my engine swap. I posted in Cat C thread to see if any of you guys are actually getting your 2015 cars in September. I am scheduled for Nov 2014 for my MY 2014 delivery to the dealer.
#73
The issue is split between proximity to 2015s (comp and warranty partially fix that) and delivery in nov when car will just go into storage for winter.
#74
Rennlist Member
It's so strange on the Cat B timing. Mine was supposed to finish late February. I finished mid July and is currently 5 days out of San Diego on the Glovis Composer. My delivery date is approaching here in the next three or so weeks. Seems odd that a car originally scheduled for less than a month after mine will arrive nearly three months later.
Yes Cat B do get compensation - $2000 per month, extended warranty and a loaner (I got a brand new Carrera S)
Yes Cat B do get compensation - $2000 per month, extended warranty and a loaner (I got a brand new Carrera S)
#75
Burning Brakes
doubleurx- I think the issue is the August break. My car must not have made the cutoff before the vacation, and so I am getting the engine swap Sep 12 and will get the car early Nov. So we are about 2 months apart instead of 1 due to loss of August. Anyway, that's my best guess but perhaps there is nothing logical to it.